Upcoming Osprey flight tests are do-or-die.The Marine Corps plans to stand up its first squadron of V-22 Ospreys by December 2003 and begin operational evaluation The test and analysis of a specific end item or system, insofar as practicable under Service operating conditions, in order to determine if quantity production is warranted considering: a. the increase in military effectiveness to be gained; and b. by November of the following year. By then, however, the tilt rotor aircraft will have gone through further flight and de-icing tests, before pilots take the plane out to sea. The goal is to give pilots enough time to become well acquainted with the aircraft before the operational evaluation, said Osprey osprey (ŏs`prē), common name for a bird of prey related to the hawk and the New World vulture and found near water in most parts of the world. Program Manager Marine Col. Dan Schultz. "[We are] two years away from deploying. By that time, we'll have pilots with a lot of experience on that plane before they ever take it out to a ship," Schultz said. The V-22 is expected to join the fleet in December 2005, the earliest it can enter combat, Schultz said. There will be eight crews (a total of 16 pilots) once the V-22 goes into a five-month operational evaluation. But program officials insist that deadlines are not a top priority. "The V-22 is event, and not schedule, driven," said one Marine official. Once OP EVAL is completed, six V-22s will continue to run through flight tests while the remainder will go to VMMT VMMT Marine Medium Tilt Rotor Training Squadron 04--the V-22 training squadron, said Ward Carroll, from V-22 public affairs Those public information, command information, and community relations activities directed toward both the external and internal publics with interest in the Department of Defense. Also called PA. See also command information; community relations; public information. . Osprey 8 was to continue with High Rate of Descent (HROD HROD High Rate of Descent HROD Human Resource and Organizational Development ) testing. But program officials and engineers believe they now have a handle on Vortex Ring 1. (Physics) A ring-shaped mass of moving fluid which, by virtue of its motion of rotation around an axis disposed in circular form, attains a more or less distinct separation from the surrounding medium and has many of the properties of a solid. State (VRS (Video Relay Service) A communications service for the hearing or speech impaired. A VRS is the video counterpart of a TTY relay service, in which the user types on a terminal, and the relay operator speaks the messages to the recipient (see TDD/TTY). ). That led to a decision to skip a second round of testing. VRS occurs when a rapidly descending helicopter flies through its own downwash down·wash n. Downward air turbulence caused by the motion or action of a propeller or jet: the downwash of the helicopter blades. and becomes unstable. "We have a grasp of [VRS] now," Carroll said. "[There is] nothing we don't understand." Warning lights and alarms will give V-22 pilots 18 seconds to react before going into VRS, Schultz said. That warning gives them enough time to begin tilting the rotors to fly out of VRS. "The V-22 is much less susceptible to Vortex Ring State [than a helicopter]," Schultz said. Osprey 8 now will have to wait until a test group determines what to replace the HROD tests with. The group currently is looking at other test options, Carroll said. Osprey 10, at the moment, is undergoing mission software testing Software testing is the process used to measure the quality of developed computer software. Usually, quality is constrained to such topics as correctness, completeness, security, but can also include more technical requirements as described under the ISO standard ISO 9126, such . Osprey 21 is going through night-formation flight testing and austere landing tests. Osprey 22 is in mission software and austere landing testing. Osprey 23 (CV-22)--the Air Force Special Operations Command Air Force Special Operations Command (AFSOC) was established 22 May, 1990,with headquarters at Hurlburt Field, Fla. AFSOC is a United States Air Force (USAF) major command and is the air component to the United States Special Operations Command (USSOCOM), a unified command version--is undergoing operational testing (testing) operational testing - A US DoD term for testing performed by the end-user on software in its normal operating environment. as a training asset, Carroll said. Osprey numbers 11 through 20 have been delivered to the Marine