Team Osprey redefines training.Improving the way that training development is integrated into the life cycle of a weapons platform is a much needed acquisition reform. Training is, unfortunately, often the first subprogram sub·pro·gram n. A computer program contained within another program that operates semi-independently of the encasing program. Noun 1. to be suggested when program managers look to reduce costs. From an organizational perspective, training managers are rarely at a level of parity with systems engineering and other subprogram offices. The V-22 Osprey The V-22 Osprey is a joint service, multimission, military tiltrotor aircraft with both a vertical takeoff and landing (VTOL) and short takeoff and landing capability (STOL). tilt-rotor aircraft tilt-rotor aircraft: see vertical takeoff and landing aircraft. , whose variants will enter service with the Marine Corps, Navy, and Air Force Special Operations Operations conducted in hostile, denied, or politically sensitive environments to achieve military, diplomatic, informational, and/or economic objectives employing military capabilities for which there is no broad conventional force requirement. community later this decade, is being supported by a transformational program that has elevated training to a level of equity within the organizational structure To comply with Wikipedia's lead section guidelines, one should be written. and made other reforms to increase the effectiveness and visibility of training within the program. From Tragedy to Transformation The V-22 program has faced difficult challenges. In December 2000, just as the program approached the decision to enter full-rate production, one of the test aircraft experienced a fatal and very public accident during a routine training mission. The fleet was grounded and two independent assessments were chartered--the Panel to Review the V-22 Program (DoD Blue Ribbon blue ribbon denotes highest honor. [Western Folklore: Brewer Dictionary, 127] See : Prize Panel) and a NASA Ames Research Center NASA Ames Research Center (ARC) is a NASA facility located at Moffett Federal Airfield, which covers 43 acres at the borders of the cities of Mountain View and Sunnyvale in California. This research center is most commonly called NASA Ames. Review. [ILLUSTRATION OMITTED] Although each assessment recommended, independently, that the program move forward, specific engineering changes and improvements were needed. Indeed, while the Blue Ribbon Panel concluded that pilot training was adequate, it also opined that "historical precedent suggests that funding may not remain stable throughout upcoming budget cycles" and recommended that adequate funding be provided for aircrew ground training, aircraft simulators, and upgrades to training devices. The V-22 program office accepted this and other recommendations, conducted a rigorous analysis in training and other missions, and recast re·cast tr.v. re·cast, re·cast·ing, re·casts 1. To mold again: recast a bell. 2. the way it operates, creating a new program--unique in many ways, including the transformational redesign of the complete Osprey osprey (ŏs`prē), common name for a bird of prey related to the hawk and the New World vulture and found near water in most parts of the world. training system. With strong leadership, tragic events can become the impetus for success. This seems to have been the case for the V-22. A fleet of nine test aircraft logged more than 1,300 flight hours to complete developmental testing and begin the follow-on operational evaluation The test and analysis of a specific end item or system, insofar as practicable under Service operating conditions, in order to determine if quantity production is warranted considering: a. the increase in military effectiveness to be gained; and b. phase in January 2005. The transformation was achieved not through some exotic technology, but through a rigorous application of long-known but sometimes-forgotten training and acquisition principles. Strict adherence to instructional system design has allowed training tasks to be allocated to the classroom, the simulator, and the live-fly aircraft in a way that will save over $1 billion in training aircraft costs. A real partnership between business and government, combined with an open mind to commercial off-the-shelf Commercial off-the-shelf (COTS) is a term for software or hardware, generally technology or computer products, that are ready-made and available for sale, lease, or license to the general public. (COTS (Commercial Off-The-Shelf) Refers to ready-made merchandise that is available for sale. See MOTS. (software) COTS - commercial off-the-shelf. See commercial software. ) products and other technology innovations, has enabled all training products to be delivered on time, on cost, and before the primary system, so the initial crew training is on the training system, not in the factory. Focus on the Warfighter "By making the training system the first priority for program funding, we are doing something that no other major acquisition programs are doing that I am aware