Troy Resources NL: Report on Activities for the Quarter Ended 30 June 2005.


WEST PERTH, Western Australia West Perth is a suburb 600 metres west of Perth, the capital city of Western Australia. It is part of the inner mixed zone, and has predominately office blocks which have displaced residential buildings.  -- Troy Resources NL (ASX ASX

See: Australian Stock Exchange
:TRY)(FRANKFURT:TRW TRW The Real World (TV reality show)
TRW The Right Way
TRW Tactical Reconnaissance Wing
TRW The Retriever Weekly (University of Maryland, Baltimore, MD)
TRW Thompson Ramo Wooldridge Inc
) -

HIGHLIGHTS

PRODUCTION

- Sertao Project (Troy 70%) in Brazil treated 24,360 tonnes of ore at 19.53g/t Au to produce 14,448oz of gold at a cash cost of A$ 141 per ounce (US$ 107).

- Sandstone sandstone, sedimentary rock formed by the cementing together of grains of sand. The usual cementing material in sandstone is calcium carbonate, iron oxides, or silica, and the hardness of sandstone varies according to the character of the cementing material; quartz  Mill (Troy 100%) treated 122,006 tonnes of ore at 1.24g/t Au to produce 4,542oz of gold at a cash cost of A$454 per ounce from remaining low-grade stockpiles while awaiting ore from development of the Lord Nelson deposit.

- Attributable gold production of 14,656 ounces for the June quarter.

- Attributable gold production of 71,851 ounces for the 2004/05 financial year.

DEVELOPMENT

- The newly discovered orebody extension at the Sertao Mine in Brazil contains a Probable Reserve estimated as 54,500 tonnes @ 30.94g/t for 54,200 contained ounces. Mining of this very high-grade deposit commenced in May and is anticipated to be highly profitable.

- Mining commenced at Lord Nelson at Sandstone in April 2005. Milling of Lord Nelson ore at the Sandstone Mill is scheduled to commence in August 2005.

- Proved and Probable Reserve for the Lord Nelson and Lord Henry deposits is estimated at 2.0 million tonnes @ 3.13g/t for 201,000 contained ounces. Indicated and Inferred Resources are estimated at 4.1 million tonnes @ 2.71g/t for 354,000 ounces.

EXPLORATION

- An Indicated and Inferred Resource of 860,000 tonnes @ 2.12g/t for 58,700 contained ounces is estimated for the Antena Cluster deposits in the Goias Velho Project in Brazil.

- Strategically located exploration licences covering 1,000,000 hectares granted in Mongolia. The property is prospective for gold, coal and uranium, with particular interest currently focused on the coal potential. The tenements straddle In the stock and commodity markets, a strategy in options contracts consisting of an equal number of put options and call options on the same underlying share, index, or commodity future.  the main rail line to China and are located between Ivanhoe Mines Oyut Ulaan and Chandman Uul gold projects.

CORPORATE

- Royalties over the Lords deposits at Sandstone purchased.

- Mr Peter Doyle Peter Doyle is an American voice actor who is well known for his role in Eureka Seven as Dominic Sorel. Doyle has also provided voices in shows such as Rurouni Kenshin. Notable roles
  • Avenger as Citizen A (ep 13); Commander (ep 12); Teo (ep 10)
 appointed as Exploration and Business Development Manager.

- Group cash and equivalent liquid assets Cash, or property immediately convertible to cash, such as Securities, notes, life insurance policies with cash surrender values, U.S. savings bonds, or an account receivable.  of A$34.5 million.

CORPORATE

PRODUCTION FORECAST

Troy anticipates that, with the development of the Lords and the high-grade Stage 5 at the Sertao Mine, attributable gold production for the 2005/06 year from all sources will be approximately 100,000 ounces. Ongoing acquisition and exploration activities are focused on adding to this production level.

PURCHASE OF LORDS ROYALTIES

During the quarter, Troy purchased two production royalties held by two parties over Troy-owned tenements E57/422, E57/424, M57/529 and M57/530 which include the Lord Henry and Lord Nelson gold deposits ("Lords") where Troy commenced mining in late April.

The first royalty of $10 per ounce of gold produced was purchased for A$1,100,000 plus the issue of 200,000 fully paid ordinary Troy shares. The second royalty of $5 per ounce of gold produced (capped at a maximum of $250,000) was purchased for A$232,000.

Elimination of these royalty interests royalty interest

The proportional ownership interest by the owner of oil and gas rights in income produced by the asset. See also overriding royalty interest.
 allows the Company greater operational flexibility, as any other Troy-owned ore in the Sandstone area can now be blended with ore from the Lords.

