Precious Metals recovery program nears completion; Drill program to begin this month.TORONTO--(BUSINESS WIRE)--March 11, 1997--International Precious Metals Precious Metals Valuable metals such as gold, iridium, palladium, platinum, and silver. Notes: Investing in precious metals can be done either by purchasing the physical asset, or by purchasing futures contracts for the particular metal. Corporation (IPM (1) (Impressions Per Minute) Generally refers to document scanners that scan both sides of the page at the same time. Thus, a scanner that scans at 100 ppm (pages per minute) can provide 200 ipm. See ppm and document scanner. ) announced today that the independent research facility conducting its precious metals recovery program has reported that assays from bulk sample sizes of 250 kilograms show no degradation of gold recovery. The program was initiated on December 19, 1996 to test BRX BRX Bronx BRX Business Referral Exchange BRX Brevis radix (gene of Arabidopsis thaliana) BRX Big Red X (game) BRX Bronze Cross (lifesaving) BRX Browsing Index (Black Rock Extended) samples from 150 grams to bulk samples of 500 kilograms utilizing leach processes. The research facilility expects to complete its pilot plant testing of the 500 kilogram kilogram, abbr. kg, fundamental unit of mass in the metric system, defined as the mass of the International Prototype Kilogram, a platinum-iridium cylinder kept at Sèvres, France, near Paris. samples by March 14, 1997. To date, all of IPM's research work and laboratory analysis has been conducted independently. Based on the data generated from the pilot plant program, on March 17, 1997, IPM will turn over to Behre Dolbear & Co., Inc. the recovery process procedures for their independent review/evaluation that IPM's leaching leaching, method of extraction in which a solvent is passed through a mixture to remove some desired substance from it. A simple example is the passage of boiling water through ground coffee to dissolve and carry out the chemicals necessary for producing the beverage. procedures are an effective recovery process. IPM also announced that on March 17, 1997 it will commence a 28-hole drill program comprised of 2,600 meters of reverse circulation drilling to bedrock. Spacing will be at 1,000-meter centers surrounding the original 1-sq/km drill grid. The objective of this drill program is to test mineralization Mineralization The process by which the body uses minerals to build bone structure. Mentioned in: Rickets mineralization, n the bioprecipitation of an inorganic substance. in the 8-sq/kms surrounding the grid in order to help further define the extent of the precious metals anomaly. -0- Issued and Outstanding Capital: 16,759,407 CONTACT: Operations Office: 4625 S. Ash Ave., Suite J-1 Tempe, AZ 85282 1 800 482 6429 www.ipmcf.com mag@ipmcf.com or Registered Office: 390 Bay Street, Suite 502 Toronto, Ontario M5H 2Y2 416 368 1489 |
|
||||||||||||||

Printer friendly
Cite/link
Email
Feedback
Reader Opinion