Since the introduction of the global positioning system (GPS) and its integration with inertial navigation systems (INS), many of today's Field Artillery weapons and target acquisition (TA) platforms can quickly and accurately perform self-location and orientation without relying on external survey support. Fielding of systems, such as the gun laying and positioning system (GLPS), modular azimuth positioning system/hybrid (MAPS/H) and the position navigation unit (PNU), have dramatically reduced the number of survey personnel and equipment assets in the Army's FA. US Marine Corps artillery units seemingly will follow suit.

This transformation has redefined the role survey personnel play on the modem battlefield. The primary function of the survey section for many years had been to provide common grid. Under normal operating conditions, platforms with self-location systems no longer require a surveyed firing position to emplace, but they still must maintain a common grid with each other to mass fires and achieve the desired effects on target.

The fire support community must be careful not to dismiss the need to maintain common grid based on platforms' self-location capabilities. With the introduction of digital maps and other digital products into our automated command, control and communication systems, it is imperative that warfighters understand common grid to employ FA and TA systems globally. Without common grid, units can't achieve the desired effects without wasting ammunition and manpower or inflicting damage to the wrong target.

This article discusses common grid and common survey and their targeting issues and provides references and recommendations to ensure accurate, massed fires--time-on-target.

Why is common grid required? Common Grid is required to permit the massing of fires, delivery of surprise observed fires, delivery of effective unobserved fires, and transmission of target data from one unit to another in order to aggressively neutralize or destroy enemy targets. (Quoted from the "Field Artillery Position and Navigation Plan" written by the Field Artillery School, Fort Sill, Oklahoma, Page 1. It is online at http://sill-www.army.mil/famag in the "Go-to-War Primer.")

Common grid is the foundation upon which the success of the artillery is built. However, until Operation Desert Storm, most fire supporters never concerned themselves with common grid. During ground combat operations in Desert Storm, rounds missed some targets by up to 750 meters. The culprit was the lack of common grid, specifically due to multiple datums, ellipsoids and grid zones referenced by the maps our joint forces were using.

In once instance in Desert Storm, an aerial observer located an enemy unit and transmitted a request for fire to the supported artillery headquarters for processing. The target coordinate was transmitted to a Navy ship positioned off the coast for prosecution. The ship fired two salvos (rounds) only to have the aerial observer report that the rounds missed the target by 527 meters. Why? They missed because the aerial observer and the artillery headquarters were operating on one datum (Nahrwan Datum) while the ship was operating on another datum (WGS84 Datum). This is known as a "datum shift."

As the result of many similar incidents, the Target Acquisition Department of the Field Artillery School investigated the datum-to-datum capabilities in Field Artillery systems in 1991. Those findings determined that our datum-to-datum capabilities were inadequate, that Field Artillerymen did not understand the subject, that the FA had no standard position navigation (POS/NAV) system requirements and that datums needed to be included as part of any position coordinate description.

Today, many of these same common grid issues continue. To gain an appreciation for common grid, Field Artillerymen must first review the five requirements for accurate predicted fire. (See Figure 1.) These five requirements are equally important; however, three of the five must be referenced to a common grid to be of value: accurate target location, accurate weapon location and accurate meteorological data.

Common grid allows synchronization of geographic information between all sensors, scouts and forward observers (FOs); weapons locating radars; meteorological measuring systems; delivery systems; and automated command, control and communication systems to mass fires. As our weapons achieve greater ranges, inaccuracies caused by not having a common grid become greater.

What is common grid? Common grid is the sum of several components: the geodetic system, coordinate/grid system, map projection and common or relative survey.

Geodetic System. Within the geodetic system are the datum and ellipsoid. A datum is a mathematical model for the surface of the earth used in mapping a region. There are horizontal datums and vertical datums. All maps do not reference the same datum or ellipsoid (to which the datum is referenced); in fact, there are still more than 1,000 different datums in use around the world today. No single operating system is programmed to operate in all datums; however, some allow the user to define datum entries.

A datum can be local or global. A local datum covers only certain geographic regions. The North American Datum of 1927 (NAD27) is an example of a local datum and is still used in the United States, Canada and Mexico.

Global datums provide worldwide use. Examples include the World Geodetic System of 1972 (WGS72) and the newest, World Geodetic System of 1984 (WGS84).