APPOINTMENT OF BUSINESS DEVELOPMENT MANAGER

Troy has appointed Mr Peter Doyle as Exploration and Business Development Manager. Peter was born in Canada and has an Honours B.Sc in Geology degree from Laurentian University Laurentian University, main campus at Sudbury, Ont., Canada; bilingual, coeducational; founded 1960. Among its faculties are those in astronomy, commerce, computer science, education, engineering, law, mathematics, music, native studies, nursing, physics, and social  at Sudbury in Canada. He has 25 years experience in mineral exploration around the world and especially in North America North America, third largest continent (1990 est. pop. 365,000,000), c.9,400,000 sq mi (24,346,000 sq km), the northern of the two continents of the Western Hemisphere.  and Indonesia. Prior to joining Troy, Peter spent nearly seven years as Regional Geologist for Gold Fields Gold Fields Limited is one of the world’s largest unhedged producers of gold, providing investors with maximum leverage to the gold price. The company was formed in 1998 with the amalgamation of the gold assets of Gold Fields of South Africa Limited and Gencor Limited.   Limited of South Africa South Africa, Afrikaans Suid-Afrika, officially Republic of South Africa, republic (2005 est. pop. 44,344,000), 471,442 sq mi (1,221,037 sq km), S Africa.  based in Perth with responsibility for project evaluation and development in the Australian/Asian region which included considerable time assessing projects in China.

MINING REPORT
GOIAS VELHO PROJECT
                       SERTAO GOLD MINE, BRAZIL
                              (Troy 70%)

---------------------------------------------------------------------
               GOLD PRODUCTION 100% : SERTAO GOLD MINE
---------------------------------------------------------------------
                    June 2005  June 2004  12 Months to  12 Months to
                      Quarter    Quarter  30 June 2005  30 June 2004
---------------------------------------------------------------------
Tonnes Milled          24,360     24,206        98,820        85,360
---------------------------------------------------------------------
Head Grade          19.53 g/t  29.26 g/t     22.86 g/t     32.01 g/t
---------------------------------------------------------------------
Recovery               94.5 %    98.62 %        95.8 %       98.27 %
---------------------------------------------------------------------
Gold Produced       14,448 oz  22.461 oz     69,580 oz     86,335 oz
---------------------------------------------------------------------
Cash Cost per oz       A$ 141      A$ 73        A$ 129         A$ 64
                     (US$ 107)   (US$ 50)      (US$ 98)      (US$ 44)
---------------------------------------------------------------------

"Cash Costs" are defined to include all expenditures directly
incurred on mining and milling, plus overheads and outgoings net of
movements in deferred mining costs and stockpiles, but exclude
Government gold royalty payments.



MINING

In the March 2005 Quarterly Report Troy announced the discovery of a new high-grade ore zone, designated "Stage 5", at the Sertao Mine. The new zone, which occurs immediately adjacent to the southern limit of the Sertao pit (Figure 1), was then forecast to contain more than 20,000 ounces. Subsequent extensional and infill in·fill  
n.
1. The use of vacant land and property within a built-up area for further construction or development, especially as part of a neighborhood preservation or limited growth program.

2.
 drilling completed in the June quarter has provided sufficient data for Snowden Mining Industry Consultants ("Snowden") to estimate Reserves for Stage 5 of:
Probable Reserve:
54,500t @ 30.94g/t Au for 54,200 contained ounces



Details of the estimation methodology are provided in Appendix 1. The Reserve relates only to the open pit extractable portion of the new ore zone.

Mining of this new Stage 5 commenced in May and ore will be delivered to the mill during September and December quarters resulting in substantial increases in quarterly production.

Operating results to date from Stage 5 have compared favourably with the costs used for the optimisation study.

During June 3,000t of ore was mined at a grade of 34.5g/t Au versus the block model grade at 33.4g/t. The very high grade of Stage 5 will ensure very low cost per ounce production.

The potential for underground mining of extensions to the new mineralised zone is yet to be fully assessed.

MILLING

The processing plant has performed flawlessly flaw·less  
adj.
Being entirely without flaw or imperfection. See Synonyms at perfect.



flawless·ly adv.
 during the year.

NEAR MINE EXPLORATION

Near mine exploration is ongoing. Drilling, using an RC rig and a diamond drill rig, is currently focused on testing Stage 6, a recently discovered mineralised system immediately adjacent to the northern edge of the Sertao pit.

