Printer Friendly
The Free Library
5,673,993 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

UPGRADE COMING FOR WEST BORON.


Byline: Karen Maeshiro Staff Writer

BORON boron (bōr`ŏn) [New Gr. from borax], chemical element; symbol B; at. no. 5; at. wt. 10.81; m.p. about 2,300°C;; sublimation point about 2,550°C;; sp. gr. 2.3 at 25°C;; valence +3.  - Muroc Joint Unified School District A unified school district is a school district which includes both primary school (kindergarten through middle school or junior high) and high school (grades 9-12). In Illinois, these districts are called unit school districts.  trustees have accepted a bid for the $1.3 million modernization modernization

Transformation of a society from a rural and agrarian condition to a secular, urban, and industrial one. It is closely linked with industrialization. As societies modernize, the individual becomes increasingly important, gradually replacing the family,
 of West Boron Elementary School elementary school: see school. .

The lowest bid, from Valley Construction, was several hundred thousand dollars more than expected, so district officials might have to reduce the scope of work.

``We will try and work with the successful bidder to do change orders to reduce the scope a bit to get back within budget,'' Superintendent Mike Summerbell said.

One possibility is to drop plans to replace windows with energy-efficient ones, Summerbell said.

Other work planned for the 50-year-old campus includes making it accessible to the disabled, adding insulation to walls and upgrading air-conditioning and heating systems.

The West Boron school has 380 pupils from kindergarten kindergarten [Ger.,=garden of children], system of preschool education. Friedrich Froebel designed (1837) the kindergarten to provide an educational situation less formal than that of the elementary school but one in which children's creative play instincts would be  through sixth grade.

State funding will cover 60 percent of the project's cost, and the district's share will be paid with a long-term loan.

The district has done modernization work at all of its campuses except West Boron and Boron High School.

Modernization of the Boron High School campus was canceled because the district officials were tardy tar·dy  
adj. tar·di·er, tar·di·est
1. Occurring, arriving, acting, or done after the scheduled, expected, or usual time; late.

2. Moving slowly; sluggish.
 in sending back plans for the $1.2 million project to the state.

The district is challenging the cancellation, and attorneys for the district will be meeting with officials from the Department of the State Architect to try to get the project reinstated, Summerbell said.

Karen Maeshiro, (661) 267-5744

karen.maeshiro(at)dailynews.com
COPYRIGHT 2005 Daily News
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2005, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Daily News (Los Angeles, CA)
Date:Oct 11, 2005
Words:238
Previous Article:FLYING WITH EAGLES SMALL SAILPLANE MAY HAVE BIG IMPACT ON UAVS.(News)
Next Article:MUSD APPLICATIONS DUE BY NOV. 4.(News)



Related Articles
BRIEFLY; CHARGES AGAINST MAN DISMISSED.(News)
MULES TO HEADLINE NAMESAKE FESTIVAL.(News)
DESERT HIGH RENOVATION TO BEGIN THIS SUMMER.(News)
DESERT HIGH TO GET MAKEOVER.(News)
WEST BORON CAMPUS TO BE REFURBISHED.(News)
MEASURE MAY HEAD TO VOTERS BOND WOULD POSSIBLY FUND MUROC SCHOOLS.(News)
MODERNIZATION PLAN AT BORON HIGH STILL ALIVE.(News)
MUROC VOTERS SHOW SUPPORT FOR BOND MEASURE POLL INDICATES 65 PERCENT OF RESIDENTS WOULD PAY TO FUND DISTRICT PROJECTS.(News)
PASSENGER THROWN FROM OVERTURNED AUTO, DIES.(News)
MEETINGS TO COVER POSSIBILITY OF BOND MEASURE WOULD FUND FIXES FOR AGING SCHOOLS.(News)

Terms of use | Copyright © 2009 Farlex, Inc. | Feedback | For webmasters | Submit articles