Printer Friendly
The Free Library
4,719,285 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

Programming for mixed-vendor lines: intelligent, centralized machine part data management cuts human error.


Creating part data libraries for placement machines is a daunting daunt  
tr.v. daunt·ed, daunt·ing, daunts
To abate the courage of; discourage. See Synonyms at dismay.



[Middle English daunten, from Old French danter, from Latin
 task that can be time-consuming, error-prone and labor intensive Labor Intensive

A process or industry that requires large amounts of human effort to produce goods.

Notes:
A good example is the hospitality industry (hotels, restaurants, etc), they are considered to be very people-oriented.
See also: Capital Intensive, Trading Dollars
. Coupled with a multi-vendor line, in which each machine is programmed by different software (each with its own part data definition), the result is a costly and tedious process.

[TEXT NOT REPRODUCIBLE IN ASCII ASCII or American Standard Code for Information Interchange, a set of codes used to represent letters, numbers, a few symbols, and control characters. Originally designed for teletype operations, it has found wide application in computers. ]

Assembly machines require certain parameters to handle parts. They include a geometric representation of the part and handling instructions, some of which may be derived from the geometry. Such information currently comes from data sheets or physical measurements. The manual definition process is tedious, with no checks to ensure accuracy. Imagine an SMT (1) (Surface Mount Technology) See surface mount.

(2) (Station ManagemenT) An FDDI network management protocol that provides direct management. Only one node requires the software.

SMT - Station Management
 programmer breaking apart a single lead of a $300, 144-lead QFP (Quad FlatPack) A square, surface mount chip package that has leads on all four sides and comes in several varieties. PQFP (Plastic QFP) may refer to all of the following QFP types. All quad flatpacks use gull-wing leads, except for the CQFP, which stick straight out.  IC to measure its width with a caliper caliper

Instrument that consists of two adjustable legs or jaws for measuring the dimensions of material parts. Spring calipers have an adjusting screw and nut; firm-joint calipers use friction at the joint to hold the legs unmoving.
 (Vernier vernier (vûr`nēr), auxiliary scale, either straight or an arc of a circle, designed to slide along a fixed scale. Its unit divisions, usually smaller than those on the fixed scale, permit a far more precise reading. ), because the lead couldn't be measured in situ In place. When something is "in situ," it is in its original location. . In addition to being a waste of money, the measurement is probably inaccurate. Or picture an expensive SMT line left idle for 15 or 30 minutes because a part cannot be placed and part data need to be reprogrammed.

Machine part data consist of a geometric description of a component (length, width, number of leads, etc.) and various handling parameters (nozzle An orifice in an inkjet print head through which ink is sprayed onto the paper. Print heads with six thousand or more nozzles are common in today's printers.
Nozzle 
, camera, lighting, etc.). Manual entry of geometric data involves slow and inaccurate measurement methods and numerous searches of part data sheets. Automatic generation of machine language geometry fields from the libraries is fast, accurate and efficient.

To understand the nature of manual part handling data definition, consider: One of the handling parameters for parts is the nozzle size most appropriate to pick it up. With manual definition, operators memorize mem·o·rize  
tr.v. mem·o·rized, mem·o·riz·ing, mem·o·riz·es
1. To commit to memory; learn by heart.

2. Computer Science To store in memory:
 the table of conversions of package size to nozzle. Acquiring this knowledge is a bottleneck A lessening of throughput. It often refers to networks that are overloaded, which is caused by the inability of the hardware and transmission lines to support the traffic. It can also refer to a mismatch inside the computer where slower-speed peripheral buses and devices prevent the CPU  in their training and the source of human error, resulting in wrong picks and placements. Conversely, an automatic process based on electronic libraries applies a formula to calculate nozzle size automatically and repeatably.

Libraries containing accurate geometric descriptions for most parts in use today are available. Specific machine format geometry can be derived from these descriptions. Other parameters can be deduced using rules. Part data creation becomes quick, accurate, reliable and automatic. Automatically created rotation orientation standardized part data improves and speeds up NPI NPI National Provider Identifier, see there  processes. Adding virtual prototyping streamlines the process so that new product setup no longer requires skilled labor, eliminating loss of machine time or material (Figure 1).

Virtual prototyping removes the need for physical machine program verification onto double-sided sticky tape, which is costly in terms of line production time and scrap. Virtual prototyping is a programmatic pro·gram·mat·ic  
adj.
1. Of, relating to, or having a program.

2. Following an overall plan or schedule: a step-by-step, programmatic approach to problem solving.

3.
 method displaying a simulated populated pop·u·late  
tr.v. pop·u·lat·ed, pop·u·lat·ing, pop·u·lates
1. To supply with inhabitants, as by colonization; people.

2.
 board using the geometry and rotation of the machine part library. The simulation uses actual machine part data and machine programs to verify the accuracy of the data without using actual boards, parts or lines.

Libraries alone cannot do the trick. There must also be tools that use libraries. The most important is a common programming platform for all machines on the shop floor. Assemblers This is a list of assemblers. Hundreds of assemblers have been written; some notable examples are:
  • ASEM-51 - for the Intel MCS-51 family of microcontrollers; runs on DOS, Win32, and Linux.
 have come to rely upon a heterogeneous mix of machines, yet most suppliers' programming solutions fall apart in a multi-vendor line or factory. Independent software providers create software solutions capable of programming a heterogeneous line using similar tools and a common look and feel. These tools not only use part libraries from all vendors and machines, but also reduce operation costs through better line balancing, easier operator training and additional capabilities (such as reduction of feeder setup time through calculated "grouping" (1) of products in high mix environments).