SAFETY AND ENVIRONMENT

There have been no environmental problems or serious safety issues.
SANDSTONE OPERATIONS
                      (Troy Group 100%)

-----------------------------------------------------------
                            GOLD PRODUCTION
-----------------------------------------------------------
                                      June       12 months
                                      2005              to
                                   Quarter    30 June 2005
-----------------------------------------------------------
Tonnes Milled                      122,006         503,752
-----------------------------------------------------------
Head Grade                        1.24 g/t        1.26 g/t
-----------------------------------------------------------
Recovery                            93.4 %          93.8 %
-----------------------------------------------------------
Gold Produced                     4,542 oz       19,148 oz
-----------------------------------------------------------
Cash Cost per oz                    A$ 454          A$ 437
-----------------------------------------------------------
"Cash Costs" are defined to include all expenditures directly
incurred on mining and milling, plus overheads and outgoings net
of movements in deferred mining costs and stockpiles, but exclude
Government gold royalty payments.



MILLING

The operating results for the quarter were in line with forecast, with mill feed being sourced from Bulchina Mine low-grade stockpile stock·pile  
n.
A supply stored for future use, usually carefully accrued and maintained.

tr.v. stock·piled, stock·pil·ing, stock·piles
To accumulate and maintain a supply of for future use.
 pending sufficient ore from the new Lords Project being available for milling. Milling of Lord Nelson ore is scheduled to commence in August 2005.

Upgrade work at the Sandstone Mill progressed during the quarter with civil construction for leach leach  
v. leached, leach·ing, leach·es

v.tr.
1. To remove soluble or other constituents from by the action of a percolating liquid.

2.
 tanks, relocation RELOCATION, Scotch law, contracts. To let again to renew a lease, is called a relocation.
     2. When a tenant holds over after the expiration of his lease, with the consent of his landlord, this will amount to a relocation.
 of the mill administration, workshop and stores buildings as well as construction of a new site laboratory facility. Additional leach tanks, which will add to circuit residence time, will be installed by the end of August. The process plant upgrade is scheduled for completion by October.

HEALTH, SAFETY AND ENVIRONMENT

There were no Lost Time Injuries recorded during the quarter and no reportable environmental issues

GENERAL

During the quarter the Sandstone camp facilities upgrade was completed to provide a modern accommodation village with facilities for 100 employees.

DEVELOPMENT REPORT

LORD HENRY AND LORD NELSON SANDSTONE

(Troy Group 100%)

On 31 January 2005, an Indicated and Inferred Resource for the Lords of 354,000 ounces was reported to the Australian Stock Exchange Australian Stock Exchange (ASX)

Australia's major securities market, formed when the six state stock exchanges (Adelaide, Brisbane, Hobart, Melbourne, Perth, and Sydney stock exchanges) were merged in 1987.
.

The following Probable Reserves have now been estimated by Snowden:
Lord Nelson
1.48 million tonnes @ 3.33g/t for 159,000 ounces

Lord Henry
0.51 million tonnes @ 2.53g/t for 42,000 ounces

Total
2.00 million tonnes @ 3.13g/t for 201,000 ounces.



Details of the estimation methodology are provided in Appendix 1.

Mining is now well under way at Lord Nelson with Lord Henry being scheduled to come on stream during October.

Ore mined from Lord Nelson is currently being stockpiled at the mine site with treatment scheduled to commence in August.

The current Reserves for the Lords Project will ensure processing for approximately 3.5 years. Additional ore from the Ladybird and Havilah deposits is likely to be introduced during this period and, subject to plant processing rates being unchanged, will add to the Sandstone project life.

Metallurgical met·al·lur·gy  
n.
1. The science that deals with procedures used in extracting metals from their ores, purifying and alloying metals, and creating useful objects from metals.

2.
 testwork to assess the potential to heap leach treat lower grade Lord Henry mineralisation (currently excluded from Reserves) will be completed during the September quarter. If successful, the Reserve position will be reviewed.

Success from Troy's extensive exploration programme in the highly prospective Sandstone project area also has potential to add to resources.

EXPLORATION REPORT

GOIAS VELHO PROJECT, BRAZIL

(Troy 70%)

ANTENA CLUSTER

Resource calculations and mine designs have been carried out for the Antena cluster prospects. The optimisations and designs for Xupe and Antena appear viable and are currently undergoing internal checks. Other project areas require further detailed study with ongoing exploration drilling, and a dipole-dipole IP survey has commenced over selected targets at the Antena Cluster to assist in location of sulphide-associated ore shoots.

Pilot scale vat leaching leaching, method of extraction in which a solvent is passed through a mixture to remove some desired substance from it. A simple example is the passage of boiling water through ground coffee to dissolve and carry out the chemicals necessary for producing the beverage.  trials of Antena Cluster oxide mineralisation have indicated a recovery of approximately 61%. Further trials are to be completed to assess the economics of treating the mineralisation in leach vats constructed at Antena.

