Specifying commissioning: what owners need to know.


The primary goal of commissioning is to test and verify (1) To prove the correctness of data.

(2) In data entry operations, to compare the keystrokes of a second operator with the data entered by the first operator to ensure that the data were typed in accurately. See validate.
 that the systems as installed will satisfy not only the engineer's design intent and the authorities codes and ordinances, but also satisfy the needs of the building's owner. Additional goals of commissioning are to provide hands-on practical training of the owner's operations and maintenance staff while the commissioning services are being performed, and to document the condition of systems as a result of the program, in the Final Commissioning Report form, so that the owner has a historical reference source to use when assessing future malfunctions, abnormalities, or deterioration de·te·ri·o·ra·tion
n.
The process or condition of becoming worse.
 in system performance.

In the steps taken to protect the owner on any given project, commissioning is the step that everyone must be involved in. Those so involved will reap the benefits from commissioning if they are properly prepared to commission their equipment and systems properly. If the specification is very clear and contains all of the proper elements, the commissioning costs are true, and "fudge factors fudge factor - A value or parameter that is varied in an ad hoc way to produce the desired result. The terms "tolerance" and slop are also used, though these usually indicate a one-sided leeway, such as a buffer that is made larger than necessary because one isn't sure exactly how " are not needed to insure Insure can mean:
  • To provide for financial or other mitigation if something goes wrong: see insurance or .
  • Or you may be looking for ensure or inshore.
 against ambiguities. The owner truly gets what he has paid for, and that is a properly working and commissioned building. To achieve this end, the means need to be clearly detailed in the commissioning specification. Each member of the commissioning team needs to know their roles and responsibilities to properly estimate their costs and involvement.

The commissioning process is substantially more detailed than standard Construction Administration services, which include verification of compliance with design intent and witnessing of life safety and critical systems tests.

The Process

Commissioning is an involved process concerning the owner, as well as the entire construction team for the duration of the project. Many contractors have a general idea as to what is involved, but the owner, and ultimate responsible party, needs to understand as well. It is in his best interest to insure that all involved in the commissioning of his building know what is expected and what he, the owner, wants. The owner needs understand the process in order to make sure that the process is clearly specified and purchased under each contract.

One way to do this is to clearly document the design intent, verify that the systems installation and performance is in accordance Accordance is Bible Study Software for Macintosh developed by OakTree Software, Inc.[]

As well as a standalone program, it is the base software packaged by Zondervan in their Bible Study suites for Macintosh.
 with the plans, specifications and design intent, and finally to train the owner's operators so that they fully understand the design intent and the operation and maintenance requirements of the equipment.

The commissioning process includes: Review of design documents to assure system integration and quality; Development of a detailed commissioning plan; Development of commissioning specifications; Review of shop drawings; Monitoring of the contractors installations; Following installation, a thorough and systematic MEP MEP maximum expiratory pressure.
MEP,
n muscle energy procedure; diagnostic and therapeutic technique. Pulsed muscle energy techniques (MET) and integrated neuromuscular inhibition technique (INIT) are two examples.
 Systems Building Management Systems (BMS BMS
abbr.
Bachelor of Marine Science
), and Controls performance testing Performance Testing covers a broad range of engineering or functional evaluations where a material, product, or system is not specified by detailed material or component specifications: Rather, emphasis is on the final measurable performance characteristics.  to insure proper component operation, data point calibration calibration /cal·i·bra·tion/ (kal?i-bra´shun) determination of the accuracy of an instrument, usually by measurement of its variation from a standard, to ascertain necessary correction factors. , controls sequencing, and systems interactive operation; Identification and resolution of MEP system deficiencies; Monitoring of corrective cor·rec·tive
adj.
Counteracting or modifying what is malfunctioning, undesirable, or injurious.

n.
An agent that corrects.


corrective,
n
 measure and systems retesting; Review of Operation and Maintenance manuals; Monitoring and supervision of MEP systems training for building staff; Development of a final commissioning report to document system performance and compliance with design intent.

Commissioning as required by the U.S. Green Building Council, to achieve an additional LEED[R] credit, is a more intensive process that requires the commissioning team's involvement from the start of the design process. In general, it is recommended that the commissioning team be involved in the project as early as possible

The Design Phase

The commissioning authority should be selected during the design phase. During this phase, the design team documents the owner's requirements as specified in the Owner's Program. It is the commissioning authority's responsibility to identify and assign responsibilities, document the initial design intent and develop the Preliminary Commissioning Plan. The commissioning agent will continue to document the design as it evolves, as well as further develop the Commissioning Plan and Specification.