The National Imagery and Mapping Agency (NIMA), Fort Belvoir, Virginia, considers the WGS84 the preferred datum, which is the datum most of us are familiar with today. NIMA predicts it will take up to 10 years to completely reference the world to the WGS84 Datum, but NIMA will only produce new topographic land maps (TLM) in the 1:100,000 scale.

Many of the existing 1:50,000 scale TLMs could remain referenced to one of several local datums still in use around the world. In some parts of the world, the accuracy error caused by using two different datums can be as much as 750 meters.

When combining the use of TLMs, digital maps or self-location systems, it is critical we know what datum we are operating on. Vertical datums are used as references for elevation; the most common is mean sea level (MSL).

The ellipsoid is basically a mathematical model for the size of the earth and is described as an oblate sphere: a sphere that is flattened at the poles. The ellipsoid was once called a "spheroid," and the term is still found on some of the older maps. There are more than five ellipsoids used around the world with WGS 84, again, being preferred.

The introduction of GPS technology in the late 1980s made WGS84 the preferred datum because GPS receivers compute all positions on WGS84 latitude and longitude and then convert them to display what datum and coordinate system the user needs.

Coordinate/Grid System. Another component of common grid is the coordinate/grid system. US forces use different coordinate systems. The Army and Marine Corps use the Universal Transverse Mercator (UTM) Grid and Military Grid Reference System (MGRS), while the US Navy uses latitude and longitude expressed in degrees, minutes and seconds. The Air Force uses latitude and longitude expressed in degrees and decimal degrees.

Imagine having an Air Force pilot checking in on station and requesting Army coordinates in latitude and longitude. Too many Field Artillerymen can't plot latitude and longitude on their maps or don't know enough about their handheld GPS receivers to convert coordinates into latitude and longitude. Today's joint operational environments require the warfighter be familiar with all these coordinate systems and know how to convert between the different formats. (See Figure 2.)

Map Projection. A map projection portrays all or part of the round earth on a flat surface. This cannot be done without some distortion; therefore, many different projections are used to produce maps. The most common projection is the Transverse Mercator Projection, the standard for NIMA-produced maps.

Many countries use other map projections unfamiliar to our forces that would necessitate their conversion. Fortunately, datum, ellipsoid, grid system and map projection information is found in the margins of all NIMA-produced TLMs. Digital maps and other digital products reference the WGS84 datum/ellipsoid and can be displayed in MGRS, UTM or Geographic grid coordinates using the joint mapping tool kit (JMTK) built into systems, such as the advanced Field Artillery tactical data system (AFATDS). Figure 3 gives the website for the NIMA geodetic translatot (GEOTRANS) free software to convert datums, ellipsoids, coordinates/grids and map projections.

Common Survey. Common survey is the final component of common grid and is primarily provided by our artillery survey sections using the position and azimuth determining system (PADS), conventional means or, in the case of the Marine Corps, differential GPS equipment.

Common survey serves two purposes. First, it provides the basic requirement of accurate weapon location in the form of survey control points (SCPs), orienting stations (OS) and known directions, commonly called the end-of-orienting line (EOL). Second, common survey facilitates common grid requirements by ensuring all fire support and targeting assets are oriented the same with respect to azimuth, position and elevation to a prescribed accuracy.

This function has been the mainstay of our survey sections for more than 15 years. In order for two locations to be considered on common survey, they must be referenced to the same datum, ellipsoid and grid system and must meet the prescribed survey accuracies or be converted to meet them.

The highest echelon survey element is responsible for ensuring subordinate units operate on a common grid and common survey network. Subordinate survey elements must establish their survey networks without waiting for higher survey echelon coordination. These elements convert to common survey by comparing higher and lower survey data and converting the lower echelon data to the higher echelon data. Figure 4 outlines the criteria and reference for converting survey data to ensure common survey.

Does GPS provide common survey?

GPS and its integration with the inertial navigation system have reduced the need for survey sections to provide primary location and orientation data but have not replaced the need to validate common survey.

Understanding GPS is critical if we are to use it to meet common survey requirements. OPS is a space-based radio navigation system designed to provide continuous accurate position, navigation, velocity and time (PNVT) coverage worldwide to an unlimited number of users in both the civilian and military sectors.