During the quarter, Snowden was commissioned to provide a resource estimate for the Antena Cluster. Resource estimates, based on a 1.0g/t Au cut-off cut-off Anesthesiology The point at which elongation of the carbon chain of the 1-alkanol family of anesthetics results in a precipitous drop in the anesthetic potential of these agents–eg, at > 12 carbons in length, there is little anesthetic activity, , for Antena West, Antena View, Antena, Antena Sul and Xupe deposits collectively are:
Indicated Resource:
0.66 million tonnes @ 2.21g/t Au for 46,700 ounces

Inferred Resource:
0.20 million tonnes @ 1.84g/t Au for 12,000 ounces

Total Indicated and Inferred Resources:
0.86 million tonnes @ 2.12g/t Au for 58,700 ounces



The Xupe deposit remains open and further drilling is planned.

Other Areas

Sertao Mineracao Ltda ("SML 1. SML - Standard ML.
2. SML - Small Machine Language. Barnes, ICI 1969. Real-time language, an ALGOL variant, and the predecessor of RTL. "SML User's Guide", J.G.P. Barnes, ICI, TR JGPB/69/35 (1969).
") focused on evaluating geochemical targets in the northern portion of the Faina Greenstone Belt Greenstone belts are zones of variably metamorphosed mafic to ultramafic volcanic sequences with associated sedimentary rocks that occur within Archaean and Proterozoic cratons between granite and gneiss bodies. . A comprehensive independent review of the Goias Velho Project, based on available geological, geochemical and geophysical ge·o·phys·ics  
n. (used with a sing. verb)
The physics of the earth and its environment, including the physics of fields such as meteorology, oceanography, and seismology.
 data, was also completed during the quarter. It highlighted several new targets requiring field assessment.

Elsewhere in the northern part of the project area, geological mapping and RAB Rab (räb), Ital. Arbe, island (1991 pop. 9,205), 40 sq mi (104 sq km) off Croatia, in the Adriatic Sea. One of the Dalmatian islands, it is a popular seaside resort. Fishing and agriculture are the main occupations.  drilling tested the Capoeirinha West, Santa Rita Santa Rita may refer to:
  • Rita of Cascia, a Catholic saint
Places
  • Brazil
  • Santa Rita, Macapá, a borough in the city of Macapá in Amapá state
, Bananal North and Cachoeira prospects. Better intersections included (Table 1):
Capoeirinha West:    2m @ 3.72g/t Au (from 5m) and
                     1m @ 9.68g/t Au (from 9m)
Santa Rita:          8m @ 4.24g/t Au (from 12m)
Cachoeira:           3m @ 2.29g/t Au (from 2m).



SANDSTONE PROJECT

(Troy 100%)

Exploration activities continued to assess regional geochemical and geophysical anomalies, particularly the Coomb coomb or coombe
Noun

a short valley or deep hollow [Old English cumb]
 Bore Prospect about 3km north-east of the Lords gold deposits on the eastern margin of the Sandstone Greenstone Belt.

Initial RAB drilling at the Coomb Bore Prospect defined a 500 x 50m zone of low-grade gold mineralisation in sheared sheared  
adj.
Shaped or finished by shearing, especially cut or trimmed to a uniform length: a sheared fur coat.

Adj. 1.
 mafic maf·ic  
adj.
Containing or relating to a group of dark-colored minerals, composed chiefly of magnesium and iron, that occur in igneous rocks.
 and granitic rocks within the Edale Structural Corridor. Better intersections include 17m @ 0.6g/t Au (from 5m to end of hole), 30m @ 0.26g/t Au and 11m @ 0.36g/t Au. The initial results are considered encouraging and ongoing exploration is planned in this highly prospective corridor.

Further RC drilling at Musketeer South, located along the Perrystone Shear shear: see strength of materials.
Shear

A straining action wherein applied forces produce a sliding or skewing type of deformation.
 approximately 11.5km east of Troy's Sandstone Mill, tested for primary gold mineralisation within the central portion of the 80m long mineralised zone. A narrow, steeply-dipping alteration zone with ubiquitous quartz stringers and minor sulphide sulphide: see sulfide.   mineralisation was intersected below a previously defined zone of supergene su·per·gene  
n.
A group of closely linked genes occupying a large chromosomal segment and frequently functioning as a genetic unit.
 mineralisation. The best intersection was 3m @ 1.28g/t (from 77m). Further drill testing of the Perrystone Shear is planned, particularly in the zone of intense hydrothermal hydrothermal, hydrothermic

relating to the temperature effects of water, as in hot baths.
 alteration and sulphide mineralisation previously defined about 1km north of Musketeer South.

