CITY OF EUGENE

Country Club Road, between Willagillespie Road and Southwood Lane - Work will include manhole adjustments and installation of pedestrian crossing islands. Watch for construction equipment traffic, lane closures and lane shifts. Two-way traffic will be allowed at all times. Expect short to moderate delays.

Crescent Avenue, between Shadow View and Coburg Road - Top lift paving is scheduled for Monday. During paving expect heavy delays and use alternate routes if possible. After Monday, the work will include manhole adjustments; expect slight to moderate delays. Flagged two-way traffic will be allowed at all times.

Danebo Road, between West 11th and Royal avenues - Watch for construction equipment traffic, lane closures and lane shifts. Two-way traffic will be allowed at all times. Expect short, intermittent delays.

Elmira Road and Maple Street - Heavy construction begins Monday. Installation of the underground storm system will occur from Roosevelt to Elmira on Maple Street and then along Elmira Street. The road will be closed to through-traffic.

Eugene Airport - Watch for construction equipment and trucks traveling to and from the Eugene Airport from Airport Road to Northrop Drive.

Fox Hollow Road, between East Amazon Drive and Donald Street - Work will include manhole adjustments. Closures to through-traffic will alternate on two sections of Fox Hollow Road between East 43rd Avenue and East 46th Avenue, and East 46th Avenue and Donald Street, with detours implemented. Local traffic will have access at all times. The section of Fox Hollow Road between 43rd Avenue and East Amazon Drive will be open to two-way traffic at all times.

Roosevelt Boulevard between Maple Street and Belt Line Road - Work may include corrective grinding work between Bertelsen Road and Belt Line. Watch for construction equipment traffic, lane closures, and lane shifts. Two-way traffic will be allowed at all times. Expect short, intermittent delays.

Royal Avenue, between Waite and Terry streets - Work will include manhole adjustments, striping and loop detector installation. Watch for construction equipment traffic, lane closures and lane shifts. Expect moderate delays and use alternate routes if possible.

LANE COUNTY

Cedar Flat (Deerhorn Road) - Guardrail installation and adjustment from Highway 126 to Milepost 3.8. Traffic through construction area will be controlled by flaggers, as necessary. Expect minimal delays.

Cottage Grove Area (Martin Creek Road at Milepost 0.7) - A fish culvert will be installed. Road will be opened to one-lane traffic. Expect 10-15 minute delays.

Creswell (Harvey Road) - Road construction and pipe installation from Highway 99 to Scott Avenue. Traffic through construction area will be controlled by flaggers, as necessary. Expect minimal delays. A detour route has been posted from First Avenue to Auburn Lane.

Westfir-Oakridge (Office Covered Bridge) - Office Covered Bridge located on Old Mill Road at the intersection with Westfir-Oakridge Road is temporarily closed to vehicular and pedestrian traffic during the painting of the structure. Foot and bike traffic may use detour routes to connect with area trails. Project signage indicates detour routes.

OREGON DEPARTMENT OF TRANSPORTATION

Interstate 5 - McKenzie River To Goshen: This project will replace two sets of bridges at the I-5/Highway 58 interchange (in Goshen) and replace two bridges that carry I-5 traffic over the McKenzie River north of Eugene-Springfield.

McKenzie View Drive - Watch for traffic occasionally controlled by flaggers. Watch for roadside crews and construction equipment.

I-5 at McKenzie River - Watch for intermittent nighttime single-lane closures as crews complete work in the median.

I-5 at the Highway 58 Goshen interchange - The I-5 southbound off-ramp to eastbound Highway 58 has shifted one-third mile north of its previous location, to just past the 30th Avenue overpass. Watch for signs and message boards directing traffic to this new alignment. Watch for nighttime single-lane closures in each direction to accommodate paving. The westbound Highway 58 to southbound I-5 on-ramp is closed. Signs direct traffic to use Cloverdale Road or the I-5 ramp to Franklin Boulevard.

I-5 northbound at Franklin Boulevard (Milepost 188) - Weather permitting, the northbound I-5 off-ramp to Franklin Boulevard will be closed the week of Monday, June 15. Watch for signs directing traffic to a temporary detour route one mile north at the 30th Avenue exit (exit 189).