Corps and are awaiting Block A changes. Those aircraft are flown at the New River Marine Corps Air Station, North Carolina North Carolina, state in the SE United States. It is bordered by the Atlantic Ocean (E), South Carolina and Georgia (S), Tennessee (W), and Virginia (N). Facts and Figures Area, 52,586 sq mi (136,198 sq km). Pop. and other Marine Corps bases, a Boeing spokesman said. Aircraft number 30 through 44 are in assembly and awaiting Block A changes. Boeing and Textron's Bell Helicopter Bell Helicopter Textron is an American helicopter and tiltrotor manufacturer headquartered in Fort Worth, Texas. A division of Textron, Bell manufactures military helicopter and tiltrotor products in the United States (primarily in and around Fort Worth as well as in Amarillo, subsidiary are the prime contractors for the V-22. Issues with hydraulic lines rubbing against electrical lines also have been resolved, Schultz said. Past crashes had been linked to burst hydraulic lines. Those lines no longer touch each other. The lines also were reconfigured to allow them to fold up, without causing any problems, when the V-22's wings are retracted re·tract v. re·tract·ed, re·tract·ing, re·tracts v.tr. 1. To take back; disavow: refused to retract the statement. 2. . Schultz said the hydraulic glitches have been fixed. Months of testing have shown that the V-22 can carry external payloads, deliver cargo and land on an amphibious assault ship. Lt. Col. Kevin Gross, Marine Corps chief government test pilot, said landing the aircraft on the USS Iwo Jima Two ships of the United States Navy have been named USS Iwo Jima, in memory of the Battle of Iwo Jima, as well as another ship never completed.
abbr. Latin Litterarum Humaniorum Doctor (Doctor of Humanities; Doctor of Humane Letters) 7) was an "incredible experience." The Osprey was quite stable and easy to handle, especially in the wind, he said. Concerns about the V-22 hanging over the deck edge were "almost not apparent," Gross said. In a recent external payload test, a V-22 lifted almost 11,000 pounds, Schultz said. However, some work still needs to be done with mounting external payloads because of the high speed with which the V-22 can operate. In one test, the front window of a Humvee was shattered. "[It] can't take a Humvee over 200 knots," Schultz said. Osprey 24 will begin anti-icing and de-icing tests this winter in Nova Scotia. Tests will take place over the course of two winters. Engineers will test an anti-icing heat system and a second system to shake ice from the plane's wings, Carroll said. Tests must show that the V-22 can fly into high altitudes (up to 25,000 feet) during winter conditions. The tests, however, were originally not to take place until after the first squadron was stood up. "I'm not really happy [with the] fact we [were] about to field an airplane ... that can fly to 25,000 feet that didn't have a de-icing system," Schultz said. "We changed that. We dedicated one full plane [to de-icing testing]" Steve Grohsmeyer, a Boeing test pilot with almost 500 hours flying time on the V-22, said refueling tests, with both the KC-130 and KC-10, have gone well. Boeing will do additional refueling tests this fall, he added. The V-22 will eventually have a retractable re·tract v. re·tract·ed, re·tract·ing, re·tracts v.tr. 1. To take back; disavow: refused to retract the statement. 2. fuel node, said Grohsmeyer, who has been with the program for almost eight years. At Edwards Air Force Base Edwards Air Force Base, U.S. military installation, 301,000 acres (121,805 hectares), S Calif., NE of Lancaster; est. 1933. It is one of the largest air force bases in the United States and has the world's longest runway. in Southern California, Osprey 9 (CV-22), a U.S. Special Operations Command A subordinate unified or other joint command established by a joint force commander to plan, coordinate, conduct, and support joint special operations within the joint force commander's assigned operational area. Also called SOC. See also special operations. Osprey, will undergo countermeasure tests with SIRFC SIRFC Suite of Integrated Radio Frequency Countermeasures (Suite of Integrated RF Countermeasures) and DIRCM DIRCM Directed Infrared Countermeasures DIRCM Directional Infrared Countermeasure (Directional Infrared Countermeasures) beginning in October. The tests are expected to run through March 2004. Once those tests are finished, Osprey 9 will stand down for Block 10 (DIRCM and LRIP LRIP Low Rate Initial Production LRIP Limited Rate Initial Production LRIP Logistics Readiness Improvement