PEAK HILL PROJECT

THREE RIVERS Three Rivers, Que., Canada: see Trois Rivières.  JV (Barrick Gold Barrick Gold Corporation TSX: ABX NYSE: ABX is the largest pure gold mining company in the world, with its headquarters in Toronto, Ontario, Canada; and four regional business units (RBU's) located in Australia, Africa, North America and South America.  Corporation earning 60%)

Barrick Gold Corporation undertook soil and rock chip sampling and regolith reg·o·lith  
n.
The layer of loose rock resting on bedrock, constituting the surface of most land. Also called mantle rock.



[Greek rh
 mapping and commenced a geophysical interpretation of the entire project area. Based on this work, and on a geochemical data review, infill soil surveys are planned to better define several soil gold anomalies.

OTHER PROJECTS

TROJAN JV (Troy earning 60%)

Ground EM surveys designed to test for conductive conductive

having the quality of readily conducting electric current.


conductive flooring
flooring or floor covering made specially conductive to electrical current, usually by the inclusion of copper wiring that is earthed
 nickel sulphides at two areas of elevated nickel and copper values intersected in previous RAB drilling at the Woongaring Project are scheduled for August.

A scout RAB drill programme was completed at the Scorpion scorpion, any arachnid of the order Scorpionida with a hollow poisonous stinger at the tip of the tail. Scorpions vary from about 1/2 in. to about 6 in. (1–15 cm) long; most are from 1 to 3 in. (2.5–7.6 cm) long.  Well Project, located 10km south-east of the Darlot and Centenary gold mines, to test for possible extensions of the prospective greenstone green·stone  
n.
Any of various altered basic igneous rocks colored green by chlorite, hornblende, or epidote.


greenstone
Noun

NZ a type of green jade used for Maori carvings and ornaments

 sequence that hosts these two gold mines. Results are pending.

BLACKMAN JV (Mt Magnet Gold 75%, Troy Syndicate 25%)

Assay results from a programme of 58 aircore drillholes covering six structural targets as reported in the March Quarterly Report were received. No significant gold mineralisation was intersected, however, anomalous a·nom·a·lous  
adj.
1. Deviating from the normal or common order, form, or rule.

2. Equivocal, as in classification or nature.
 base metals was reported in two drill holes that intersected a fine-grained, sulphidic dolerite dol·er·ite  
n. Chiefly British
A dark, fine-grained igneous rock; diabase.



[French dolérite, from Greek doleros, deceitful (from its easily being mistaken for diorite)
 unit. Further work to determine the significance of the anomalous base metals is planned.

MONGOLIA (Troy 100%)

Tsagaan Chuluut Gold Project

Assay results from RC drilling programmes at the TC1, Altan Chuluut and Zesiin prospects within the Tsagaan Chuluut gold project were received. The better gold intersections occur at TC1 where broad zones of low-grade gold mineralisation (138m @ 0.38g/t Au and 198m @ 0.44g/t Au) are hosted by strongly silica silica or silicon dioxide, chemical compound, SiO2. It is insoluble in water, slightly soluble in alkalies, and soluble in dilute hydrofluoric acid. Pure silica is colorless to white.  and biotite-altered dioritic di·o·rite  
n.
Any of various dark, granite-textured, crystalline rocks rich in plagioclase and having little quartz.



[French, from Greek diorizein, to distinguish : dia-,
 rocks. Higher grade intervals, which include 3m @ 3.1g/t Au, 4m @ 5.1g/t Au and 16m @ 1.8g/t Au, are associated with quartz veining vein·ing  
n.
Distribution or arrangement of veins or veinlike markings.
 (Table 2).

Dornogovi Gold, Coal and Uranium Project

Troy Mongolia Alt Resources ("TMAR TMAR Tulane Men Against Rape ") has been granted six exploration licences (10,000km2) north-east of Ivanhoe Mining's Oyu Tolgoi gold-copper discovery in the central-eastern Dornogovi region. The licences are considered prospective for gold, coal and uranium mineralisation and are well-positioned with respect to existing infrastructure including the main Beijing-Ulaanbaatar rail line and Choir-Sayanshand high tension electricity power lines.

Based on the occurrence of coal deposits adjacent to the Dornogovi exploration licences, those parts of the project area covered by Permian and Cretaceous sedimentary rocks (Geol.) See Aqueous rocks, under Aqueous.

See also: Sedimentary
 are considered prospective for coal.