At the completion of the design phase, the Commissioning Authority (CA) will review and accept contract documents for compliance with design intent; and the coordination of other mechanical, electrical, fire safety, and life-safety service requirements with the HVAC (Heating Ventilation Air Conditioning) In the home or small office with a handful of computers, HVAC is more for human comfort than the machines. In large datacenters, a humidity-free room with a steady, cool temperature is essential for the trouble-free  layout, equipment, and systems. This insures that everyone is "on the same page".

During the construction phase of the project, the CA must continue to review submittals from the various entities, finalize fi·nal·ize  
tr.v. fi·nal·ized, fi·nal·iz·ing, fi·nal·iz·es
To put into final form; complete or conclude: "They have jointly agreed ...
 details of the Commissioning Plan, form the commissioning team and start to conduct periodic commissioning team meetings. The shop drawings play a pivotal role during this phase. Shop drawings are required to be submitted to the designers involved in the project for review. Shop drawings ensure that all of the design elements will be incorporated into the construction of the building and allows for any oversights to be installed in a timely fashion and not disrupt the construction process. During this time the CA will be involved in observing construction, installation of equipment, its start-up Start-up

The earliest stage of a new business venture.
 and normal operation, as well as testing and balancing. During this phase, all of the consultants and contractors become fully coordinated to ensure proper installation of all integrated building systems. The architect and designers should conduct periodic inspections of work in progress to ensure that all systems and equipment are being installed according to according to
prep.
1. As stated or indicated by; on the authority of: according to historians.

2. In keeping with: according to instructions.

3.
 specifications. It is also helpful for the Owner to videotape videotape

Magnetic tape used to record visual images and sound, or the recording itself. There are two types of videotape recorders, the transverse (or quad) and the helical.
 construction he can "see" what is behind finished walls or ceilings. It is important to be able to quickly identify obstructions or space for future shafts.

The Acceptance Phase is where systems are verified ver·i·fy  
tr.v. ver·i·fied, ver·i·fy·ing, ver·i·fies
1. To prove the truth of by presentation of evidence or testimony; substantiate.

2.
 to insure proper installation. All of this is in preparation of turning the building over to the Owner. This phase is extensive and includes the start-up, testing and verification of installed systems.

The building Operation and Maintenance staff will also be trained on all of the equipment installed in the building and given the manuals, commissioning reports, and as-built records.

RAYMOND A. LEMLEY, VICE PRESIDENT AND DIRECTOR OF CONSTRUCTION ADMINISTRATIVE SERVICES, AND GARRY N. MYERS, VICE PRESIDENT AND DIRECTOR OF BUILDING AUTOMATION SERVICES, FLACK + KURTZ
COPYRIGHT 2005 Hagedorn Publication
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2005, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Title Annotation:Special report: engineering
Author:Myers, Garry N.
Publication:Real Estate Weekly
Geographic Code:1U2NY
Date:Feb 16, 2005
Words:985
Previous Article:Ten engineering strategies that really work in practice.(Special report: engineering)
Next Article:Holistic approach to environmentally friendly building.(Special report: engineering)
Topics:



Related Articles
How to survive the roof warranty wars. (evaluation of manufacturers warranties) (Property Management/Improvement; Section I)
Turn-key deals serve tenants and brokers. (management services offered by W and M Properties) (Mid-Year Review & Forecast, Section I) (Company...
The real estate broker in the twenty-first century.(Industry Overview)
Complying with local law 11 no easy task. (Insiders Outlook).(building inspection laws, compliance strategies)(Brief Article)
COUNCIL APPROVES GROWTH AT SANTA CLARITA FILM SITE.(Business)
Engineering Thermoplastics: Polycarbonates, Polyacetals, Polyesters, Cellulose Esters.(Hot Off The Press)(Advertisement)
Update on new York's facade inspection law.(Special report: engineering)(6th Cycle Local Law 11)
Damage control, or how to sue your contractor.
Damage control, or how to sue your contractor.(INSIDER'S OUTLOOK)
CITY COUNCIL TO REVISIT PLAN FOR GREENBELT CONSULTANT LEADS DRAFTING OF REVISED ASSESSMENT IDEA.(News)

Terms of use | Copyright © 2009 Farlex, Inc. | Feedback | For webmasters | Submit articles