Printer Friendly
The Free Library
14,559,201 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

Queenstake Resources Ltd.: Jerritt Canyon Reserve and Resource Update.


Business Editors

DENVER--(BUSINESS WIRE)--Sept. 19, 2003

A reconciliation of reserves and resources at Queenstake's 100% owned Jerritt Canyon canyon

Very narrow, deep valley cut by a river through resistant rock and having steep, almost vertical sides. Canyons occur most often in arid or semiarid regions. Some canyons (e.g., the Grand Canyon) are spectacular natural features. See also submarine canyon.
 property as at June June: see month.  30, 2003, relative to those previously stated as at December December: see month.  25, 2002 has been prepared and is reported on the attached tabulation tab·u·late  
tr.v. tab·u·lat·ed, tab·u·lat·ing, tab·u·lates
1. To arrange in tabular form; condense and list.

2. To cut or form with a plane surface.

adj.
Having a plane surface.
. Reserves have been calculated on the basis of a $320 gold price and are based on resources estimated by PAC PAC, see political action committee.


(1) See perceptual audio coding.

(2) (Programmable Automation Controller) A programmable microprocessor-based device that is used for discrete manufacturing, process control
 Kriging Kriging is group of geostatistical techniques to interpolate the value of a random field (e.g. the elevation Z of the landscape as a function of the geographic location) at an unobserved location from observations of its value at nearby locations. , a method that has produced highly reliable resource estimates in the past. The Jerritt Canyon resource and reserve estimates are reported as part of an ongoing rigorous data review program supervised su·per·vise  
tr.v. su·per·vised, su·per·vis·ing, su·per·vis·es
To have the charge and direction of; superintend.



[Middle English *supervisen, from Medieval Latin
 by Mr. Donald Donald (Domnall, Domhnall, Dumhnuil, Dónall) is an anglicized version of a Scottish or Irish Gaelic personal name, containing the elements dumno "world" and val "rule", viz. "ruler of the world". Compare Dumnorix.  Colli, Chief Mine Geologist, and Mr. Mark Odell Odell may refer to:
  • Odell, Oregon
  • Odell, Nebraska
  • Odell, Illinois
  • Odell, Indiana
  • Odell, New Hampshire
  • Odell, Bedfordshire
  • Odell Residence Hall at Lewis & Clark College
See also O'Dell.
, Mining Manager, who are appropriate qualified persons as defined by Canadian Canadian (kənā`dēən), river, 906 mi (1,458 km) long, rising in NE New Mexico. and flowing E across N Texas and central Oklahoma into the Arkansas River in E Oklahoma.  National Instrument 43-101.

Production by the previous owners in the first half of the year totaled 152,000 ounces while proven and probable PROBABLE. That which has the appearance of truth; that which appears to be founded in reason.  reserves for the period decreased by only 56,745 ounces. Total proven and probable reserves at June 30, 2003 are 524,168 ounces compared to 580,913 ounces at December 25, 2002. Measured and indicated resources stand at 1,952,590 ounces, compared to 1,837,685 ounces as reported at December 25, 2002.

The net change in reserves relative to December 2002 is comprised of depletion depletion n. when a natural resource (particularly oil) is being used up. The annual amount of depletion may, ironically, provide a tax deduction for the company exploiting the resource because if the resource they are exploiting runs out, they will no longer be able  due to production, additions due to increased definition drilling and inclusion of some blocks of resource which previously met reserve criteria criteria (krītēr´ē),
n.
 but which were not included in the December 2002 reserve statement. In addition, reevaluation Noun 1. reevaluation - the evaluation of something a second time (or more)
rating, valuation, evaluation - an appraisal of the value of something; "he set a high valuation on friendship"
 of the stockpile stock·pile  
n.
A supply stored for future use, usually carefully accrued and maintained.

tr.v. stock·piled, stock·pil·ing, stock·piles
To accumulate and maintain a supply of for future use.
 and cessation cessation Vox populi The stopping of a thing. See Smoking cessation.  of stockpile screening have brought additional material to the reserve category while lowering the overall grade of the reserve.