of," says retired Marine Corps Lt. Col. Ken Fancher, the former V-22 training systems manager. State-of-the-art glass cockpit A glass cockpit is an aircraft cockpit that features electronic instrument displays. A relatively recent development, glass cockpits are highly sought-after upgrades from traditional cockpits. technology permits the program to make the leap from early 1960 era to latest technology. Higher-fidelity visuals, motion and other flight simulator flight simulator, device providing a controlled environment in which a flight trainee can experience conditions approximating those of actual flight. A simulator generally consists of an enclosure housing a working replica of the interior of the cockpit of an subsystems, and other innovations also help. Osprey accession pilots accomplish more than 50 percent of their training in a ground-based environment. This compares with a 5 percent ground-based training percentage for the venerable CH-46 helicopter. "This is a transformation of Marine Corps aviation," Fancher says. Other transformational aspects are evident throughout the program. In legacy acquisition programs, the warfighter defines training requirements and passes them to the Service acquisition team and the contractor to build trainers and other products. The Osprey team relies on regular warfighter participation throughout the development process to build the training system. "What this means is that at this and every other critical decision point, the warfighter is part of the decision. For every trade-off we discuss, the warfighter weighs in with a perspective," Ward Carroll, V-22 spokesman, says. This focus on warfighter participation allowed the up-front analysis to be completed as envisioned. Early user inputs in the curriculum process included: * Defining every pilot and aircrew training task * Determining the level of proficiency at which each task must be conducted * Specifying how often each task must be trained. It is the V-22's end user who defines success (i.e., effectiveness of a training device) for the training continuum. "In previous acquisition models, all of the groups--the training device managers, classroom instructors and others--defined success separately," Osprey program analyst Robert Cox Robert Cox may refer to several different people or things:
Reducing Training Costs The V-22's training systems approach is expected to yield dividends for Marine Corps aviation. The Osprey team projects that by optimizing simulators to complete up to 75 percent of 100-level training at the Fleet Replacement Squadron (FRS FRS abbr. Fellow of the Royal Society FRS, n “flexed rotated side-bent,” an osteopathic abbreviation used to describe vertebral position in cases of spinal dysfunction. ), the number of MV-22 aircraft marked for training can be reduced from 40 to 20. "This is about $1.2 billion in cost avoidance Cost avoidance is a management accounting term referring to an expense one has avoided incurring. It is commonly used in the field of energy management to describe the energy costs you avoided due to energy management initiatives. from not buying 20 additional training aircraft--not a small sum," Cox points out. Cox reiterates that for any other Corps aviation program to reduce flight hours and realize similar efficiencies, it would need a V-22-like training system that would include not only high-fidelity simulators, but also effective courseware and other components. The program is looking to obtain similar savings through the increased use of simulation at 200- and 300-level FRS training, with plans that include the use of simulators for 50 percent of that training. Other data are also impressive. The program's effort to deliver its training products better, faster, and cheaper enables it, in part, to train a 100-level FRS student for $450,000. Comparable per-student training costs for other programs are CH-53E Sea Stallion Sea Stallion can refer to:
Delivering Increased Effectiveness In addition to cutting training costs, the Osprey team is looking to achieve other measures of effectiveness Tools used to measure results achieved in the overall mission and execution of assigned tasks. Measures of effectiveness are a prerequisite to the performance of combat assessment. Also called MOEs. See also combat assessment; mission. to help shape tomorrow's aviation community. Legacy weapon platform programs have a track record of belatedly be·lat·ed adj. Having been delayed; done or sent too late: a belated birthday card. [be- + lated. incorporating their latest hardware and software system changes into training devices. As a result, changes to tactics, lessons learned, and engineering plans are seldom integrated into training devices in a timely manner. "Training systems lag grossly behind the aircraft--by an average of two years. As a result, you often have training devices that are not relevant," Cox says. The V-22 program is determined to integrate platform changes more efficiently into program devices. "If we are spending $25 million for a simulator, it will become a door stop in a few years if it's not kept current," according to according to prep. 1. As stated or indicated by; on the authority of: according to historians. 