Performance-Based Logistics--barriers and enablers to effective implementation.The Department of Defense is implementing Performance-Based Logistics (PBL PBL Problem-Based Learning PBL Phi Beta Lambda PBL Performance Based Logistics PBL Planetary Boundary Layer PBL Publishing and Broadcasting Limited (Australia) PBL Philippine Basketball League PBL Peripheral Blood Leukocyte ) in both new acquisition programs and legacy programs. Each of the Services is executing PBL policy at the system, subsystem A unit or device that is part of a larger system. For example, a disk subsystem is a part of a computer system. A bus is a part of the computer. A subsystem usually refers to hardware, but it may be used to describe software. , and component level. The Services are also working in conjunction with each other to implement PBL on joint programs. This study identifies the most common barriers and enablers as the Services go forward with PBL implementation, determines if there are relationships between these barriers and enablers, and also evaluates the success of PBL implementation. ********** Traditionally, support for weapon systems in the Department of Defense (DoD) centered around ten or eleven logistics elements, split between acquisitionrelated activities at the front end of the life cycle- and sustainment-related activities at the back end. Metrics metrics Managed care A popular term for standards by which the quality of a product, service, or outcome of a particular form of Pt management is evaluated. See TQM. focused on the logistics elements themselves and internal processes often having little direct relationship to warfighter requirements. The shift toward Integrated Logistics Support A composite of all the support considerations necessary to assure the effective and economical support of a system for its life cycle. It is an integral part of all other aspects of system acquisition and operation. Also called ILS. attempted to wrap together the distinct logistics elements into a coordinated approach, but there was still the disjointed acquisition versus sustainment-support issue and the lack of a linkage linkage In mechanical engineering, a system of solid, usually metallic, links (bars) connected to two or more other links by pin joints (hinges), sliding joints, or ball-and-socket joints to form a closed chain or a series of closed chains. between supportability measures and warfighter needs. In addition, choice of support providers was often an all or nothing proposition; either entirely organic (DoD) or entirely commercial (CLS (Common Language Specification) The structure and syntax of .NET and CLI programming languages. See .NET. or contractor logistics support). The advent of Total Life Cycle Systems Management (TLCSM TLCSM Total Life Cycle Systems Management (US DoD) ) and Performance-based Logistics (PBL) addressed all of these issues. The TLCSM mandated a new focus by program managers toward the entire life cycle, firmly linking acquisition and sustainment activities into an integrated process. To measure success, PBL required that supportability metrics be directly related to performance outcomes for the warfighter, and PBL also offered a choice of organic and commercial support providers for picking the right combination in achieving best value to the program. A succinct suc·cinct adj. suc·cinct·er, suc·cinct·est 1. Characterized by clear, precise expression in few words; concise and terse: a succinct reply; a succinct style. 2. definition quoted from a recent report by the Center for the Management of Science and Technology at the University of Alabama The University of Alabama (also known as Alabama, UA or colloquially as 'Bama) is a public coeducational university located in Tuscaloosa, Alabama, USA. Founded in 1831, UA is the flagship campus of the University of Alabama System. in Huntsville defines PBL as, "an integrated acquisition and sustainment strategy for enhancing weapon system capability and readiness, where the contractual mechanisms will include long-term relationships and appropriately structured incentives with service providers, both organic and non-organic, to support the end user's (warfighter's) objectives" (Berkowitz, et al., 2003, p. 5). Implementation of PBL was mandated in September, 2001 in the Quadrennial Defense Review