Depletion has been at a lower rate than that of production as some resource material and some material that was neither resource nor reserve was mined during the period. Non reserve resource material provided 24,929 ounces. This is typical of the production pattern at Jerritt, where mineralized min·er·al·ize  
v. min·er·al·ized, min·er·al·iz·ing, min·er·al·iz·es

v.tr.
1. To convert to a mineral substance; petrify.

2. To transform a metal into a mineral by oxidation.

3.
 material additional to resource is routinely discovered by underground drilling and is frequently developed and mined before being brought to the reserve category.

The pace of development is increasing at Jerritt and over the next few months the results of definition drilling performed from newly developed drifts will be incorporated into a new resource and reserve estimate as at the end of this year.

Queenstake is approaching the end of its first quarter as owner of Jerritt Canyon. Third quarter production is expected at approximately ap·prox·i·mate  
adj.
1. Almost exact or correct: the approximate time of the accident.

2.
 78,000 ounces. Revenues for the quarter from 73,000 ounces of gold shipped and sold are expected to total $26,400,000, representing an average sale price of $362 per ounce ounce, in zoology
ounce, in zoology: see leopard.
ounce, unit of measurement
ounce: see English units of measurement.
. Cash operating costs operating costs nplgastos mpl operacionales  are expected to total $265 per ounce. This is a little higher than budgeted and is due mainly to additional administrative costs administrative costs,
n.pl the overhead expenses incurred in the operation of a dental benefits program, excluding costs of dental services provided.
 associated with the acquisition and to the reestablishment Re`es`tab´lish`ment   

n. 1. The act reëstablishing; the state of being reëstablished.
 of gold inventory post acquisition as inventory at closing was for the account of the sellers. It is anticipated that cash operating costs will normalize normalize

to convert a set of data by, for example, converting them to logarithms or reciprocals so that their previous non-normal distribution is converted to a normal one.
 in the fourth quarter leading to cash costs of the order of $250 per ounce.

Forward looking statement - This news release contains "Forward-Looking Statements forward-looking statement

A projected financial statement based on management expectations. A forward-looking statement involves risks with regard to the accuracy of assumptions underlying the projections.
" within the meaning of Section 21E of the United States United States, officially United States of America, republic (2005 est. pop. 295,734,000), 3,539,227 sq mi (9,166,598 sq km), North America. The United States is the world's third largest country in population and the fourth largest country in area.  Securities Exchange act of 1934, as amended a·mend  
v. a·mend·ed, a·mend·ing, a·mends

v.tr.
1. To change for the better; improve: amended the earlier proposal so as to make it more comprehensive.

2.
 and the Private Securities Litigation Reform Act The Private Securities Litigation Reform Act of 1995 (PSLRA) implemented several significant substantive changes affecting certain cases brought under the federal securities laws, including changes related to pleading, discovery, liability, class representation and awards fees and  of 1995. All statements, other than statements of historical fact, included in this release, and Queenstake's future plans are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements are based on the estimates and opinions of management on the date the statements are made, and Queenstake does not undertake any obligation to update forward-looking statements should conditions or management's estimates or opinions change.

