T-38C transition to lean.


In 2000, the United States Air Force United States Air Force (USAF)

Major component of the U.S. military organization, with primary responsibility for air warfare, air defense, and military space research. It also provides air services in coordination with the other military branches. U.S.
 T-38 Avionics Upgrade System Program Office began to pursue Lean initiatives to reduce out-year program cost and delivery risk at the Boeing T-38C Upgrade facility located at Williams Gateway Airport facility in Mesa, Arizona Mesa is a city in Maricopa County, Arizona and part of the Phoenix-Mesa-Scottsdale Metropolitan Area. It is the third-largest city in Arizona, after Phoenix and Tucson.

Mesa is one of the United States' fastest-growing cities, and currently ranks as the 38th-largest.
. The T-38 Avionics Upgrade Program production system baseline plan was conventional for legacy aircraft upgrade and modification programs using a mass/craft assembly stationary dock approach. For a successful transition from conventional to Lean production, program management support is critical. The T-38 Program Off ice in St. Louis, Missouri proposed a four-phase approach to implementation. This approach and the benefits derived from the process are discussed.

**********

The United States Air Force T-38 Avionics Upgrade System Program Office (SPO SPO System(s) Program Office
SPO System(s) Project Office
Spo Schizosaccharomyces Pombe
SPO Srpski Pokret Obnove
) expressed a desire in the fourth quarter of CY2000 to pursue lean and efficient initiatives to reduce out-year program cost and delivery risk at the Boeing T-38C Upgrade facility located at Williams Gateway Airport facility in Mesa, Arizona.

Although lean or cellular manufacturing Cellular Manufacturing is a model for workplace design, and is an integral part of lean manufacturing systems. The goal of lean manufacturing is the aggressive minimisation of waste (or, more precisely, muda) in order to achieve maximum efficiency of resources.  principles can be found in aerospace production facilities across the industry, most activity has centered on new build part fabrication fabrication (fab´rikā´shn),
n the construction or making of a restoration.
 or new build airframe assembly. Legacy aircraft upgrades, modification, maintenance, and overhaul activities have been slower to embrace the Lean culture. Literature suggests that reluctance is due in part to the variability in work content and scope that intuitively would disrupt production system efficiencies based on standardized standardized

pertaining to data that have been submitted to standardization procedures.


standardized morbidity rate
see morbidity rate.

standardized mortality rate
see mortality rate.
 repeatable work.

The T-38 Avionics Upgrade Program (AUP See acceptable use policy.

AUP - acceptable use policy
) production system baseline plan was conventional for legacy aircraft upgrade and modification programs using a mass/ craft assembly stationary dock approach. Figure 1 pictorially represents the facility layout with the inherent stationary dock characteristics of people, parts, processes, and test equipment moving to and from aircraft with little resemblance of continuous or straight-line flow.

[FIGURE 1 OMITTED]

Coincident co·in·ci·dent  
adj.
1. Occupying the same area in space or happening at the same time: a series of coincident events. See Synonyms at contemporary.

2.
 with a desire to implement Lean principles at the T-38 Avionics Upgrade Production Facility, the upgrade production rate was scheduled to increase from 2 to 7 aircraft per month beginning January 2001 through March 2002.

THE PLAN

The T-38 Program Office in St. Louis, Missouri, responded to the customer's request by providing a statement of work (SOW sow

a female pig that has had a litter.


sow mouth
the maxilla is foreshortened and the lower jaw protrudes beyond it.

sow stall
) based on the systematic deployment of Lean Production Tactics. Figure 2 documents Lean Production Tactics and the evidence, in a context of tangible deliverables, that tactics have been deployed.

The SOW proposed a four-phase approach to Lean implementation.

Phase I Mobilize the Commitment to Lean

Phase II Transition Planning

Phase III Noun 1. phase III - a large clinical trial of a treatment or drug that in phase I and phase II has been shown to be efficacious with tolerable side effects; after successful conclusion of these clinical trials it will receive formal approval from the FDA  Implementation

Phase IV Sustaining the Gain

The SPO funded Phase I of the Boeing proposed SOW in Verb 1. sow in - place seeds in or on (the ground); "sow the ground with sunflower seeds"
inseminate, sow

farming, husbandry, agriculture - the practice of cultivating the land or raising stock
 the form of a manufacturing study contract signed on April 18, 2001. The study was intended to determine the applicability and benefits of Lean principles in the T-38 avionics upgrade environment and recommend a go-forward position and strategy.

The motivation for both Boeing and the Air Force to study and implement Lean was bottom line financial performance. Boeing would benefit from aggressively implementing Lean principles thereby converting cost to earnings for the remaining contracted fixed price options. The Air Force would benefit through substantiated out-year cost base reductions for approximately 50 percent of the production quantities not yet contracted.

