Printer Friendly
The Free Library
14,506,803 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

WaferMasters Introduces Industry's First Low-Cost Mini Batch Furnace for 200 mm and 300 mm Semiconductor Wafer Fabrication.


Business Editors/High-Tech Writers

SEMICON SEMICON Semiconductors Equipment and Material International Conference  West 2003

Booth 4001 Esplanade

SAN JOSE, Calif.--(BUSINESS WIRE)--July 14, 2003

WaferMasters, Inc. today introduced its new MBF MBF Thousand Board Feet
MBF My Best Friend
MBF Microsoft Business Framework
MBF Medical Benefits Fund
MBF My Boyfriend
MBF Man's Best Friend
MBF Management By Fact
MBF Master Business Function (J.d.
 Mini Batch Furnace, a single chamber multi-process tool for 200 mm and 300 mm chip manufacturing. The MBF platform offers customers a low-cost system for new applications where small wafer lots are processed, especially in foundry type manufacturing. Exceptional process uniformity and repeatability make the MBF ideal for producing next-generation devices on large 300 mm wafers, and the small batch sizes offer a hedge against catastrophic yield loss. The MBF is a productive alternative to large batch furnaces.

Large batch furnaces often stand idle waiting for sufficient wafers to make a full production run. Customers typically avoid production bottlenecking by adding dummy wafers to the queue, a practice that adds unnecessary wafer handling and material costs. The MBF, by virtue of its small batch size, eliminates wafer queuing, assures a balanced production flow, and improves productivity.

WaferMasters' MBF Mini Batch Furnace is a fully integrated platform that incorprates a single 26-wafer process chamber, power supply, vacuum pump, and automated wafer handling -- three MBF systems have a combined clean room footprint equal to one high-volume batch furnace. The simplified design ensures rapid setup, ease of operation, low operating cost, and exceptional reliability. WaferMasters thermal production tools have few consumable parts and typically provide better than 99.5% uptime and more than 5,000 hours MTBF (Mean Time Between Failure) The average time a component works without failure. It is the number of failures divided by the hours under observation.

MTBF - Mean Time Between Failures
. Maximum power consumption is a mere 10 kW.

Based on WaferMasters' proven isothermal i·so·ther·mal
adj.
Of, relating to, or indicating equal or constant temperatures.



isothermal, isothermic

having the same temperature.
 chamber technology and an innovative new internal heater, the MBF offers improved process repeatability and stability, with clone-like consistency between systems. Temperature uniformity is better than +/-1 degree centigrade within-a-wafer, wafer-to-wafer, and run-to-run. This exceptional temperature stability meets customer demands for tighter CD control and more repeatable results, requirements considered essential for meeting the stringent specifications of nanometer feature sizes, device speed, and high production yields.

"We wanted the MBF to give our customers extended process capability," said Dr. Woo Sik Yoo, president and CTO (Chief Technical Officer) The executive responsible for the technical direction of an organization. See CIO and salary survey.  of WaferMasters, Inc., "so we designed the system to support all annealing annealing (ənēl`ĭng), process in which glass, metals, and other materials are treated to render them less brittle and more workable.  applications, including implant annealing and salicidation, as well as thermal oxidation at temperatures up to 1,000 degrees centigrade. Other applications for the MBF include thermal nitridation, high-k annealing, BPSG BPSG Boron-Doped Phosphosilicate Glass  reflow and densification, and thermal CVD CVD Cardiovascular disease, see there ."

"We believe it is critical for our customers to have the most productive and reliable equipment possible," continued Dr. Yoo. "Our new MBF Mini Batch Furnace combines remarkable process flexibility and temperature uniformity with high equipment utilization to give customers the lowest cost of ownership in the industry for thermal production tools."

The MBF Mini Batch Furnace is priced in the U.S. at $1.2 - 1.5 million, depending on options. Delivery is 12 weeks ARO.

About WaferMasters, Inc.

WaferMasters, Inc., founded in 1999, is a privately held manufacturer of thermal production tools used to fabricate advanced semiconductor devices. The company's core philosophy is to produce elegantly simple equipment engineered to give customers stable and reproducible process results in a high production environment. Reduced process monitoring and high equipment utilization, combined with minimum consumables usage and low maintenance contribute to the lowest COO in the industry for RTP (1) (Rapid Transport Protocol) The protocol used in IBM's High Performance Routing (HPR) system.

(2) (Realtime Transport Protocol) An IP protocol that supports real time transmission of voice and video.
 equipment. WaferMasters, Inc. maintains headquarters at 246 East Gish Road, San Jose, California San Jose (IPA: /ˌsænhoʊˈzeɪ/) is the third-largest city in California, and the tenth-largest in the United States. It is the county seat of Santa Clara County.  95112. Visit WaferMasters on the web at www.wafermasters.com, or at SEMICON West, Booth 4001 Esplanade level.
COPYRIGHT 2003 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2003, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Geographic Code:1USA
Date:Jul 14, 2003
Words:565
Previous Article:Peninsula Holdings Group Further Enhances Board of Directors; Industry Veterans to Assist Management with Implementation of Strategic Goals.
Next Article:Nettel Holdings Began to Receive Payments for Selling Wholesale Minutes Run Through Their Switch, Regarding Previous Contracts.



Related Articles
TEL and WaferMasters Agree to Develop Highly Energy-Efficient 300mm Single Wafer Rapid Thermal Furnace.
Semitool Wins Order for 300 mm Spectrum -- Taiwan Foundry Selects Spectrum for Photoresist Stripping Process.
Semitool Delivers Millennium 300 Single-Wafer Processor to Major Foundry Customer in Taiwan.
Intel to Restart Construction of $2 Billion Manufacturing Facility; Expands Capacity For Advanced 300 MM Wafer Production on 90-Nanometer Process.
AMD and UMC Announce 300-mm Collaboration in Advanced Process Control Technology.
Intel to Convert Arizona Factory to 300 MM Technology; $2 Billion Investment to Create Company's Fifth 300-mm Factory.
WaferMasters, Inc. Awarded Key Patent and Order for Flash Annealing Technology That Enables Diffusion-Free Activation of Ultra Shallow Junctions in...
Elpida Memory Expands Semiconductor Production Facilities; Construction Begins on Second 300 mm Fabrication Plant and First 300 mm Fab Set to Boost...
WaferMasters and TEL Announce Agreement on SRTF Technology.
Integrated Materials Launches SiFusion(TM) Poly Silicon Furnaceware Worldwide; Semiconductor Manufacturers Achieve Significant Defect Density...

Terms of use | Copyright © 2009 Farlex, Inc. | Feedback | For webmasters | Submit articles