Preliminary reconnaissance work by TMAR within the project area has returned anomalous gold, copper, arsenic arsenic (är`sənĭk), a semimetallic chemical element; symbol As; at. no. 33; at. wt. 74.9216; m.p. 817°C; (at 28 atmospheres pressure); sublimation point 613°C;; sp. gr. (stable form) 5.73; valence −3, 0, +3, or +5.  and molybdenum molybdenum (məlĭb`dənəm) [Gr.,=leadlike], metallic chemical element; symbol Mo; at. no. 42; at. wt. 95.94; m.p. about 2,617°C;; b.p. about 4,612°C;; sp. gr. 10.22 at 20°C;; valence +2, +3, +4, +5, or +6.  results from rock chip sampling along major regional structures. Extensive quartz veining and hydrothermal alteration has also been located along major fault structures and detailed sampling and mapping has commenced.

In the eastern part of the project area, ten documented uranium anomalies (based on Mongolian government data) were field checked. One anomaly Abnormality or deviation. Pronounced "uh-nom-uh-lee," it is a favorite word among computer people when complex systems produce output that is inexplicable. See software conflict and anomaly detection.  at Ikh Ovoo is associated with milled and brecciated brec·ci·ate  
tr.v. brec·ci·at·ed, brec·ci·at·ing, brec·ci·ates
To form (rock) into breccia.



brec
  rhyolitic volcanics and TMAR considers there is strong potential for other uranium occurrences within the Jurassic-Cretaceous felsic fel·sic  
adj.
Containing a group of light-colored silicate minerals that occur in igneous rocks.



[fel(dspar) + s(ilica) + -ic.
  volcanic rocks rocks which have been produced from the discharges of volcanic matter, as the various kinds of basalt, trachyte, scoria, obsidian, etc., whether compact, scoriaceous, or vitreous.

See also: Volcanic
 in this area.

FINANCE REPORT

As at 30 June 2005, Troy within Australia held $22.90 million in cash, plus equity investments with a market value of $4.03 million and 240 ounces of gold awaiting sale. This equates to approximately $27.07 million of liquid assets. Troy's wholly owned Brazilian subsidiaries held cash deposits of A$1.55 million.

At quarter end, Sertao Mineracao Ltda ("SML") (Troy's 70% Brazilian subsidiary) had the equivalent of A$6.64 million in cash. In addition, SML held 3,052 ounces of gold inventory, which approximates to A$1.73 million of revenue based on a gold price of A$567 per ounce.

The Troy group equity share of cash and liquid assets is approximately A$34.48 million as at 30 June 2005.

Gold sales from the Sandstone operation for the quarter were 4,629 ounces at an average price of A$573 per ounce. The average Cash Cost was A$454 per ounce, which gives a Cash Margin of A$119 per ounce.

During the quarter, SML sold 15,598 ounces of gold at an average price of US$426 per ounce. The average Cash Cost was US$107 per ounce, which gives a Cash Margin of US$319 per ounce.

The Company is unhedged in respect to both gold and currency.

Exploration and development expenditure during the quarter was A$1,022,000 plus A$600,000 of exploration undertaken by SML in Brazil. Capital and development expenditure in Australia during the quarter was A$2,880,000, excluding the $1,332,000 purchase cost of the Sandstone royalty interests.

J L C Jones, Executive Chairman

29 July 2005

APPENDIX 1

Geological information in this Report has been compiled by Troy's Regional Manager, Exploration for Western Australia Western Australia, state (1991 pop. 1,409,965), 975,920 sq mi (2,527,633 sq km), Australia, comprising the entire western part of the continent. It is bounded on the N, W, and S by the Indian Ocean. Perth is the capital. , Len Skotsch, who:

- is a full-time employee of Troy Resources NL;

- has sufficient experience which is relevant to the type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources Noun 1. mineral resources - natural resources in the form of minerals
natural resource, natural resources - resources (actual and potential) supplied by nature
 and Ore Reserves';

- is a Member of The Australasian Institute of Mining and Metallurgy metallurgy (mĕt`əlûr'jē), science and technology of metals and their alloys. Modern metallurgical research is concerned with the preparation of radioactive metals, with obtaining metals economically from low-grade ores, with ;

- has consented to the inclusion of this data.