Figure 3 presents the proposed SOW Phase sequences and spans. The proposed phase span times were representative of successful activities pursued on similar Boeing Integrated Defense Systems Boeing Integrated Defense Systems (Boeing IDS), based in St. Louis, Missouri, USA, is a unit of The Boeing Company responsible for defense and aerospace products and services.  programs and were used to support initial resource and cost estimating.

[FIGURE 3 OMITTED]

Funding for Phases II, III, and IV implementation were dependent upon compelling business case substantiation based on the future state value stream performance.

THE APPROACH

Program management support is the critical element of a successful transition from conventional to Lean production. Support materializes in the form of training budgets, a willingness to challenge legacy systems and processes, and a consistent resolve to stay the course for change amid inevitable cultural pushback push·back  
n.
1. A device or mechanism that affords movement of another object backwards: the pushback on a subway door.

2. Forced movement of troops back from the line.
 and challenges. The T-38 AUP was fortunate to have visionary managers within Boeing and the System Program Offices. The objective of Phase I--Mobilize the Commitment to Lean--was to identify potential performance benefits and non-recurring expenditures required to transition the T-38C program to a Lean enterprise.

Lean manufacturing Lean manufacturing is the production of goods using less of everything compared to mass production: less human effort, less manufacturing space, less investment in tools, and less engineering time to develop a new product.  specialists were assigned to the T-38C program in May 2001 in order to begin Phase I activities. St. Louis and Mesa T-38C program personnel, suppliers, and SPO representatives were trained on Lean principles, value stream mapping Value Stream Mapping is a Lean technique used to analyse the flow of materials and information currently required to bring a product or service to a consumer. At Toyota, where the technique originated, it is known as "Material and Information Flow Mapping" [1]. , and value stream analyses for the purpose of defining the current state product and information flows. The format of training consisted of lectures followed by hands-on simulations reinforcing Lean principles.

A weeklong Production Preparation Process (3P) event lead by Boeing certified Lean practitioners was held at the Williams Gateway Facility in July 2001. The 3P deliverable was a Lean future state value stream upon which a benefit comparison analysis to the current state was performed. Participants included production personnel (60 percent), production support and process owners The process owner is the person who co-ordinates the various functions and work activities at all levels of a process. This person might have the authority or ability to make changes in the process as required, and manages the entire process cycle to ensure performance  (30 percent), and management (10 percent). Figure 4 highlights 3P events critical to creating a realistic future state production system.

[FIGURE 4 OMITTED]

The three fundamental tenants for the future state T-38 Avionics Upgrade Program Production System were TAKT-timed production paced to meet customer's rate of demand, one-piece flow, and pull production. (In a world of acronyms, TAKT is not one of them. TAKT is a German word loosely translated to a conductor's baton or more closely associated with a drumbeat See Drumbeat 2000. . TAKT-time is a technique used to coordinate and synchronize See synchronization.  certain activities.)

Figure 5 pictorially represents the 3P defined future state facility layout with supporting value stream analyses.

[FIGURE 5 OMITTED]

The 3P event and subsequent value stream analyses clearly indicated implementing Lean would result in benefits consistent with the customer's desire to reduce program cost and delivery risk. Boeing leadership, with customer support, chose to accelerate the original SOW Phase II (Planning) and Phase III (Implementation) activities.

Based on the projected future state value stream performance, the Williams Gateway Production Facility accepted the challenge to accommodate the increase in rate 4 to 7 aircraft per month (September 2001 through May 2002) and transform the facility from stationary docks to Lean production cells pulsing at TAKT without increasing production workforce headcount.

Early in Phase I, Lean practitioners deployed 6S (5S plus Safety). Immediate performance gains were realized that facilitated the time production personnel were committing to training and Integrated Product Team (IPT IPT - IP Telephony ) meetings.

Accelerating the Lean implementation phase reduced the transition-planning span and forced a parallel path with implementation. (See Figure 6.) The key to successfully deploying this strategy was employee involvement. Personnel assigned to the production Lean cells met one and one-half hours daily over a period of five weeks with engineering (industrial, manufacturing, liaison), support functions (quality, safety, supply, facilities, business operations Business operations are those activities involved in the running of a business for the purpose of producing value for the stakeholders. Compare business processes. The outcome of business operations is the harvesting of value from assets , information technology), and management to reorganize re·or·gan·ize  
v. re·or·gan·ized, re·or·gan·iz·ing, re·or·gan·iz·es

v.tr.
To organize again or anew.

v.intr.
To undergo or effect changes in organization.
 work content and precedence, define work cell layout and facility requirements, and set performance goals. (See Figure 7.) The IPT environment, where all parties were stakeholders Stakeholders

All parties that have an interest, financial or otherwise, in a firm-stockholders, creditors, bondholders, employees, customers, management, the community, and the government.
 in Lean cell performance, was critical to meeting the aggressive Lean cell implementation schedule.