The Quadrennial Defense Review (QDR) is a report by the United States Department of Defense that analyzes strategic objectives and potential military (QDR QDR Quadrennial Defense Review (US DoD) QDR Quad Data Rate (Memory Technology) QDR Quality Deficiency Report QDR Quality, Durability and Reliability (Toyota Motor Company) ), and initial guidance was promulgated prom·ul·gate tr.v. prom·ul·gat·ed, prom·ul·gat·ing, prom·ul·gates 1. To make known (a decree, for example) by public declaration; announce officially. See Synonyms at announce. 2. by the Office of Secretary of Defense (OSD (1) (On-Screen Display) An on-screen control panel for adjusting monitors and TVs. The OSD is used for contrast, brightness, horizontal and vertical positioning and other monitor adjustments. ) (Aldridge, 2002). The OSD issued a Product Support Guide that provided a strategy for executing PBL (Morales, 2001). Subsequently, each of the Services provided implementation guidance to their programs (Bolton, 2002; Schneider, 2002). In accordance Accordance is Bible Study Software for Macintosh developed by OakTree Software, Inc.[] As well as a standalone program, it is the base software packaged by Zondervan in their Bible Study suites for Macintosh. with the FY03 Defense Policy Guidance, the scope of the programs to be considered for PBL implementation included all new weapon systems and all Acquisition Category (ACAT ACAT See: Automated Customer Account Transfer ) I and II fielded systems (Young, 2003). The importance of sustainment in the program life cycle and in implementing PBL was recognized. To ensure the requisite priority on sustainment issues within program offices and to ease the PBL implementation efforts, the concept of TLCSM was promulgated (Aldridge, 2003). Total Life Cycle Systems Management emphasizes an early focus on sustainment in the program management office, making the program manager responsible for all activities associated with the acquisition, development, production, fielding, sustainment, and disposal of a weapon system across its life cycle. This was a significant paradigm shift A dramatic change in methodology or practice. It often refers to a major change in thinking and planning, which ultimately changes the way projects are implemented. For example, accessing applications and data from the Web instead of from local servers is a paradigm shift. See paradigm. from traditional program management focus on the early phases (acquisition, development, fielding) of the life cycle. To support the decision-making process in selecting organic and commercial support providers, OSD promulgated guidelines guidelines, n.pl a set of standards, criteria, or specifications to be used or followed in the performance of certain tasks. for conducting a Business Case Analysis (BCA BCA Business Case Analysis BCA Building Code of Australia BCA Boeing Commercial Airplanes BCA Board of Contract Appeals BCA Boston Center for the Arts BCA Billiard Congress of America BCA Bureau of Criminal Apprehension BCA Breast Cancer Action ) (Wynne, 2004a). In addressing the performance metrics' relationship to desired outcomes, OSD provided some common examples such as operational availability and logistics footprint (Wynne, 2004b). The Services began encountering problems in implementing PBL, both for new and existing programs. There were existing cultural and structural barriers that inhibited effective implementation. On the other hand, there were a number of enablers that were being utilized for more effective implementation. These barriers and enablers were the subject of numerous program briefings and reports presented at a number of conferences and road shows over the last couple of years. This research study intends to identify the most frequently impacting barriers and enablers to effective PBL implementation within DoD, how they influence PBL implementation, and recommend strategy/actions that will facilitate more effective implementation for new and legacy programs. LITERATURE REVIEW An extensive search was conducted on the Internet to identify current PBL policy and implementation guidelines. A review of OSD and Service Web sites, as well as some industry Web sites, was completed. Briefings from a number of conferences were obtained, showing the status of several programs undergoing PBL implementation. Also, there were ongoing discussions and correspondence regarding PBL implementation and problems encountered with a number of practitioners within the Services. A review was conducted of existing DAU DAU - /dow/ [German Fidonet] D"ummster Anzunehmender User. A German acronym for stupidest imaginable user. From the engineering-slang GAU for Gr"osster Anzunehmender Unfall (worst foreseeable accident), especially of a LNG tank farm plant or something with similarly disastrous curriculum in Performance-Based Acquisition and Performance-Based Logistics. Through participation in PBL conferences and road shows, there were discussions with key policymakers and implementers. Based on the preliminary literature survey and feedback from practitioners, it was apparent that there were numerous instances of misunderstanding of the PBL concept, resistance to its initiatives, and problems in implementation. RESEARCH QUESTIONS AND HYPOTHESES The following questions were posed to frame the research effort: 1. What are the barriers and how do they influence PBL implementation? 