The word from CMS.CMS (1) See content management system and color management system. (2) (Conversational Monitor System) Software that provides interactive communications for IBM's VM operating system. discussed the following in its August 29 Long-Term Care/Skilled Nursing Facility Open Door Forum. * The UB-04 billing form will replace the UB-92 in 2007. The transition period, in which facilities may use either form, is from March 1, 2007-May 22, 2007. Beginning May 23, 2007, the UB-92 form will no longer be valid. * Surveyors for the second Data Assessment and Verification project, or DAVE A file sharing program from Thursby Software Systems, Inc., Arlington, TX (www.thursby.com) that allows a Macintosh to share files with a PC. Designed specifically for and needing installation only on the Mac, DAVE works with Microsoft's native SMB/CIFS file sharing protocols and uses 2, reported that about 96% of the Minimum Data Set (MDS MDS, n See temporomandibular pain-dysfunction syndrome. MDS 1 Maternal deprivation syndrome, see there 2 Myelodysplastic syndrome, see there ) forms at facilities agree with their calculations. There are still significant discrepancies; Section G remains a trouble spot, and staff are sometimes skipping skip v. skipped, skip·ping, skips v.intr. 1. a. To move by hopping on one foot and then the other. b. To leap lightly about. 2. MDS sections entirely, the surveyors found. * The agency hopes the MDS Version 3.0 will be unveiled by the end of 2007. May 23 UB-92 form no longer valid * Although the new unnecessary drugs F-Tags were planned for release at the end of 2006, CMS mentioned a spring 2007 release date is more likely. The next CMS Open Door Forum is scheduled for Oct. 12 at 2 p.m. EST P.M. also p.m. or p.m. abbr. post meridiem Usage Note: By definition, 12 a.m. . Log on to www.cms.hhs.gov/OpenDoorForum for information on signing up. |
|
||||||||||||||

Printer friendly
Cite/link
Email
Feedback
Reader Opinion