KEY RESERVE ASSUMPTIONS

Lord Nelson and Lord Henry

The Lords Henry and Nelson reserves are based upon the following key assumptions:

- Indicated Resources generated by Snowden and released by Troy to the Australian Stock Exchange on 31 January 2005;

- Lord Nelson cut-off grade (1.06g/t Au); Lord Henry cut-off grade (1.27g/t Au);

- Reserves generated using Whittle pit optimisation and Surpac mining software for design;

- Gold price of A$550/oz as at May 2005;

- Pit optimisation work completed by Snowden from October 2004 to May 2005;

- Pit design completed by Snowden in consultation with Troy;

- Undiluted gold cut-off grades applied as specified above derived from current mining and processing costs, recovery, gold price and state royalty of 2.5% recovered value. An additional royalty payable to other parties at the rate of $15 per ounce of gold for the first 50,000 ounces and $10 per ounce thereafter was excluded from the cut-off grade calculation but included as a capital consideration;

- Base mining cost at surface of A$3.96/t rock mined for Lord Nelson and A$4.37/t rock mined for Lord Henry, incremented with depth;

- Process cost of A$15.89/t ore processed at Lord Nelson and A$19.01/t for Lord Henry;

- Process recovery of 93% assuming conventional CIL (Common Intermediate Language) The ECMA version of the Microsoft Intermediate Language (MSIL). See CLI.

1. (project) CIL - Component Integration Laboratories.
2. (language) CIL - Common Intermediate Language.
 process route;

- Mining dilution of 7% at 0.57g/t Au grade for Lord Henry and 7% dilution at 0.10g/t Au grade for Lord Nelson. Dilution grades were based upon determination of halo grades of material surrounding the mineralisation reporting above the undiluted cut-off grade; and

- Mining recovery of 95%.

Sertao

Sertao Stage 5 reserves are based upon the following key assumptions:

- Indicated Resources declared by Snowden as at June 2005 and released in July 2005;

- Reserves generated using Whittle pit optimisation and Surpac mining software for design;

- Gold price of US$425/oz representing the prevailing spot price as at June 2005;

- Pit optimisation work using Whittle software conducted by Snowden between April and July 2005;

- Pit design completed by Snowden in consultation with Troy Resources NL;

- Undiluted gold cut-off grades applied as specified above derived from current mining and processing costs, recovery, gold price and nil government royalty applying;

- Base mining cost at surface of US$1.83/t waste rock blasted assuming an average density of 2.5t/m3, and US$0.38/t fill. Some fill material contained within a dump at the west end of the deposit originating from the mining of the Stage 4 pit required relocation. Given the shallow nature of the deposit and total contract pricing arrangements negotiated for existing mining at Sertao, mining costs have not been varied as a function of pit depth;

- Process cost of US$22.40/t ore processed. This is inclusive of inclusive of
prep.
Taking into consideration or account; including.
 US$0.47/t for grade control sampling, a differential ore mining cost (over and above waste mining cost) of US$2.77/t, a treatment charge of US$14.40/t and an administration charge of US$4.77/t;

- Process recovery of 98% based upon a recent ore parcel performance;

- Mining dilution of 25.8% at nil Au grade based on Snowden's evaluation of reconciliation data pertaining per·tain  
intr.v. per·tained, per·tain·ing, per·tains
1. To have reference; relate: evidence that pertains to the accident.

2.
 to mining of the Sertao deposit between August 2003 and end February 2004; and

- Mining recovery of 105.4% of the diluted di·lute  
tr.v. di·lut·ed, di·lut·ing, di·lutes
1. To make thinner or less concentrated by adding a liquid such as water.

2. To lessen the force, strength, purity, or brilliance of, especially by admixture.
 resource, based upon the reconciliation evaluation.

Snowden's Audit and Review Statement

The Ore Reserve estimate has undergone internal peer review by Snowden and Troy prior to release. It is acknowledged that Troy endorses the metallurgy, metal pricing, revenue factors, costs, geotechnical parameters, design parameters, infrastructure and capital portions. Snowden has been responsible for optimisation, design and reporting of the Ore Reserve estimate based upon a resource model also developed and reported by Snowden Resource Division.

The information in this report that relates to Ore Reserves is based on information compiled by Allan Blair Allan Walker Blair (1900 – 1947) was a professor at the University of Alabama's medical school who is best known for allowing himself to be bitten by a black widow spider in order to investigate the toxicity of its venom in humans. , a professional mining engineer and member of the Australasian Institute of Mining and Metallurgy. Allan Blair is a full-time employee of Snowden which has undertaken pit optimisation and design work based upon cost and parameters supplied by Troy and a resource model developed by Snowden. Allan Blair holds sufficient experience in mining and Ore Reserve estimation that is relevant to the style of mineralisation, type of deposit and mining methods under consideration. Allan Blair undertakes to qualify as a Competent Person as defined in the 2004 "Australasian Code for Reporting of Mineral Resources and Ore Reserves".

