Shutdown reminders.
Operators, follow the word on Pages 2-84 and 2-85 of TM 5-2420-224-10 when you shut down To quit all applications and turn off the computer. the excavator ex·ca·va·tor ( k sk -v . Doing it wrong can cost your unit about $300 for a new generator.
The right way is real simple:
1. Park the excavator and let the engine idle for 5 minutes.
2. Move the throttle lever to OFF. This shuts off fuel to the engine.
3. Turn off the ignition switch.
4. Turn the master disconnect disconnect - SCSI reconnect switch key to OFF.
Never turn off the master disconnect switch key or the ignition switch before setting the throttle to OFF.
If you don't shut off the fuel first, the generator will build up a load beyond its capacity arm burn out.
COPYRIGHT 2006 PS Magazine
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2006, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.
|
Reader Opinion