Progress of Sinopec Qingdao refining project.The installation of steel structures in the hydrogen preparation unit of Qingdao Refinery undertaken by the Tenth Construction Company of Sinopec was started on March 22nd, 2007 in Qingdao, Shandong province. According to according to prep. 1. As stated or indicated by; on the authority of: according to historians. 2. In keeping with: according to instructions. 3. the overall project schedule, the installation of framework steel structures, water/gas circulation system, PSA (Professional Services Automation) An information system designed to organize, track and manage all opportunities, work, resources, costs, revenues and invoices to improve the productivity and efficiency of the workforce. system, reactor Reactor (electricity) A device for introducing an inductive reactance into a circuit. Inductive reactance x is a function of the product of frequency f and inductance L; thus, x = 2πfL. , waste-heat boiler, process pipeline and compressor compressor, machine that decreases the volume of air or other gas by the application of pressure. Compressor types range from the simple hand pump and the piston-equipped compressor used to inflate tires to machines that use a rotating, bladed element to achieve will be conducted in an alternative way. The whole unit is planned to have intermediate handing over on December 25th, 2007. The civil work of the unit is already basically completed. |
|
||||||||||||||||

Printer friendly
Cite/link
Email
Feedback
Reader Opinion