When loaded with crypto keys, the precision lightweight GPS receiver (PLGR) provides acceptable horizontal and vertical position accuracy for cannons, rocket launchers and radar systems but not the azimuth accuracies required for any FA platform. The PLGR, or any currently fielded GPS receiver, provides a 10-meter circular error probable (CEP) with a 50 percent confidence rate, but it cannot establish fourth or fifth order SCPs or be used for precise targeting. Unless otherwise stated, a 10-meter CEP is defined as the 50 percent probability that a calculated position of a point is within a circle containing a radius of 10 meters from the true position (see Figure 5).

NATO Standardization Agreement (STANAG) 2934 specifies user requirements for position and navigation (POSNAV) accuracies. Figure 6 shows a condensed version of these requirements. As shown in the figure, horizontal position is expressed in terms of CEP in meters, vertical position in probable error (PE) in meters and direction (azimuth) in PE in mils.

Position/direction accuracies and munitions effectiveness are considered parts of the "error budget" for indirect fire weapons and TA systems. An error budget encompasses all errors that contribute to the total system accuracy or probable error of the rounds under nonstandard conditions, such as errors incurred by inaccuracies in weapons location, target location, Met data, etc.

Because GPS provides a 10-meter CEP with 50 percent confidence and STANAG 2934 allows for a higher CEP with the same 50 percent confidence rate on many systems, too many Field Artillerymen think the GPS exceeds the standard and they can skip the verification step. That is incorrect--50 percent confidence is not enough to mass fires effectively.

When properly employed, GPS can provide the accuracies to meet common survey requirements, but the user must validate it with an independent means as soon as possible. Sergeant First Class Joseph G. Jacobs, a Fire Support Observer/Controller at the Joint Readiness Training Center (JRTC), Fort Polk, Louisiana, wrote the article "Field Artillery Survey Sections in the New Millennium: New Equipment--Old Requirements" published in the "Combat Training Center (CTC) Quarterly Bulletin" in the First Quarter of FY01 (No. 01-16, July 01) that discusses the use of the GPS and GLPS. He states, "All too often at the JRTC, that crucial second check is not taking place." In other words, commanders often are assuming incorrectly that all positional data produced by GPS-aided systems are correct and accurate.

In combat operations, an independent verification of position and (or) azimuth may not be practical, but in built-up areas where the effects of our fires must be closely maintained, it may be critical. The most important reason to validate any GPS-aided system is due to GPS' vulnerabilities.

What are GPS' vulnerabilities? GPS signals are vulnerable to jamming, spoofing and masking interference. Jamming is the interruption of the GPS signals, and spoofing is GPS signals that have been deliberately duplicated with the intent to fool GPS receivers into using the manipulated data. Masking occurs in built-up areas or in heavy tree cover. Satellites also may be affected by either solar flares or meteors that can cause OPS errors or interrupt GPS signals.

Jamming may be produced by hostile means or accidentally by friendly forces or introduced intentionally in the form of selective availability to prevent adversaries from using our GPS service.

There are valid reasons to be concerned. GPS jammers are easy to build or acquire and would be relatively easy to employ against our forces.

The recent introduction of the selective availability anti-spoofing module (SAASM) will make GPS less vulnerable to hostile jamming and spoofing but will not make GPS foolproof. Modernization plans call for a more robust and less vulnerable GPS service, but the system is not projected for fielding for at least a decade.

GPS vulnerabilities result in many unfavorable possibilities to the user: delays in service, positional errors or complete loss of signals.

What if GPS becomes unavailable? If GPS becomes unavailable, all self-location system platforms can continue to meet mission requirements by using SCP or update point data. SCPs and update points are established by survey teams to provide horizontal and vertical reference. In the event of GPS signal loss, the platforms can continue to use their internal INS along with SCP or update point data to fulfill common survey requirements. These points also provide a means to validate self-location system accuracy and conduct a second independent verification of the positioning data.

Establishing these SCP/update points is the primary task of today's survey teams. The article "Artillery Surveyors: Nomads of the Battlefield" by Chief Warrant Officer Three W. Mark Barnes (January-February 2001) provides additional information regarding GPS vulnerabilities and the criticality of units' training to operate without GPS.

How do units avoid common grid and common survey issues? Training to compensate for our vulnerabilities should be part of every exercise--to include operating without GPS. Most leaders would concur that their units lack skills in basic map reading, use of compasses and terrain association. The PLGR was designed as a navigational aid, yet units commonly train with the PLGR and no map.