2. In keeping with: according to instructions. 3. Deborah Paris, Osprey training concurrency Operations that are performed simultaneously within the computer. For example, dual-core CPUs provide complete overlapping of two independent processes. See dual core, hyperthreading, multiprocessing, multitasking, multithreading, SMP and MPP. concurrency - multitasking manager, whose team monitors platform changes after the training device is delivered. [ILLUSTRATION OMITTED] One acquisition strategy that helps to correct this disconnect disconnect - SCSI reconnect is to optimize COTS technology in training devices. For example, with the exception of the cockpit, 100 percent of the MV-22 full flight mission simulator hardware is COTS. This plan also enabled the program's seventh training device to be delivered under budget and ahead of schedule. Since 2000, Team Osprey has also involved the aircraft configuration management team in the concurrency process. V-22 maintenance and flight training devices are Block A-concurrent--matching the huge change that has been made to the aircraft since the December 2000 pause in the testing program. As a result, aircrews have trained in Block-A-type simulators since June 2003--before the actual aircraft were delivered in November of that year! This outcome was made possible thanks to the of the program's priority to fund training systems. The End-User Connection The training concurrency integrated product team, a V-22 curriculum working group, and other program teams include the users, the acquisition community, and industry team members. The end users are objectively asked whether to incorporate change inputs, including those that originate from aircraft modifications A change in the physical characteristics of aircraft, accomplished either by a change in production specifications or by alteration of items already produced. , the curriculum, the users themselves, and other sources. The program uses its instructional systems design to produce the master task list, which represents "training objectives, all of the tasks, learning objectives, and everything else that has to do with training," Paris says, adding that this part of the process allows the team "to run a change through the master task list and get an objective point of view." The training concurrency integration process evaluates where in the training system a change needs to be inserted, whether in a simulator, a training device, or another component. One envisioned outcome is to help the program to establish all training and associated costs at the front part of the budget planning cycle. Paris summarizes her integrated product team's efforts: "That's what we are doing at this time--going through the policy and procedures to prove the concept of whether we can incorporate all of the program's changes into our training concurrency model." To successfully meet this goal, her team maintains a close working relationship with Marine Corps Training and Education Command, Quantico, Va., and other Service offices. Another projected outcome of the IPT's efforts will be to reduce the time to integrate a change submitted by the user into a training system. Through focused efforts, the V-22 program office wants any change routinely made in 48 hours. "We want to get to the point where, if we wanted to submit a change, we would know how many pages of interactive multimedia instruction are affected," Paris says. And it follows, she adds, that if training devices are concurrent and have commonality com·mon·al·i·ty n. pl. com·mon·al·i·ties 1. a. The possession, along with another or others, of a certain attribute or set of attributes: a political movement's commonality of purpose. with the supported aircraft, the pilots will want to train with those systems. Marine Corps Maj. Vince Martinez, assigned to VMX-22 at Marine Corps Air Station New River Marine Corps Air Station New River (ICAO: KNCA, FAA LID: NCA) is a United States Marine Corps helicopter base near Jacksonville, North Carolina, in the eastern part of the state, at . Its ICAO airport code is KNCA. , N.C., summarizes the fidelity of a V-22 Full-Flight Simulator and the benefits of training in a state-of-the-art environment: "While it is very hard to make any simulator absolutely realistic, with the high fidelity high fidelity n. The electronic reproduction of sound, especially from broadcast or recorded sources, with minimal distortion. high FFSs that we currently have, it is possible to generate tactical scenarios with networked devices that provide very realistic training. If I network a training mission with two devices and two sets of pilots, and the second aircraft is flying off a lead aircraft in virtual space, or if the lead aircrew turns early or misses a checkpoint (programming) checkpoint - Saving the current state of a program and its data, including intermediate results, to disk or other non-volatile storage, so that if interrupted the program