2. What are the enablers and how do they influence PBL implementation? 3. What strategy/actions would lead to more successful PBL implementation? In reference to question 1, seven key barriers were identified through the efforts of the Literature Review. These barriers were: 1. Funding restrictions/inflexibility (e.g., Working Capital Fund, various appropriations/transfer and expiring funds rules, limited Program Manager [PM] control over Operation and Maintenance [O&M]). 2. Statutory/regulatory requirements (e.g., Title 10, service policies). 3. Old paradigms/culture (e.g., organic versus commercial, parts management versus performance management, minimize contractors on the battlefield). 4. Existing infrastructure/bureaucracy (e.g., PM office structure, stovepiping, short PM tours). 5. Technical data rights issues. 6. Lack of PBL awareness/training. 7. Inability to incentivize in·cen·tiv·ize tr.v. in·cen·tiv·ized, in·cen·tiv·iz·ing, in·cen·tiv·iz·es To offer incentives or an incentive to; motivate: organic providers. In reference to question 2, seven key enablers were identified through the efforts of the Literature Review. These were: 1. Supply Chain Management (e.g., end-to-end customer support, enterprise integration). 2. Strategic alliances/partnerships (e.g., depot partnering, joint ventures). 3. Performance-based contracting (e.g., incentivizing performance). 4. Performance-based metrics. 5. Total Life Cycle Systems Management (TLCSM) perspective. 6. Adoption of Commercial Off-the-Shelf Commercial off-the-shelf (COTS) is a term for software or hardware, generally technology or computer products, that are ready-made and available for sale, lease, or license to the general public. (COTS (Commercial Off-The-Shelf) Refers to ready-made merchandise that is available for sale. See MOTS. (software) COTS - commercial off-the-shelf. See commercial software. )/Best Commercial Practices. 7. Reduction in Total Ownership Cost (RTOC RTOC Rockstar Taste of Chaos RTOC Rockstar Taste of Chaos (band) RTOC Real-Time Operations Center RTOC Reduction in Total Ownership Cost RTOC Rear Tactical Operations Center RTOC Renault Turbo Owners Club ) initiative. Based on the research questions, six hypotheses were developed: 1. There is an indirect relationship between the number of barriers and the success of PBL implementation. 2. There is a direct relationship between the mitigation of barriers and the success of PBL implementation. 3. There is an indirect relationship between the influence of barriers (after mitigation) and the success of PBL implementation. 4. There is a direct relationship between the number of enablers and the success of PBL implementation. 5. There is a direct relationship between the enhancement of enablers and the success of PBL implementation. 6. There is a direct relationship between the influence of enablers (after enhancement) and the success of PBL implementation. The research model in Figure 1 graphically displays these hypotheses and associated variables. RESEARCH METHODOLOGY This research study was primarily qualitative in the measurement of variables. Correlational research was conducted using surveys to obtain primary data. Surveys were selected as an effective method to obtain data from program offices where they are implementing PBL in their programs. The statistical test used for all six correlation hypotheses was the Pearson product-moment (at least one of two variables in each hypothesis is ratio or interval type data). Due to the small size of the sample and the fact that the dependent variable consisted of ordinal (mathematics) ordinal - An isomorphism class of well-ordered sets. type date, the Spearman spear·man n. A man, especially a soldier, armed with a spear. rank-order r test was also conducted on all six hypotheses. Results were then compared with the results of the Pearson product-moment test. No significant differences were noted. RESEARCH SURVEY A data survey was created on the Web and instructions sent out to key PBL points of contact (POC (Proof Of Concept) See PoC exploit. POC - Point Of Contact ) within each of the Services. The Service POC's instructed program managers that had undergone PBL implementation within their respective Service to fill out the data survey. There were a total of 26 program managers that responded to the survey. Of the 26 programs, 10 were Joint, 9 were Army, and 7 were Navy/Marine Corps. No Air Force specific programs responded. Both new and legacy programs participated. Of the 26 programs, 11 were new and 15 were legacy. Another distinguishing factor was the scope of the PBL; implemented