Gaining a basic understanding of common grid, common survey and GPS vulnerabilities is the first step in preventing common grid issues. Military planners must account for common grid during the intelligence preparation of the battlefield (IPB) to avoid disrupting the targeting process. To avoid problems with common grid, planners at all levels should ask the questions in Figure 7, and units should use the references in Figure 8.

Conclusion. Despite the enhancements of systems using digital maps and GPS technology, the requirements of common grid remain as valid today as ever. The probability that our forces will operate in areas where the components of common grid will differ between maps and weapons, TA and command and control systems remains high.

Somewhere out on the horizon, technology will bring a more accurate and reliable GPS service to merge with systems operating in a globally unified datum, ellipsoid, grid/coordinate and projection system, thus eliminating the need to understand the attributes ofcommon grid or common survey. But until that time, Field Artillerymen must understand the fundamentals of common grid to plan for vulnerabilities and limitations and ensure nothing prevents the delivery of accurate, responsive fires-- time-on-target.

Figure 1: Five Requirements for Accurate Predicted Fire

1. Accurate Target Location and Size

2. Accurate Weapon Location

3. Accurate Computational Methods to Solve the Gunnery Solution

4. Accurate Meteorological Data

5. Accurate Weapon and Ammunition Data

Figure 2: AN/PSN-11 Precision Lightweight GPS Receiver (PLGR) Procedures for Converting One Coordinate/Grid System Format to Another. Conversion must take into account the map projection of a particular area of operations.

1. In the PLGR, store the coordinate as a "Waypoint."

2. Use the "Set-up" menu to view the coordinate in the format needed

3. Refer to the PLGR operations and maintenance technical manual, TM 11-5825-291-13, Pages 3-66 through 3-73, for further instructions.

GEOTRANS is the Department of Defense conversion software available at NIMA's web site: http://164.214.2.59:80/GandG/geotrans/geotrans.html. The software includes an easy-to-use Users Guide.

Figure 3: National Imagery and Mapping Agency (NIMA) Geodetic Translator (GEOTRANS) Software. This free software converts datums, ellipsoids, coordinates/grids and map projections easily on a personal or laptop computer.

Survey data must be converted to higher echelon data when the two differ by two mils or more in azimuth, 10 meters or more in radial error or two meters or more in elevation. Procedures for converting to the higher echelon data are in FM 6-2, Tactics, Techniques and Procedures for Field Artillery Survey, Pages 14-2 through 14-4, or for Marine users, MCWP 3-16.7, Marine Artillery Survey Operations, Pages 1-13 through 1-18.

Figure 4: Criteria and References for Converting to Common Survey Data

1. What are the operational datums and ellipsoids used in the region? There will be many different datums and ellipsoids used during joint operations. Depending' on the scale, paper maps may be referenced to one datum and digital maps of the same area may be referenced to a different datum.

2. Have the standard operational datum and ellipsoid been established? The highest echelon survey element should recommend which datum and ellipsoid to use and provide the differences between coordinates that users of topographic land maps (TLMs) should apply to their maps when reporting coordinates. Users must pay attention to the operational datum in use.

3. What are the system capabilities in regards to common grid--is there a workaround established, as necessary, and disseminated to the force? No single system or platform is programmed for all datums, ellipsoids, grids or projection systems.

4. Do we have a backup for the global positioning system (GPS)? GPS has vulnerabilities that may not be apparent to the user until it's too late. Users always should use crypto keys. Users also should validate data, whenever possible--at a minimum with a map spot.

5. Has the signal and communications plan integrated GPS signal frequencies to prevent unintentional jamming by friendly farces?

6. Does the survey plan employ its assets proactively enough to establish common survey requirements and backup capabilities?

7.Have we identified where and who can transform coordinates, if needed?