Program SIRFC) modifications. The second part of SIRFC and DIRCM testing will start in October 2004 and run through April 2006, said Carroll. SIRFC testing will be done on Edwards Range Complex and China Lake's Electronic Combat Range, in California, and the Nellis Test and Training Range, in Nevada. The bulk of the testing will be split between China Lake and Nellis, Carroll said. DIRCM testing will be mostly done at Edwards, he added. Tests began earlier this year on the CV-22's multi-mode (terrain tracking) radar. Carroll said the tests have gone "extremely well, having completed level terrain as well as low and high isolated peak testing." SIRFC gives pilots advanced warning to allow them to fly around threats. DIRCM is a missile detection program that jams the radio frequency of an incoming missile and directs it away from the aircraft. "It's like hitting tennis balls against a wall," Schultz said. Engineers at Edwards have also been "wringing out the terrain following warnings and cautions," Carroll added. Weather-related tests also planned to address issues such as "brown out," Carroll said. "Brown out" occurs when a hovering aircraft kicks up large amounts of dust and debris, he added. The dust can obscure a pilot's view of the landing zone. But the V22's ability to "cant its thrust line and its advanced displays will mitigate the problems due to brown out," Carroll said. Composite materials are being used on the V-22 to deflect heat, and engine suppressors will contain heat coming off of the engines to diminish the Osprey's heat signature. A lightweight prototype paint, designed to give the V-22 "unprecedented levels" of IR signature is being used on Osprey 22, Schultz said. "[It] takes the heat signature down to an unprecedented level," he said. The paint sells for about $7,000 a gallon. In July 2004, a V-22 will begin the first in a series of tests using an electric hoist, to examine its search and rescue capability. Program officials are also looking at weapons to provide defensive capabilities for the V-22. However, these are still in the concept stages said one Marine pilot. Schultz said he has been pleased by the V-22's performance during flight tests. Although he said it is too early to call it a victory, he did say that what officials are seeing is "very encouraging." The aircraft has been put through hell, he said. "This is not a fluffy test program." "The V-22 has met its key performance parameters," he added. Schultz predicted that when the first V-22 is fielded, it would be the "last time a helicopter will ever do combat, and search and rescue operations." The V-22 returned to flight testing May 29, 2002, after being grounded for almost 17 months. Two crashes that took the lives of 30 Marines almost spelled the end for the V-22 program. Congress and the Defense Department put the program into a holding pattern as teams worked out the problems. Schultz was scheduled to appear before the Defense Acquisition Board on July 31 to discuss increasing the number of V-22s to be produced, refining the budget estimates and re-examining the increased capabilities the services want for interoperability with the Joint Tactical Radio System and Link 16 (tactical data link). His meeting with the board comes almost two months after former-Undersecretary of Defense Edward C. "Pete" Aldridge Jr.--once a critic of the program--wrote that the "program's progress is sufficient to consider increasing the production rate above the minimum sustaining rate." That rate was set at 11 per year by Congress and the Pentagon after the investigation into the fatal crashes. "We have to start looking at how to ramp up Ramp Up To increase a company's operations in anticipation of increased demand. Notes: A company might 'ramp up' operations if they just signed a contract creating substantially more demand for their product. See also: Demand, Economies of Scale ," Schultz said. Plans call for 11 V-22s to be produced in 2005 and 20 in 2006. Schultz said he hopes to see production rates increase to 40 a year when the Marine Corps, Navy and the Special Operations Command begin purchasing the aircraft. The Marine Corps is planning to buy 360 V-22 to perform amphibious assault and land operations. The Navy will buy 48 for search and rescue, and the U.S. Special Operations Command plans to buy 50 for long-range special operations. The V-22 costs $68.7 million each, Schultz said. However, he hopes to reach a target cost of $58 million by fiscal year 2010. |
|
||||||||||||||||||

Printer friendly
Cite/link
Email
Feedback
Reader Opinion