SEC file number 0-24096


---------------------------------------------------------------------
JERRITT CANYON TOTAL MINERAL RESOURCES - JUNE 2003
---------------------------------------------------------------------
Deposit /area             Measured                 Indicated
              -------------------------------------------------------
                    Tons   Oz/st   Cont'd       Tons  Oz/st    Cont'd
                                       Oz                          Oz
---------------------------------------------------------------------
---------------------------------------------------------------------
Murray           221,479   0.369   81,714   557,606  0.285    159,002
---------------------------------------------------------------------
MCE               15,925   0.486    7,738    57,602  0.331     19,043
---------------------------------------------------------------------
SSX              456,954   0.378  172,598 1,913,434  0.279    534,290
---------------------------------------------------------------------
Smith            146,092   0.416   60,813   569,396  0.280    159,616
---------------------------------------------------------------------
B-Pit                  -       -        -    63,453  0.261     16,574
---------------------------------------------------------------------
Smith East             -       -        -   252,769  0.333     84,172
---------------------------------------------------------------------
Mahala                 -       -        -   212,729  0.342     72,753
---------------------------------------------------------------------
---------------------------------------------------------------------
Subtotal         840,451   0.384  322,863 3,626,989  0.288  1,045,450
---------------------------------------------------------------------
Stockpiles        48,999   0.121    5,927 1,409,721  0.060     84,014
---------------------------------------------------------------------
Underground
 (Polygonal)           -       -        - 1,458,374  0.265    386,333
---------------------------------------------------------------------
Open Pit
 (Polygonal)           -       -        -   683,546  0.158    108,003
---------------------------------------------------------------------
---------------------------------------------------------------------
TOTAL            889,450   0.370  328,790 7,178,630  0.226  1,623,800
---------------------------------------------------------------------


---------------------------------------------------------------------
JERRITT CANYON TOTAL MINERAL RESOURCES - DECEMBER 2002
---------------------------------------------------------------------
---------------------------------------------------------------------
TOTAL          1,102,744   0.370  412,896 5,875,010  0.243  1,424,789
---------------------------------------------------------------------


---------------------------------------------------------------------
JERRITT CANYON TOTAL MINERAL RESOURCES - JUNE 2003
---------------------------------------------------------------------
Deposit /area        Total Measured and
                    Indicated Resources             Inferred
              -------------------------------------------------------
                    Tons   Oz/st   Cont'd     Tons   Oz/st     Cont'd
                                       Oz                          Oz
---------------------------------------------------------------------
---------------------------------------------------------------------
Murray           779,085   0.309  240,716   482,560  0.278    134,364
---------------------------------------------------------------------
MCE               73,527   0.364   26,781    63,389  0.365     23,143
---------------------------------------------------------------------
SSX            2,370,388   0.298  706,888 1,516,578  0.235    356,041
---------------------------------------------------------------------
Smith            715,488   0.308  220,429   346,745  0.233     80,880
---------------------------------------------------------------------
B-Pit             63,453   0.261   16,574    64,822  0.245     15,849
---------------------------------------------------------------------
Smith East       252,769   0.333   84,172    83,127  0.256     21,280
---------------------------------------------------------------------
Mahala           212,729   0.342   72,753   263,574  0.239     63,122
---------------------------------------------------------------------
---------------------------------------------------------------------
Subtotal       4,467,440   0.306 1,368,313 2,820,795  0.246   694,679
---------------------------------------------------------------------
Stockpiles     1,458,720   0.062   89,941         -      -          -
---------------------------------------------------------------------
Underground
 (Polygonal)   1,458,374   0.265  386,333   420,012  0.273    114,512
---------------------------------------------------------------------
Open Pit
 (Polygonal)     683,546   0.158  108,003    76,388  0.127      9,734
---------------------------------------------------------------------
---------------------------------------------------------------------
TOTAL          8,068,080   0.242 1,952,590 3,317,195  0.246   818,925
---------------------------------------------------------------------


---------------------------------------------------------------------
JERRITT CANYON TOTAL MINERAL RESOURCES - DECEMBER 2002
---------------------------------------------------------------------
---------------------------------------------------------------------
TOTAL          6,977,754   0.263 1,837,685 3,867,388  0.268 1,034,652
---------------------------------------------------------------------