Figure 7: Questions for Planners to Ask to Prevent Common Grid Issues
Figure 6

FA Position/Navigational (POS/NAV) Operational Requirements from NATO
Standardization Agreement (STANAG) 2934 (A Artillery P-1, "Artillery
Procedures," Chapter 11, Annex A, Tabels 1-7)

 Horizontal Vertical Direction
 Position (Meters) Position (Meters) (Mils)
System CEP (50%) PE (50%) PE (50%)

105 Towed Howitzer 17.5 10 0.4
155 Towed Howitzer 17.5 10 0.4
155 Self Propelled 17.5 10 0.4
Howitzer
MLRS 8 3.6 1
BFIST/Striker 30 20 2
Q-36 Radar 10 10 0.4
Q-37/Q-47 Radar 10 10 0.4
Q-25A/Q-58 Radar 43.7 10 3
MMS 114 10 9

Legend:

BFIST = Bradle Fire Support Team Vehicle

CEP = Circular Error Probable

MLRS = Multiple-Launch Rocket System

MMS = Meteorological Measuring Set

PE = Probable Error

Figure 8

Useful References for Training on and Solving Problems with Common Grid

Resource Application

TM 11-5825-291-13 AN/PSN-11 Covers and supports all
Precision Lightweight Global software and hardware
Positioning System Receiver versions of the PLGR.
(PLGR)

PLGR White Paper Address the use of PLGR
Dated 4 December 2000 in Field Artillery. Paper
 is online at http://sill-
 www.army.mil/gunnery/
 Courselnfo/courses_
 download_page.htm#
 infodoc.

FM 6-2 TTP for Field Artillery Manuals that cover Army
Survey MCWP 3-16.7 Marine and Marine survey
artillery Survey operations
Operations (USMC)

NIMA TR8350.2, Third Edition A National Imagery and
 Mapping Agency (NIMA)
 technical report that
 defines WGS84 and
 provides deltas and
 parameters to convert
 or define local datums
 and ellipsoids. It is
 online at http://mac.
 usgs.gov/mac/nimamaps/
 dodnima.html.

The Field Artillery Master Provides plans for the
Position and Navigation Plan current and objective
 POS/NAV systems
 architecture. It is
 online at sill-www.army.
 mil/famag in the "Go-to-
 War Primer."

NIMA VHS Film "The Danger Excellent 23-minute
Zone" training film that
 provides fundamental
 information on datums,
 ellipsoids, grids and
 the global positioning
 system (GPS). NSN:
 7643-01-476-1509

Geodetic Translator (GEOTRANS) Free software used to
Software perform conversions.
 Runs on Windows-based
 PC or laptop. Available
 online at NIMA via
 http://164.214.2.59:80/
 GandG/geotrans/Geotrans.
 html.

Backup Computer System (BUCS) Uses the datum-to-datum
 cooridnate transformation
 (DDCT) program to perform
 conversions.

Forward Entry Device Use Forward observer
Meteorolotical/Survey software (FOS) to perform
(FED MSR) conversions and other
 survey calculations
Hand-held Terminal Unit (HTU)


Chief Warrant Officer Three Xavier Herrera, US Marine Corps (USMC), has been the Chief of the Survey Branch of the Cannon Division in the Gunnery Department of the Field Artillery School, Fort Sill, Oklahoma, since April 2001. In his previous assignment, he was the Survey Officer for the 5th Battalion, 11th Marines and Radar Officer for the 11th Marines at Camp Pendleton, California; and Mortar Platoon Sergeant for the 2d Battalion, 4th Marines, also at Camp Pendleton. Among other schools, he is a graduate of the Target Acquisition Warrant Officer Advanced Course at the Field Artillery School and the Advanced Geodetic Survey Course at the Defense Mapping College, Fort Belvoir, Virginia.
COPYRIGHT 2003 U.S. Field Artillery Association
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2003, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:FA Journal
Geographic Code:1USA
Date:Jan 1, 2003
Words:3742
Previous Article:Not all PGMs unresponsive to troops in close contact. (Letters to the Editor).
Next Article:Recognition of combat vehicles [ROC-V] training.
Topics:


Related Articles
Artillery Surveyors.
JTRES: Common Reference System for Coordinating and Synchronizing Joint Fires.
Accurate, Responsive Enemy-Focused Fires.
Echeloning Fires: Breaking Bad Training Habits.
Restructuring Gunnery in the Captains Career Course.
Accurate target location and the maneuver shooter: Are we ready to shoot?
Digitizing the Army for the objective force. (Interview).
AVP: increasing laser target location accuracy at max ranges.
The leaders' reconnaissance: company FSO recon of an objective.
101st Div Arty: fighting with artillery fires in an urban environment.

Terms of use | Copyright © 2014 Farlex, Inc. | Feedback | For webmasters