Southwestern Resources Corp.: 36 Metres of 9.7 Grams Per Tonne Gold Intersected in Hole B05-148, Boka Gold Project, Yunnan Province, China.VANCOUVER, British Columbia British Columbia, province (2001 pop. 3,907,738), 366,255 sq mi (948,600 sq km), including 6,976 sq mi (18,068 sq km) of water surface, W Canada. Geography -- Southwestern Resources Corp. (TSX TSX Toronto Stock Exchange (TSE before April, 2002) TSX Transfer from Stack Pointer to Index TSX True Space Extension :SWG SWG abbr. standard wire gauge ) is pleased to announce that results have been received for a further 19 drill holes from the Company's Boka Gold Project located in Yunnan Province Noun 1. Yunnan province - a province of southern China Yunnan Cathay, China, Communist China, mainland China, People's Republic of China, PRC, Red China - a communist nation that covers a vast territory in eastern Asia; the most populous country in the world , China. Southwestern has a 90% interest in the Boka Gold Project, which is comprised of 153 square kilometres Square kilometre (U.S. spelling: square kilometer), symbol km², is a decimal multiple of the SI unit of surface area, the square metre, one of the SI derived units. 1 km² is equal to:
tr.v. paved, pav·ing, paves 1. To cover with a pavement. 2. To cover uniformly, as if with pavement. 3. To be or compose the pavement of. and gravel road A gravel road is a type of unpaved road surfaced with gravel that has been brought to the site from a quarry or stream bed. They are common in less-developed nations, and also in the rural areas of developed nations such as Canada and the United States. north of the capital city of Kunming. Highlights of the latest results include intersections of 2.3 grams per tonne tonne measure of weight or mass; 1 tonne=1000 kg. See also ton. gold over 68.1 metres and 9.7 grams per tonne gold over 36.0 metres in hole B05-148, 2.2 grams per tonne gold over 59.0 metres in hole B05-149 and 2.7 grams per tonne gold over 46.0 metres in hole B05-139. All drill results are from holes drilled at Boka 1. Holes B05-130 and B05-141, drilled on Section 4800, intersected gold mineralization Mineralization The process by which the body uses minerals to build bone structure. Mentioned in: Rickets mineralization, n the bioprecipitation of an inorganic substance. at a hole depth of over 500 metres confirming a down dip extension of 450 metres for the Boka 1 South Gold Zone. Intersections of gold mineralization in hole B05-145 continues to confirm a down dip extension of the Boka 1 North Gold Zone. The latest drill results have extended the strike length of the Boka 1 Gold Zone to 1,400 metres and the down dip extent to 450 metres. Results for the latest drill holes are listed in the following table. For drill hole locations please see the Company's website at www.swgold.com.
---------------------------------------------------------------
Intersection
------------------- Core Gold
Hole From To Interval Assay
No. (metres) (metres) (metres) (grams/tonne)
---------------------------------------------------------------
---------------------------------------------------------------
B05-129 117.30 164.50 47.20 1.70
---------------------------------------------------------------
175.00 181.10 6.10 2.10
---------------------------------------------------------------
187.10 205.00 17.90 1.60
---------------------------------------------------------------
---------------------------------------------------------------
B05-130 542.00 550.20 8.20 2.80
---------------------------------------------------------------
573.80 578.00 4.20 2.10
---------------------------------------------------------------
---------------------------------------------------------------
B05-131 361.90 367.40 5.50 1.20
---------------------------------------------------------------
423.10 429.10 6.00 1.50
---------------------------------------------------------------
---------------------------------------------------------------
B05-132 158.10 170.30 12.20 2.10
---------------------------------------------------------------
178.00 208.40 30.40 1.90
---------------------------------------------------------------
216.30 218.20 1.90 1.20
---------------------------------------------------------------
222.50 242.20 19.70 2.20
---------------------------------------------------------------
258.00 276.60 18.60 1.50
---------------------------------------------------------------
---------------------------------------------------------------
B05-133 No significant results
---------------------------------------------------------------
---------------------------------------------------------------
B05-134 436.00 442.00 6.00 2.00
---------------------------------------------------------------
---------------------------------------------------------------
B05-135 121.00 129.00 8.00 1.20
---------------------------------------------------------------
---------------------------------------------------------------
B05-136 188.90 224.90 26.00 2.30
---------------------------------------------------------------