---------------------------------------------------------------------
JERRITT CANYON TOTAL PROVEN AND PROBABLE RESERVES - JUNE 2003
 (Included in Resources)
---------------------------------------------------------------------
Mine                      PROVEN                     PROBABLE
               ------------------------------------------------------
                    Tons   Oz/St   Cont'd      Tons   Oz/St    Cont'd
                                       Oz                          Oz
---------------------------------------------------------------------
Murray           147,624   0.334   49,281   206,553   0.266    54,849
---------------------------------------------------------------------
MCE               16,394   0.401    6,570    20,511   0.358     7,339
---------------------------------------------------------------------
SSX              255,162   0.356   90,931   558,987   0.265   148,321
---------------------------------------------------------------------
Smith             93,672   0.412   38,585   141,552   0.271    38,351
---------------------------------------------------------------------
Stockpiles        48,999   0.121    5,927 1,409,721   0.060    84,014
---------------------------------------------------------------------
---------------------------------------------------------------------
TOTAL            561,851   0.340  191,294 2,337,324   0.142   332,874
---------------------------------------------------------------------


---------------------------------------------------------------------
JERRITT CANYON TOTAL PROVEN AND PROBABLE RESERVES - DECEMBER 2002
 (Included in Resources)
---------------------------------------------------------------------
---------------------------------------------------------------------
TOTAL            668,635   0.375  250,474 1,794,885   0.184   330,439
---------------------------------------------------------------------


---------------------------------------------------------------------
JERRITT CANYON TOTAL PROVEN AND PROBABLE RESERVES - JUNE 2003
 (Included in Resources)
---------------------------------------------------------------------
Mine                                        TOTAL PROVEN AND PROBABLE
                                          ---------------------------
                                               Tons   Oz/St    Cont'd
                                                                   Oz
---------------------------------------------------------------------
Murray                                      354,177   0.294   104,130
---------------------------------------------------------------------
MCE                                          36,905   0.377    13,909
---------------------------------------------------------------------
SSX                                         814,149   0.294   239,252
---------------------------------------------------------------------
Smith                                       235,224   0.327    76,936
---------------------------------------------------------------------
Stockpiles                                1,458,720   0.062    89,941
---------------------------------------------------------------------
---------------------------------------------------------------------
TOTAL                                     2,899,175   0.181   524,168
---------------------------------------------------------------------


---------------------------------------------------------------------
JERRITT CANYON TOTAL PROVEN AND PROBABLE RESERVES - DECEMBER 2002
 (Included in Resources)
---------------------------------------------------------------------
---------------------------------------------------------------------
TOTAL                                     2,463,520   0.236   580,913
---------------------------------------------------------------------



The TSX TSX Toronto Stock Exchange (TSE before April, 2002)
TSX Transfer from Stack Pointer to Index
TSX True Space Extension
 has neither reviewed nor accepts responsibility for the adequacy or accuracy of this release.
COPYRIGHT 2003 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2003, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Date:Sep 19, 2003
Words:1263
Previous Article:Schaeffer's Street Chatter Features General Electric, Palm, and Walt Disney.
Next Article:Hibbett Sporting Goods to Broadcast Investor Presentation Live on the Internet.



Related Articles
Queenstake Accelerates Jerritt Canyon Exploration.
Queenstake Resources Ltd.: Jerritt Canyon Third Quarter Production and September Exploration Results.
Queenstake's Jerritt Canyon Mine Yields More High Grade Drill Results.
Queenstake Reports Improved Production in Second Quarter.
Queenstake Reports 2004 Production and Presents Plans for 2005.
Queenstake Reserves and Resources Continue to Increase.
Queenstake Appoints Chief Financial Officer.
Queenstake First Quarter Results and Update on 2005 Guidance.
Queenstake to Hold First Quarter Results Conference Call and Audio Webcast on Thursday, May 19, 2005 at 11:00 am EDT.
Queenstake Drills High Grade Mineralization; Potential to Extend Mine Life at Smith Mine.

Terms of use | Copyright © 2009 Farlex, Inc. | Feedback | For webmasters | Submit articles