Physical part libraries are also used in a variety of tasks beyond creation and management of placement equipment parts data. Additional capabilities include:

* Analysis of BOMs and AVLs to eliminate erroneous alternate parts, saving hours of line downtime The time during which a computer is not functioning due to hardware, operating system or application program failure.  if an error goes undetected until production begins.

* Automatic creation of AOI AOI Area Of Interest
AOI Automated Optical Inspection
AOI Art of Illusion (3D modeling software)
AOI Associated Oregon Industries
AOI Angle Of Incidence
AOI Age of Innocence (David Hamilton book, also a band) 
 machine part libraries that can prevent expensive machine downtime.

* Faster and more accurate fixture design.

* DfA and DfT analysis to detect part placement, solderability and testability problems long before they cause harm on the shop floor or, worse still, in a delivered product.

* Creation of better shop floor documentation.

[FIGURE 1 OMITTED]

The lack of central, multi-vendor, library-based parts data control systems causes such part data to be managed on the factory floor sporadically at line computers or the individual machine. This chaotic approach of manual data creation and maintenance is labor intensive and often inaccurate.

The absence of centrally managed part data leads to multiple, differing representations of the same parts on individual machines. This can lead to inconsistency, out-of-control situations and loss of time due to multiple machine-learn cycles for the same part.

Indeed, it is very common to find the same shape in a machine library in many different guises; e.g., 0805, 0805-1, 0805Fred, 0805_1. Technicians resort to redefining parts because they lack the tools to look for existing definitions. Not only is time lost to machine setup, but machines are underutilized because of less-than-optimal operational speed setting in the parts data.

Further inefficiencies arise in the following areas:

* Technician time is lost searching for data sheets and measuring parts using a Vernier.

* When a new product is run it can take in excess of 3 hours (depending upon the quantity of new shapes) to program and teach the shapes. This is not only costly in manpower, but the line is unproductive during this period.

* It is time consuming to move a program from one manufacturing line to another as a result of inconsistencies in the management of part data on different lines. Long delays result as the operator ensures that the program references the correct parts on the new line.

The NPI process to get the first board from the line is far too long, given these inefficient practices. With a more efficient NPI process, prototype boards are assembled quickly and time-to-market is reduced.

Translating the list of problematic issues into numbers helps to calculate return on investment for the implementation of intelligent part libraries. Assuming:

1. An average line generates $50 million in revenue a year. Its hourly profit is $250, assuming a 4% margin.

2. ROI (Return On Investment) The monetary benefits derived from having spent money on developing or revising a system. In the IT world, there are more ways to compute ROI than Carter has liver pills (and for those of you who never heard of that expression, it means a lot).  will be calculated for a 10-line plant.

3. Thirty new jobs are introduced every week.

4. NPI setup time on the line is reduced by 50%, from 5 hours to 2.5 hours.

The savings for reducing NPI time alone is

30 (jobs per week) * 50 (weeks per year) * 2.5 hours per job * $250 per hour = $937,500 per year.

Automatic generation of accurate and reliable part data from intelligent part libraries, along with a common multi-vendor programming platform, provides a watershed solution. Operators need only be trained on one tool. Full realization of line balancing capabilities is possible as the task of defining part data for all applicable machines is no longer a bottleneck. Streamlined pre-production engineering becomes a reality. Further savings can be realized through improved operational efficiencies and line throughput.

Reference

(1.) "Grouping" of products is a process by which a significant number of different products that need to be assembled in small quantities in a given period are separated to groups sharing a common feeder setup. This process improves line uptime significantly by eliminating the need to change the feeder setup on a per product basis.

Bini Elhanan is director of technology at Valor valor

a rodenticide no longer marketed because of toxicity in horses causing dehydration, abdominal pain, hindlimb weakness, inappetence, fishy smell in urine. Called also N-3-pyridyl methyl N1-p-nitrophenyl urea.
 Computerized Systems (valor.com); bini.elhanan@valor.com.
COPYRIGHT 2004 UP Media Group, Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2004, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Title Annotation:Parts Management
Author:Elhanan, Bini
Publication:Circuits Assembly
Date:Dec 1, 2004
Words:1218
Previous Article:Enabling quick response manufacturing: still using your pick-and-place for debugging? Tools for surviving a zero-forecast world.(Process Control)
Next Article:Spray fluxer.(Product SPOTLIGHT)



Related Articles
Computers > Toys > Tools > Systems.
Manufacturing control: from quotation to cash.(High-Tech How-To)
PCs link offices to saws. (improvements in panel sizing with increased use of personal computers)(Digital Woodworking)
In search of Artificial Intelligence. (Produce).(Column)
Implementing the UID policy: the CH-47 approach to parts marking.(Lessons Learned)
Keeping up-to-date on panel saw technology: improvements in saws and software enable faster, smoother more efficient cuts.(Increasing Productivity)
Asset management reduces repair costs and improves warranty tracking in tire manufacturing.(Process Machinery)
Enabling quick response manufacturing: still using your pick-and-place for debugging? Tools for surviving a zero-forecast world.(Process Control)
"Value propositions" for pulp and paper it solution providers.(INFORMATION TECHNOLOGY)
Permanent bar codes take guesswork out of part tracing.(new bar codes from PermaCode)

Terms of use | Copyright © 2009 Farlex, Inc. | Feedback | For webmasters | Submit articles