at the system, subsystem, or component level. Of the 26 programs, 11 were system level, 9 at subsystem level, 4 at component level, and 2 did not distinguish. A final distinguishing factor was the impact of PBL on logistics elements. Three primary logistics elements were chosen: supply, maintenance, and transportation. Of the 26 programs, 13 impacted all three elements, 4 impacted supply and maintenance, 1 impacted supply and transportation, 2 impacted only supply, 3 impacted only maintenance, 1 impacted only transportation, and 2 did not distinguish. Figure 2 provides a summary chart. RESEARCH FINDINGS Of the 26 programs surveyed, 17 identified funding as a barrier; 13 identified statutory/regulatory, culture, and lack of PBL training as barriers; 12 identified existing infrastructure as a barrier; 11 identified technical data rights issues as a barrier; and 6 identified lack of organic depot incentives as a barrier. For the same 26 programs surveyed, 16 identified performance metrics Performance metrics are measures of an organizations activities and performance. Performance metrics should support a range of stakeholder needs from customers, shareholders to employees [1]. as an enabler; 14 identified performancebased contracting, TLCSM, and COTS/best commercial practices as enablers; 11 identified partnering as an enabler; and 8 identified supply chain management and RTOC as enablers. Summary charts of the results are shown in Figures 3 and 4. Of the 6 hypotheses tested, the data analysis supported 3 hypotheses at the 0.10 significance level using both the Pearson product-moment test and the Spearman rank-order r test. Of the 3 supported hypotheses, 2 were supported at the 0.05 significance level using the Pearson product-moment test and 1 was supported at the 0.05 significance level using the Spearman rank-order r test. The 3 supported hypotheses were: 1. There is a direct relationship between the number of enablers and the success of PBL implementation. 2. There is a direct relationship between the enhancement of enablers and the success of PBL implementation. 3. There is a direct relationship between the influence of enablers (after enhancement) and the success of PBL implementation. Of the 6 hypotheses tested, the data analysis did not provide sufficient support for 3 of the hypotheses. They are as follows: 1. There is an indirect relationship between the number of barriers and the success of PBL implementation. 2. There is a direct relationship between the mitigation of barriers and the success of PBL implementation. 3. There is an indirect relationship between the influence of barriers (after mitigation) and the success of PBL implementation. A summary of the results is shown in Table 1. CONCLUSIONS Based on the results of the survey and data analysis, there appears to be some relationship between the identified enablers and the success of PBL implementation. The most frequent enablers that appeared to influence success were performance metrics, performance-based contracting, TLCSM, and COTS/Best Commercial Practices. This is in alignment with the level of emphasis in these areas from both a policy and training perspective within DoD. Those enablers influencing fewer programs were supply chain management and RTOC. Although certainly important from a broad PBL perspective, it may be more challenging for respondents In the context of marketing research, a representative sample drawn from a larger population of people from whom information is collected and used to develop or confirm marketing strategy. to link these concepts to PBL execution at the program office level. As in most research studies, all the hypotheses may not be supported from the data analysis. In this case, the hypotheses dealing with barriers to PBL implementation and their influence on success were not supported at the requisite significance level. This may be due to the small sample size (26) and/or the inability to understand the true impacts of barriers on PBL execution. It was apparent in the literature survey that a number of activities view barriers as a significant issue in their implementation efforts and that policymakers are coming out with initiatives to mitigate some of those barriers. What the research study did show was that funding seems to be the most frequently encountered barrier followed by statutory/regulatory, culture, and lack of PBL training. The least encountered barrier was lack of organic depot incentives, which may be partly due to the use of commercial depots by some of the programs surveyed. SUMMARY/RECOMMENDATIONS Based on the research study findings, policymakers in DoD should continue to focus on initiatives that encourage the use of enablers such as performance metrics, performance-based contracting, and