including 216.90 220.90 4.00 4.50
---------------------------------------------------------------
---------------------------------------------------------------
B05-137 Abandoned before reaching target
---------------------------------------------------------------
---------------------------------------------------------------
B05-138 No significant intersections
---------------------------------------------------------------
---------------------------------------------------------------
B05-139 263.50 309.50 46.00 2.70
---------------------------------------------------------------
including 279.50 287.50 8.00 3.90
---------------------------------------------------------------
299.50 305.50 6.00 4.40
---------------------------------------------------------------
366.10 373.90 7.80 3.20
---------------------------------------------------------------
412.00 424.00 12.00 1.90
---------------------------------------------------------------
448.50 454.50 6.00 1.30
---------------------------------------------------------------
522.50 544.50 22.00 1.50
---------------------------------------------------------------
---------------------------------------------------------------
B05-140 365.40 388.05 22.65 2.10
---------------------------------------------------------------
---------------------------------------------------------------
B05-141 517.50 525.20 7.70 1.80
---------------------------------------------------------------
---------------------------------------------------------------
B05-142 370.30 378.30 8.00 1.10
---------------------------------------------------------------
418.70 426.70 8.00 3.30
---------------------------------------------------------------
---------------------------------------------------------------
B05-144 135.00 149.40 14.40 2.90
---------------------------------------------------------------
including 143.00 146.60 3.60 6.50
---------------------------------------------------------------
---------------------------------------------------------------
B05-145 322.90 332.90 10.00 2.00
---------------------------------------------------------------
417.90 427.90 10.00 2.30
---------------------------------------------------------------
---------------------------------------------------------------
B05-146 105.00 133.40 28.40 2.30
---------------------------------------------------------------
including 109.30 115.50 6.20 4.00
---------------------------------------------------------------
155.00 171.30 16.30 2.20
---------------------------------------------------------------
including 161.00 164.90 3.90 4.90
---------------------------------------------------------------
211.50 222.60 11.10 1.80
---------------------------------------------------------------
---------------------------------------------------------------
B05-148 223.70 291.80 68.10 2.30
---------------------------------------------------------------
including 236.60 246.10 9.50 3.30
---------------------------------------------------------------
276.70 281.00 4.30 6.70
---------------------------------------------------------------
297.30 333.30 36.00 9.70
---------------------------------------------------------------
including 297.30 309.70 12.40 25.30
---------------------------------------------------------------
382.70 401.40 18.70 1.50
---------------------------------------------------------------
416.40 417.90 1.50 4.20
---------------------------------------------------------------
(bottomed in mineralization)
---------------------------------------------------------------
---------------------------------------------------------------
B05-149 49.20 108.20 59.00 2.20
---------------------------------------------------------------
Holes B05-143, B05-147 and B05-150 to 155 have been completed and results are pending. There are presently five diamond drill rigs operating on the Property with an additional two rigs slated to be operational by March. After the Chinese New Year Chinese New Year (Simplified Chinese: ; Traditional Chinese: ; Pinyin: Chūnjié), or Spring Festival , four rigs will be moved to Boka 7 (located approximately three kilometres on strike to the south of Boka 1), to commence a 200 metre by 100 metre spaced drill program. To date, only 11 drill holes have been put down on Boka 7, nine holes in 2003 and two holes in 2004. Ten of these 11 holes intersected significant widths and grades of mineralization (see news release dated December 12, 2005) over a strike length of more than one kilometer. Drilling will continue at Boka 1 and the Boka 7 drill program is being initiated as part of the pre-feasibility study presently being conducted on the project under the supervision of Ausenco Limited. Also as part of the pre-feasibility study, SRK SRK Shah Rukh Khan (Indian actor) SRK Shoryuken (fighting games) SRK Soave-Redlich-Kwong (thermodynamic model) SRK Syk-Related Tyrosine Kinase Consulting has been engaged for the resource/reserve estimation and mining evaluation; and Golder Associates for the tailings Tailings (also known as tailings pile, tails, leach residue, or slickens[1]) are the materials left over[2] after the process of separating the valuable fraction from the worthless fraction of an ore. , hydrology hydrology, study of water and its properties, including its distribution and movement in and through the land areas of the earth. The hydrologic cycle consists of the passage of water from the oceans into the atmosphere by evaporation and transpiration (or , environmental and social aspects of the study. Paul Schmidt