Antena

Snowden confirms that the total Indicated and Inferred Resources for the Antena deposits tabulated within this report accurately represent the combination of the individual resources (Antena West, Antena View, Antena, Antena Sul and Xupe) estimated by Stephanie Gotley and reviewed by Shaun Hackett and Jacqui Coombes Coombes is a hamlet and civil parish in the Adur District of West Sussex, England. It is located three miles (5km) north of Shoreham by Sea on the River Adur. The 11th century village church has frescoes, some of the most important in England, and painted about 1100 A.D. . Shaun Hackett is a full-time employee of Snowden and is a Member of the Australian Institute of Mining and Metallurgy. Mr Hackett has sufficient experience which is relevant to the style of mineralisation and type of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the "Australasian Code for Reporting of Mineral Resources and Ore Reserves".

This Quarterly Report is available on Troy's Web site: www.try.com.au
---------------------------------------------------------------------
                                Table 1
                       Goias Velho Project, Brazil
                Significant Regional RAB Intersections
---------------------------------------------------------------------
Hole ID    UTM      UTM      Dip/     Depth  From  To  Length  Grade
           East    North    Azimuth    (m)    (m)  (m)  (m)   g/t Au
---------------------------------------------------------------------
Capoeirinha West Prospect
---------------------------------------------------------------------
GVR387   549917  8297999    vertical   25m     5    7    2     3.72
                                               9   10    1     9.68
---------------------------------------------------------------------
Santa Rita Prospect
---------------------------------------------------------------------
GVR381   550080  8300220    vertical   35m    12   20    8     4.24
---------------------------------------------------------------------
Cachoeira Prospect
---------------------------------------------------------------------
GVR352   570120  8284741    vertical   37m     2    5    3     2.29
---------------------------------------------------------------------
Intersections based on 1.0g/t Au cut-off and maximum 1m internal
 waste
Assay Method: Calcination + DIBK Aqua Regia Digest and AAS finish
---------------------------------------------------------------------



---------------------------------------------------------------------
                                Table 2
                        TC1 Prospect, Mongolia
                       Selected RC Intersections
 ---------------------------------------------------------------------
Hole ID  GK Zone   GK Zone   Dip/     Depth  From  To  Length  Grade
           19        19     Azimuth    (m)    (m)  (m)  (m)   g/t Au
          East      North
---------------------------------------------------------------------
TCRC02   19675385  5487569  -55/180   126      0  124   124    0.41
                                      Incl.    6    9     3    3.10
---------------------------------------------------------------------
TCRC06   19675388  5487540  -55/180   198      0  198   198    0.44
                                      Incl.  116  120     4    5.10
---------------------------------------------------------------------
TCRC07   19675383  5487502  -55/180   138      0  138   138    0.38
                                      Incl.  116  132    16    1.80
---------------------------------------------------------------------
Assay method:
50g fire assay, extraction, AAS finish

---------------------------------------------------------------------



NOTE: To view "Figure 1, Sertao Stage 5", please click the following link: http://www2.ccnmatthews.com/database/fax/2000/trymap.pdf

Troy Resources NL (ASX.:TRY) (FRANKFURT:TRW)
COPYRIGHT 2005 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2005, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Date:Aug 1, 2005
Words:3983
Previous Article:Intel Drives Growth Through Localized Computing Solutions; Reinforcing Commitment to Worldwide Channel.
Next Article:Voxeo Introduces VoiceCenter 6; New Upgrade Includes Comprehensive MRCP Proxy Server, CCXML 1.0 SIP Proxy Server, Certified VoiceXML 2.0 with 2.1...



Related Articles
MAJOR TRADE AND PROFESSIONAL PUBLICATION, ONLINE AND RELATED PROPERTY ACQUISITION, 1999.
Newsletter cash registers are ringing.
MAJOR TRADE AND PROFESSIONAL PUBLICATION, ONLINE AND RELATED PROPERTY ACQUISITIONS, FIRST QUARTER, 2001.(Brief Article)(Illustration)(Statistical...
SELECTED TRADE AND PROFESSIONAL PUBLICATION AND ONLINE SERVICES, START-UP OR ANNOUNCED, FIRST QUARTER, 2001.
Selected Trade and Professional Publication and Online Services, Start-Up or Announced, Third Quarter 2001.
ONE MAN'S PITCH FOR THE PERFECT GAME.(Sports)
Selected trade and professional publication and online services start-up or announced, third quarter 2002.
Newsletter acquisition pace slightly ahead of last year's first quarter.(Management)
Major trade and professional publication, online and related business information acquisitions, fourth quarter 2005.
Major trade and professional publication, online and related business information acquisitions, third quarter 2006 (by buyer).(Table)

Terms of use | Copyright © 2009 Farlex, Inc. | Feedback | For webmasters | Submit articles