Printer Friendly
The Free Library
5,670,445 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

Tetra Tech Awarded Two Wind Energy Projects Valued at Approximately $28 Million.


PASADENA, Calif. -- Tetra Tech, Inc. (NASDAQ NASDAQ
 in full National Association of Securities Dealers Automated Quotations

U.S. market for over-the-counter securities. Established in 1971 by the National Association of Securities Dealers (NASD), NASDAQ is an automated quotation system that reports on
: TTEK) announced today that it has been awarded two wind energy projects totaling approximately $28 million by PacifiCorp, one of the leading utilities in the western United States Noun 1. western United States - the region of the United States lying to the west of the Mississippi River
West

Santa Fe Trail - a trail that extends from Missouri to New Mexico; an important route for settlers moving west in the 19th century
. Work on the two projects will begin immediately and is expected to be complete in December 2008. Tetra Tech will provide engineering, procurement, and construction (EPC (1) (Entertainment PC) See HTPC.

(2) (Electronic Product Code) A standard code for RFID tags administered by EPCglobal Inc. (www.epcglobalinc.org).
) services for the Seven Mile Hill II and the Glenrock III wind farm projects in Wyoming.

Seven Mile Hill II will include 13 General Electric turbines capable of generating 19.5 megawatts of power and Glenrock III will include 26 General Electric turbines capable of generating 39 megawatts of power.

The Seven Mile Hill wind project is located in Carbon County, Wyoming Carbon County is a county located in the U.S. state of Wyoming. As of 2000, the population is 15,639. Its county seat is Rawlins6. History
Carbon County was organized in 1868.
, between the towns of Hanna and Medicine Bow Medicine Bow can refer to the following things:
  • Medicine Bow, Wyoming, a town in Southeastern Wyoming.
  • Medicine Bow Mountains, a mountain range in Colorado and Wyoming.
  • Medicine Bow Peak, the highest peak of the Medicine Bow Mountains.
. The Glenrock project is located in Converse County, Wyoming Converse County is a county located in the U.S. state of Wyoming. As of 2000, the population is 12,052. Its county seat is Douglas6. History
Converse County was organized in 1888. Geography
According to the U.S.
, on a site that includes the reclaimed Dave Johnston Coal Mine, where surface mining operations took place for more than 40 years. Final reclamation of the mine was completed in November 2005, returning the land to its pre-mining appearance.

About PacifiCorp (www.pacificorp.com)

PacifiCorp is one of the West's leading utilities, serving customers in Utah, Wyoming, and Idaho as Rocky Mountain Power, and in Oregon, Washington, and California as Pacific Power. PacifiCorp has more than 10,400 MW of generation capacity from wind facilities, coal-fueled plants, hydroelectric facilities, natural gas-fueled plants, and geothermal sources. PacifiCorp is a subsidiary of MidAmerican Energy Holdings Company MidAmerican Energy Holdings Company is a holding company controlled by Berkshire Hathaway.

MidAmerican holds the following companies:
  • MidAmerican Energy Company
  • PacifiCorp
  • CE Electric UK
  • CalEnergy Generation
  • Kern River Gas Transmission Company
.

About Tetra Tech (www.tetratech.com)

Tetra Tech is a leading provider of consulting, engineering, and technical services. With approximately 8,500 associates located in the United States and internationally, the Company supports commercial and government clients in the areas of resource management and infrastructure. Tetra Tech's services include research and development, applied science and technology, engineering design, program management, construction management, construction, and operations and maintenance.

Any statements made in this release that are not based on historical fact are forward-looking statements. Any forward-looking statements made in this release represent management's best judgment as to what may occur in the future. However, Tetra Tech's actual outcome and results are not guaranteed and are subject to certain risks, uncertainties and assumptions ("Future Factors"), and may differ materially from what is expressed. For a description of Future Factors that could cause actual results to differ materially from such forward-looking statements, see the discussion under the section "Risk Factors" included in the Company's Form 10-K Form 10-K

A report required by the SEC from exchange-listed companies that provides for annual disclosure of certain financial information.


Form 10-K

See 10-K.
 and 10-Q filings with the Securities and Exchange Commission.
COPYRIGHT 2008 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2008 Gale, Cengage Learning. All rights reserved.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Date:Jul 30, 2008
Words:415
Previous Article:Itron Announces Record Second Quarter Results.
Next Article:Aspen Insurance Holdings Reports Second Quarter and First Half 2008 Results.
Topics:



Related Articles
Delay of Telecom Spinoff Sends Tetra Tech Tumbling.(Brief Article)(Statistical Data Included)
BRIEFCASE RELIANCE STEEL DEAL COMPLETED.(Business)
Sour deal behind it, Tetra Tech gets in position for turnaround.(Albert Smith appointed)(Company Profile)
Wind energy.(Pasadena)
Tetra Tech honored for engineering excellence.(FROM the MARKETPLACE)(Brief article)
Construction contracts.(MANUFACTURING)
Reconstructing Afghanistan.(MANUFACTURING)(Brief article)
Corruption contract.(MANUFACTURING)
Green military: resource efficiency consultant Tetra Tech Inc. has been awarded contracts valued at up to $21.5 million to provide on-site energy...
Paying off: Tetra Tech Inc.(NEWS OF THE WEEK)(Brief article)

Terms of use | Copyright © 2009 Farlex, Inc. | Feedback | For webmasters | Submit articles