use of COTS/Best Commercial Practices. They should look at ways to more closely link concepts such as Supply Chain Management and RTOC to program execution so that implementers of PBL realize the practical application of those concepts. Policymakers should increase their efforts to mitigate barriers in the funding, statutory/regulatory, and training areas. Replacement of the Planning, Programming, and Budgeting System (PPBS PPBS Planning, Programming, & Budgeting System (US DoD) PPBS Program Planning and Budgeting System PPBS Postprandial Blood Sugar ) with Planning, Programming, Budgeting, and Execution (PPBE PPBE Planning Programming Budgeting and Execution ) and relaxation of regulatory requirements Regulatory requirements are part of the process of drug discovery and drug development. Regulatory requirements describe what is necessary for a new drug to be approved for marketing in any particular country. (DoD 5000 series/Defense Acquisition Guidebook) are starting to have some impact, along with a new focus on Performance-Based Acquisition training at the Defense Acquisition University through classroom, online, and continuous learning activities. These efforts need to continue and be reinforced by service policy and training efforts. At the program office level, logisticians need to work in close concert with the program manager and other acquisition disciplines to address performance issues and ensure metrics are linked closely with warfighter outcomes. Contracting officers A US military officer or civilian employee who has a valid appointment as a contracting officer under the provisions of the Federal Acquisition Regulation. The individual has the authority to enter into and administer contracts and determinations as well as findings about such contracts. need to work closely with logisticians when drafting contracting strategy and building incentives into contracts. Financial managers and logisticians need to jointly develop life cycle cost estimates and come up with innovative approaches within the funding constraints CONSTRAINTS - A language for solving constraints using value inference. ["CONSTRAINTS: A Language for Expressing Almost-Hierarchical Descriptions", G.J. Sussman et al, Artif Intell 14(1):1-39 (Aug 1980)]. and statutory guidelines to reduce total ownership cost. Logisticians need to develop objective business case analyses to support smart decisions on the fight mix of support providers to optimize optimize - optimisation warfighter performance outcomes. In summary, PBL along with TLCSM have required a paradigm shift in how we view program life cycles and supportability. There are a lot of challenges or barriers that inhibit our ability to be effective. There are also a lot of enablers that increase our ability to be successful in implementing PBL. If policymakers working in concert with program offices can continue to mitigate the barriers and enhance the enablers, we can offer a better product to the warfighter that will meet or exceed their performance requirements while providing long term savings to the program. Only in this way can we both meet the increasing challenges of the new threat environment and stay within the tightening budget constraints A Budget Constraint represents the combinations of goods and services that a consumer can purchase given current prices and his income. Consumer theory uses the concepts of a budget constraint and a preference ordering to analyze consumer choices. of today and in the future.
TABLE 1.
RESULTS SUMMARY
Hypothesis Pearson Significance Spearman
Correlation Level Correlation
Coefficient (Pearson) Coefficient
Indirect relationship -0.102 0.68 -0.154
between number of
barriers and success
of Performance-Based
Logistics (PBL).
Direct relationship -0.162 0.51 -0.130
between mitigation of
barriers and success
of PBL.
Indirect relationship -0.192 0.43 -0.227
between influence of
barriers (after
mitigation) and
success of PBL.
Direct relationship 0.414 0.08 -0.443
between number of
enablers and success
of PBL.
Direct relationship 0.540 0.02 0.456
between enhancement
of enablers and
success of PBL.
Direct relationship 0.533 0.02 0.393
between influence of
enablers (after
enhancement) and
success of PBL.
Hypothesis Significance
Level
(Spearman)
Indirect relationship 0.53
between number of
barriers and success
of Performance-Based
Logistics (PBL).
Direct relationship 0.60
between mitigation of
barriers and success
of PBL.
Indirect relationship 0.35
between influence of
barriers (after
mitigation) and
success of PBL.
Direct relationship 0.06
between number of
enablers and success
of PBL.
Direct relationship 0.05
between enhancement
of enablers and
success of PBL.
Direct relationship 0.10
between influence of
enablers (after
enhancement) and
success of PBL.