could be restarted at the point at which the last checkpoint occurred. on a route, they are forced to react to the mistake the same way they would in the actual aircraft." Martinez continues, "In the simulator we can add night vision goggles goggles, n the protective eyewear worn by dental personnel and patients during dental procedures. goggles see periocular leukotrichia. or forward looking infra-red devices, reduce light levels, or add the weather to obscure the visual cues, and then introduce threat that can 'shoot' them out of the sky. The level of training can become very complex." He adds that the realism is not just a product of the simulator itself, "but rather, it's in the fact that I can tax the pilot's decision cycle and keep him reacting to things external to his aircraft. This is a significant shift from the cockpit procedures trainer mentality that has typically been associated with aircraft simulators." Lessons Learned Fancher says that DoD Directive 5000.1 (The Defense Acquisition System) and DoD Instruction 5000.2 (Operation of the Defense Acquisition System) "give me, as a program manager, a lot more guidance in terms of my responsibility for the entire life cycle of this training system." This is a monumental change in how the Defense Department's training systems have been managed. "In the past, program managers concentrated on putting their hardware on the concrete on cost and on schedule, and then leaving it--they were done and left the follow-on work for the type commander," Fancher reflects. Now the entire life cycle, including keeping the device current with the supported aircraft, is important, he adds. Asked what lessons learned from his V-22 program experience he would provide to a Defense Acquisition University PM course, Fancher replies that teamwork is at the top of his list. "A lot of people in other DoD acquisition programs say that they function as a joint IPT IPT - IP Telephony , but they really don't. Without teamwork, that concept won't succeed," he points out. Fancher also notes, "Things are going to go wrong. The manager doesn't own that information. He or she has to be at peace with that inevitability." Accordingly, PMs need to organize a system that will allow them "to effectively communicate any problems with the warfighters and the acquisition chain of command before the leadership reads about them in the morning paper." In an effort to obtain the best-of-breed practices throughout the military and civilian training community, the Osprey training team maintains an open dialogue with the F-35 Joint Strike Fighter A strike fighter is a fighter aircraft which is also capable of attacking surface targets, including ships. It differs from an attack aircraft in that the aircraft remains a capable fighter. and other weapon platform programs, and visits commercial airline and training system company offices. Addressing the significance of the team's gaining training insights from the commercial airline industry, Carroll observes that despite the breathtaking advances in digital architectures, other technologies, and their applications during the 1980s and 1990s, "naval aviation--and I include Marine Corps aviation--really didn't believe that there was a lot of value in simulators. In order to replicate mission training, you had to be in the airplane airplane, aeroplane, or aircraft, heavier-than-air vehicle, mechanically driven and fitted with fixed wings that support it in flight through the dynamic action of the air. . So this is the element that is not minor about learning from the airline industry: When you use their approach--for a simulator to be the real training--and provide the 'check-in-the-block,' it changes everything." The program's collaboration among warfighter, industry, and Service program office has fostered a level of communication and cooperation in an acquisition program that is refreshing. This is the way that we should conduct business with respect to integrating training into our weapons platform and system programs, particularly for major defense acquisition programs. As our office continues to work with the Services to ensure that training systems are efficiently integrated throughout a weapon platform's life cycle, we look forward to assisting other programs to collaborate with the Osprey office and gain insight into and use the best practices that helped it achieve its recent successes. Walsh is deputy director, readiness and training, policy and programs, Office of the Deputy Under Secretary of Defense (Readiness). Kratz is the assistant deputy under secretary of defense (logistics, plans and programs) in the Office of the Deputy Under Secretary of Defense (Logistics and Materiel Readiness The availability of materiel required by a military organization to support its wartime activities or contingencies, disaster relief (flood, earthquake, etc.), or other emergencies. ). The authors welcome comments and questions. Contact Walsh at john.walsh@osd.mil and Kratz at louis.kratz@osd.mil. |
|
||||||||||||||||||||

Printer friendly
Cite/link
Email
Feedback
Reader Opinion