[FIGURES 6-7 OMITTED]

THE RESULTS

The health of a Boeing Lean Enterprise Production is measured in the context of five Interdependent Performance Metrics Performance metrics are measures of an organizations activities and performance. Performance metrics should support a range of stakeholder needs from customers, shareholders to employees [1]. ; specifically, Delivery, Cost, Inventory, Cycle, and Quality. Figure 8 quantitatively compares the impact of implementing Lean at the T-38 AUP facility. Low Rate Initial Production (LRIP LRIP Low Rate Initial Production
LRIP Limited Rate Initial Production
LRIP Logistics Readiness Improvement Program
) 1 values reflect the algebraic 1. (language) ALGEBRAIC - An early system on MIT's Whirlwind.

[CACM 2(5):16 (May 1959)].
2. (theory) algebraic - In domain theory, a complete partial order is algebraic if every element is the least upper bound of some chain of compact elements.
 average for each performance metric for the first 15 upgraded aircraft produced. The Lean Baseline values reflect the algebraic average for upgraded aircraft delivered in September 2001, prior to deploying any Lean initiatives at the production facility.

The Current Status metric values reflect the algebraic average for upgraded aircraft delivered in August 2003. The Future State metric values represent the value stream values projected during the July 2001 3P event.

The T-38C Program is well on its way to achieving its future state goals supported by a culture committed to continuous improvement.

Figure 9 presents Direct Labor Hours for delivered upgraded aircraft during the transition to a Lean production system pulsing at TAKT. For reference, an 85 percent learning curve, upon which the production operations were planned, is presented as a trend line. For comparative purposes, Pre- and Post-Lean implementation performance trends are provided.

[FIGURE 9 OMITTED]

The noteworthy improvement in DLHs per delivered upgrade is directly attributed to supporting an increase in rate without increasing production center headcount. This accomplishment was made possible through the elimination of the inherent waste associated with the craft/mass assembly production system and its accompanying support systems. The benefits of Lean would be short lived if the concept were simply based on driving the work force to work longer and harder rather than smarter.

Figure 10 reinforces the concept that increased efficiency was achieved through waste elimination. Data plotted on the dual axis graph are the Overtime Plan Target at 6 percent of total production hours (dashed line), percent overtime expended ex·pend  
tr.v. ex·pend·ed, ex·pend·ing, ex·pends
1. To lay out; spend: expending tax revenues on government operations. See Synonyms at spend.

2.
 by month to deliver aircraft (vertical bars), and the customer demand by month (solid line). The times each Lean production cell began operation are superposed on the graph and represented by vertical lines.

[FIGURE 10 OMITTED]

The workforce was held constant during the period of time when production rate increased from 2 to 7 aircraft per month and the Lean production cells began operations. The overtime trend followed the rate increase until all Lean cells were operational. Overtime rate The overtime rate calculates the ratio between employee overtime with the planned working times in a specific time period. Interpretation
A high overtime rate is an indicator of a temporary or permanent high workload.
 has remained constant at 2 percent.

LESSONS LEARNED

Implementing Lean principles is synonymous with synonymous with
adjective equivalent to, the same as, identical to, similar to, identified with, equal to, tantamount to, interchangeable with, one and the same as
 changing workforce culture. The workforce, both factory and non-factory alike, perform best when they claim ownership and accountability for their own actions and that of their team. Extending responsibility, authority, and accountability to self-directed work teams (within bounds) invigorates the workforce and fosters creativity. A workplace where everyone's opinion is valued equally and teams are recognized and rewarded for excellence will continuously improve. A successful transition to a Lean enterprise production system is as much about the people and culture transition as it is production flow and reconfiguring brick and mortar See bricks and mortar. .

Implementing Lean principles is a continuous journey. Remain flexible and support adaptive processes. Today's good idea will be replaced by tomorrow's creativity and improvements in technology in an environment of continuous improvement. The T-38C Production System future state was barely 2 years old before it had gone through two significant refinements. The subject matter experts participating in the original 3P event were unable to envision the realm of today's possibilities. It is as if they had to travel down the road of employee involvement and around the corner of continuous improvement before they could see where and how far they could go.

Implementing Lean principles is not free. Training and a willingness to invest in adaptive processes capable of supporting single piece continuous flow TAKT based production are required. However, as much as 90 percent of the system improvement can be accomplished with minimal capital investment. Experience has shown that most Lean initiatives easily surpass a 4.0 return on investment threshold.