REFERENCES Aldridge, E. C. (2002, February 18). Performance-Based Logistics. Washington, DC: Under Secretary of Defense (Acquisition, Technology, and Logistics). Aldridge, E. C. (2003, March 7). Total life cycle systems management and performance-based logistics. Washington, DC: Under Secretary of Defense (Acquisition, Technology, and Logistics). Berkowitz, D., Gupta, J., Simpson, J., McWilliams, J., Delane, L., Brown, B., Cameron, D., & Sparks, T. (2003, December). Performance-Based Logistics. Huntsville, AL: Center for the Management of Science and Technology, University of Alabama, Huntsville. Bolton, C. M. (2002, April 1). Army implementation of Performance-Based Logistics (PBL). Washington, DC: Assistant Secretary of the Army (Acquisition, Logistics, and Technology). Morales, D. K. (2001, November 6). Product support guide. Washington, DC: Deputy Under Secretary of Defense (Logistics and Materiel Readiness The availability of materiel required by a military organization to support its wartime activities or contingencies, disaster relief (flood, earthquake, etc.), or other emergencies. ). Schneider, P. A. (2002, April 26). Department of the Navy Performance-Based Logistics (PBL) implementation plan. Washington, DC: Assistant Secretary of the Navy Assistant Secretary of the Navy (abbrev. "ASN") is the title given to certain senior officials in the U.S. Department of the Navy. They serve as chief assistants to the Secretary of the Navy (SECNAV). (Research, Development, and Acquisition). Wynne, M. W (2004a, January 23). Performance-Based Logistics (PBL)Business Case Analysis (BCA). Washington, DC: Under Secretary of Defense (Acquisition, Technology, and Logistics). Wynne, M. W. (2004b, August 16). Performance-Based Logistics: Purchasing using performance-based criteria. Washington, DC: Under Secretary of Defense (Acquisition, Technology, and Logistics). Young, J. J., Jr. (2003, January 27). Performance-Based Logistics (PBL) guidance document. Washington, DC: Assistant Secretary of the Navy (Research, Development, and Acquisition). AUTHOR BIOGRAPHY Dr. Hank hank n. 1. A coil or loop. 2. Nautical A ring on a stay attached to the head of a jib or staysail. 3. A looped bundle, as of yarn. DeVries is currently serving as the Associate Dean for Outreach and Performance Support at the Defense Acquisition University, West Region, San Diego San Diego (săn dēā`gō), city (1990 pop. 1,110,549), seat of San Diego co., S Calif., on San Diego Bay; inc. 1850. San Diego includes the unincorporated communities of La Jolla and Spring Valley. Coronado is across the bay. , CA. He is a Certified See certification. Professional Logistician lo·gis·tic also lo·gis·ti·cal adj. 1. Of or relating to symbolic logic. 2. Of or relating to logistics. [Medieval Latin logisticus, of calculation and has more than 26 years experience in acquisition and sustainment logistics. He earned a master of science degree in material logistics support management from the Naval Postgraduate School The Naval Postgraduate School is a graduate school operated by the United States Navy. Located in Monterey, California, it grants primarily master's degrees plus some doctoral degrees to its students, who are mostly active duty officers from U.S. and foreign military services. , and a doctor of business administration degree in strategic management from Alliant International University This article needs sources or references that appear in reliable, third-party publications. Alone, primary sources and sources affiliated with the subject of this article are not sufficient for an accurate encyclopedia article. . Dr. DeVries is a member of the Defense Acquisition Corps and is certified at DAWIA DAWIA Defense Acquisition Workforce Improvement Act of 1990 Level III in Acquisition Logistics and Program Management. In addition to his work as the Associate Dean, he also teaches acquisition management, logistics, and program management courses for the Defense Acquisition University. (E-mail address See Internet address. e-mail address - electronic mail address : hank.devries@dau.mil An Internet address domain name for a military agency. See Internet address. (networking) mil - The top-level domain for entities affiliated with US armed forces. ) |
|
||||||||||||||||||||

Printer friendly
Cite/link
Email
Feedback
Reader Opinion