Paul Schmidt was a translator in the German foreign ministry from 1923-1945. During his career he served as the translator for Neville Chamberlain's negotiations with Adolf Hitler over the Munich , P. Eng P. ENG Professional Engineer P. ENG process engineer , a highly experienced metallurgical met·al·lur·gy n. 1. The science that deals with procedures used in extracting metals from their ores, purifying and alloying metals, and creating useful objects from metals. 2. and project manager, has joined the Southwestern team and is responsible for overseeing the preparation of the Boka pre-feasibility study. Quality Control Southwestern has implemented a quality control program to ensure best practice in lithogeochemical sampling and analysis of soil, rock chips, trench, tunnel and drill core samples. All drill core samples (approximately two metre, half-core composites) are shipped directly in security sealed bags to the SGS-China Laboratories preparation facility in Kunming. The entire composite is prepped to -10 mesh and a 500 gram split is sent to the SGS-CSTC Standards Technical Services Ltd. facility in Tianjan for conventional fire assay using a 50 gram charge. Other elements are analyzed an·a·lyze tr.v. an·a·lyzed, an·a·lyz·ing, an·a·lyz·es 1. To examine methodically by separating into parts and studying their interrelations. 2. Chemistry To make a chemical analysis of. 3. using ICP (1) (Internet Cache Protocol) A protocol used by one proxy server to query another for a cached Web page without having to go to the Internet to retrieve it. See CARP and proxy server. methods at the SGS SGS Société Générale de Surveillance SGS Symantec Gateway Security (appliance) SGS School of Graduate Studies SGS Subgrid Scale SGS Singapore Government Securities SGS Shell Global Solutions Canada Inc. facilities in Mississauga, Ontario For the First Nation, see . Mississauga (pronounced: [ˌmɪsɪˈsɑgə] listen . Exploration samples (rock chip, soil, trench and tunnel) are shipped directly in security sealed bags to the assay laboratory of the Northwest Non-Ferrous Geology Research Institute (ISO (1) See ISO speed. (2) (International Organization for Standardization, Geneva, Switzerland, www.iso.ch) An organization that sets international standards, founded in 1946. The U.S. member body is ANSI. 9002) located in Xian, Shanxi Province, China and are digested in an aqua regia aqua regia (äk`wə rē`jēə) [Lat.,=royal water], corrosive, fuming yellow liquid prepared by mixing one volume of concentrated nitric acid with three to four volumes of concentrated hydrochloric acid. acid digestion digestion Process of dissolving and chemically converting food for absorption by cells. In the mouth, food is chewed, mixed with saliva, which begins to break down starches, and kneaded by the tongue into a ball for swallowing. and analyzed for gold and various other elements using atomic absorption. The Company submits its own standards as a measure of the accuracy of the analysis. Field duplicates and pulp duplicates are routinely analyzed for precision. Routine assay checks from drill core are made at ALS Als (äls), Ger. Alsen, island, 121 sq mi (313 sq km), Sønderjylland co., S Denmark, in the Lille Bælt, separated from the mainland by the narrow Alensund. Chemex in Vancouver, B.C. Sample results are received in batches and not as assays for an entire drill hole. John Zhang, Project Manager for Southwestern in China, is carrying out the exploration program. John Paterson John Paterson may refer to:
Forward-Looking Statement forward-looking statement A projected financial statement based on management expectations. A forward-looking statement involves risks with regard to the accuracy of assumptions underlying the projections. Statements in this release that are forward-looking statements are subject to various risks and uncertainties concerning the specific factors disclosed under the heading "Risk Factors" and elsewhere in the Company's periodic filings with Canadian securities regulators. Such information contained herein represents management's best judgment as of the date hereof here·of adv. Of this. hereof Adverb Formal or law of or concerning this Adv. 1. hereof - of or concerning this; "the twigs hereof are physic" based on information currently available. The Company does not assume the obligation to update any forward-looking statement. Southwestern Resources Corp. (TSX:SWG) |
|
||||||||||||||||

Printer friendly
Cite/link
Email
Feedback
Reader Opinion