AUTHOR BIOGRAPHIES

David D. Ott began his aerospace career in structures technology with a passion for designing for manufacturing and assembly. His background in definition engineering, materials research, and implementing quality and cost improvement initiatives provides a foundation to guide Lean Implementation throughout the product value stream. As a Lean Enterprise Implementation Specialist, Ott targets improving factory and non-factory processes in order to realize gains in quality and reduced cycle and cost.

(E-mail address See Internet address.

e-mail address - electronic mail address
: david.d.ott@boeing.com)

James B. Davis James B. Davis is the name of several people:
  • James B. Davis (musician) (1916-2007), American musician and a founder of The Dixie Hummingbirds
  • James B. Davis (general) (1935-), U.S. Air Force general
See also
  • James Davis (disambiguation)
 was trained in Kaizen This article is about a continual improvement philosophy. For Kaizen ($K), a fantasy currency invented by Kaizen Games, see Priston Tale.

“Red tag” redirects here. For designation of damaged structures, see Red-tagged structure.
, or continuous improvement, by proteges of Taiichi Ohno, and considers himself to be a student of Lean, seasoned by the school of hard knocks The School of Hard Knocks is an idiomatic phrase meaning the (sometimes painful) education one gets from life, often contrasted with formal education. It is a phrase which is most typically used by a person to claim a level of wisdom imparted by life experience, which they consider . Recent assignments include Industrial Engineering, Production Support, Process Redesign, Program Management, and Lean in both Commercial and Defense businesses. Davis has a bachelor's degree in finance and economics from Ohio State University Ohio State University, main campus at Columbus; land-grant and state supported; coeducational; chartered 1870, opened 1873 as Ohio Agricultural and Mechanical College, renamed 1878. There are also campuses at Lima, Mansfield, Marion, and Newark. , and a master of business administration in international business from Duke University.

(E-mail address: james.b.davis@boeing.com)
FIGURE 2. LEAN PRODUCTION TACTICS

Production Tactics        Deliverable

1 Value Stream Analysis   Current and Future
                          State Maps

2 Balance the Line        All Work Distributed by
                          Shift and Position

3 Standardize Work        Operator Sequence Charts/
                          Bar Charts in Place

4 Visuals in Place        Operator Sequence Charts/Bar
                          Charts Colored to Visually Display
                          Scheduled and Actual Work Status/
                          Quality Metrics/Cost Metrics

5 Point of Use Staging    Jobs Kitted and Staged at Point
                          of Use and Refill Process in Place

6 Feeder Lines            Parallel Worked Moved to Feeder
                          Lines

7 Continuous Flow Line    Product Flow is Pulsed Using an
                          Andon System/Product Moving at
                          TAKT Time

FIGURE 8. T-38C VALUE STREAM PERFORMANCE
COMPARISONS

                                     Lean       Current      Future
Metric                 LRIP 1      Baseline     Status       State
                      (Dec '00)   (Sept '01)   (Aug '03)   (June '04)

Delivery (Units/Mo)       1           4            7           7
Cost (DLHs/Ship)        100%         87%          37%         30%
Inventory (Units
  in Flow)                6           14          10           10
Cycle (M-Days)           109          64          30           30
Quality (Defects/
  1K Hrs)                NA          25.3        15.3         10.5
COPYRIGHT 2004 Defense Acquisition University Press
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2004, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Title Annotation:TUTORIAL
Author:Davis, James B.
Publication:Defense A R Journal
Geographic Code:1USA
Date:Aug 1, 2004
Words:2136
Previous Article:The lean enterprise--a management philosophy at Lockheed Martin.(TUTORIAL)
Next Article:Raytheon--new challenges new solutions, and documented results.(Company Profile)
Topics:



Related Articles
Hinges. (Product News: Supplies).
T-38 TESTS ON UPGRADE COMPLETED.(News)
Lean manufacturing: why a 'lean' strategy makes good business sense.(Manufacturing CENTRAL)
Hinges: Blum Inc.(PRODUCT NEWS: SUPPLIES)
The lean enterprise--a management philosophy at Lockheed Martin.(TUTORIAL)
LaBarge (labarge.com) secured a $2.2 million contract from Boeing (boeing.com) to supply wire harness assemblies for USAF T-38C training jets.(In...
The Healthy Beef Cookbook.(Brief article)(Book review)
Dance Off The Inches: Fat Burning Jam.(Video recording review)
GHP marketing office portfolio.(FINANCE)
Five drills to improve your speed and agility for lacrosse.(LACROSSE)

Terms of use | Copyright © 2009 Farlex, Inc. | Feedback | For webmasters | Submit articles