Franklin Boulevard under I-5 - Watch for roadside workers and construction equipment. Watch for traffic occasionally controlled by flaggers. Expect brief delays for bridge work.

Belt Line Road at Coburg Road Interchange - This project realigns the eastbound off-ramp onto Coburg Road, adding turn lanes and storage for stopped vehicles. Completion date for this contract is Dec. 31. Construction will begin later this summer; the exact dates are not known at this time.

Highway 58 between Goshen and Oakridge - This project will replace or repair five bridges along Highway 58 between Goshen and Oakridge. The bridges are just east of Goshen; just east of the I-5 and Highway 58 interchange; the Union Pacific Railroad Bridge near Pleasant Hill; the Lost Creek Bridge west of Lowell; and a bridge over a private logging road near Oakridge. Two-lane traffic will be maintained between 7 a.m. and 7 p.m. seven days a week.

Highway 126 - This project includes new pavement, guardrail, retaining walls, signs, striping and bridge work on Highway 126 between Milepost 7 and Milepost 26.5. There will be regular one-lane closures through October. Work will be performed both day and night including 24-hour flagging at times. Watch for flaggers directing traffic and for trucks entering and exiting the highway. Expect regular 10- to 20-minute delays and allow for extra time when traveling to and from the coast. Travelers to and from the Reedsport area should consider taking Highway 38 with I-5 access at Curtin.

Highway 126 - This project replaces a bridge located on Highway 126 over the North Fork of the Siuslaw River just east of Florence. There will be occasional one-lane closures on this project. Watch for flaggers directing traffic and for trucks entering and exiting the highway. Boaters should pay attention to the signs on the existing bridge and work bridge directing them to the boating channel.

Highway 101 - Siuslaw River Bridge: This project includes major structural, mechanical and electrical upgrades to the existing draw bridge over the Siuslaw River in Florence. There will be occasional one-lane closures at night. Watch for flaggers directing traffic and for trucks entering and exiting the highway. Boaters should pay attention to the signs on the existing bridge and work bridge directing them to the boating channel. At least one lift span of the bridge will remain in operation for the duration of the project.

I-5, Whiteaker Avenue to London Road - This project will replace three I-5 bridges and repair two other I-5 bridges near Cottage Grove (I-5 Milepost 174 through Milepost 172). There will be alternating one-way traffic controlled by flaggers on Main Street above the overpass in Cottage Grove during daytime hours the week of June 15.

Northbound and southbound I-5 over Coast Fork Willamette River - Watch for roadside work crews, and construction vehicles entering and exiting the travel lanes.

Northbound and southbound I-5 over Latham Road - Watch for roadside work crews, and construction vehicles entering and exiting the travel lanes.

Northbound and southbound I-5 over Martin Creek - Watch for roadside work crews, and construction vehicles entering and exiting the travel lanes.

Saginaw Road Bridge over I-5 - Drivers using the Saginaw Road overpass should expect daytime alternating one-way traffic controlled by flaggers, and up to 20-minute delays Monday through Friday. Watch for roadside work crews and equipment in the work zone.

Northbound and Southbound I-5 over Brown Creek - Watch for intermittent single-lane closures Monday through Friday and roadside work crews, and construction vehicles entering and exiting the travel lanes. Gettings Creek Rest Area on southbound I-5 is closed for maintenance and nearby construction work until Oct. 31. Services are available at Cabin Creek Rest Area 35 miles south.

Southbound I-5 over Camas Swale - Expect nighttime single-lane closures Monday through Friday. Watch for roadside work crews, and construction vehicles entering and exiting the travel lanes around the clock. Please watch for construction signs and drive carefully through the work zone.
COPYRIGHT 2009 The Register Guard
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2009 Gale, Cengage Learning. All rights reserved.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Title Annotation:City/Region
Publication:The Register-Guard (Eugene, OR)
Date:Jun 14, 2009
Words:1333
Previous Article:BRIEFLY.
Next Article:BOOK NOTES.
Topics:


Related Articles
ROAD REPORT.
ROAD REPORT.
ROAD REPORT.
ROAD REPORT.
ROAD REPORT.
ROAD REPORT.
ROAD REPORT.
ROAD REPORT.
ROAD REPORT.
ROAD REPORT.

Terms of use | Copyright © 2015 Farlex, Inc. | Feedback | For webmasters