Pacific Rim Mining Corp.: El Dorado Step-Out Drilling Yields New High Grade Intercepts.Business Editors VANCOUVER, British Columbia--(BUSINESS WIRE)--July 25, 2003 Pacific Rim Pacific Rim, term used to describe the nations bordering the Pacific Ocean and the island countries situated in it. In the post–World War II era, the Pacific Rim has become an increasingly important and interconnected economic region. is pleased to present the latest drill results from its El Dorado El Dorado, legendary country of South America El Dorado (ĕl`dərä`dō, –rā`–) [Span.,=the gilded man], legendary country of the Golden Man sought by adventurers in South America. gold project in El Salvador El Salvador (ĕl sälväthōr`), officially Republic of El Salvador, republic (2005 est. pop. 6,705,000), 8,260 sq mi (21,393 sq km), Central America. . The Company is extremely pleased with the results from its step-out drilling program on the Minita vein at El Dorado, which have expanded the dimensions of the Minita mineralization Mineralization The process by which the body uses minerals to build bone structure. Mentioned in: Rickets mineralization, n the bioprecipitation of an inorganic substance. chute. Highlights include 7.0 meters of 12.3 g/t gold in hole P03-251 and 4.4 meters of 10.09 g/t gold in hole P03-246. Results from the Company's La Calera La Calera may refer to:
The assay results from seven new step-out holes drilled on the Minita vein have been received. These holes were designed to delineate the limits of the Minita mineralization in preparation for an updated resource calculation Pacific Rim will commission in the coming weeks. The Minita vein system was mined in the mid-1900's and currently hosts an indicated resource of 799,200 tonnes with an average grade of 13.7 g/t gold and 97.9 g/t silver. This resource totals 352,000 ounces of gold and 2.5 million ounces of silver (see NI 43-101 Disclosure section) and does not take into account the results of Pacific Rim's on-going drill program. Hole P03-245 was designed to follow up on Pacific Rim's hole P02-206, which was drilled to the south of the Minita resource and returned 1.1 meters grading 55.5 g/t gold (see NR #02-10 dated August 2, 2002). Holes P03-246 through 251 were designed to test the area at the north end of the chute: above, down-rake and below its previously defined margins. A longitudinal section of the Minita vein resource area is available at http://www.pacrim-mining.com/i/maps/minita_long_sec-jul2403.gif. Table 1: El Dorado Program
--------------------------------------------------------------------
Hole Vein UTM Drill From To Inter- True Gold Silver
No. Tested North- hole (met- (met- sec- Width (g/t) (g/t)
ing/ azi- ers ers tion (met-
East- muth/ down down (met- ers)
ing dip hole) hole) ers)
(degr-
ees)
--------------------------------------------------------------------
P03 South 301376/ 090/
-245 Minita 534098 -60 221.45 225.05 3.60 1.80 9.49 -
--------------------------------------------------------------------
286.8 288 1.20 0.85 6.92 -
--------------------------------------------------------------------
P03 Deep 301656/ 090/
-246 Minita 533919 -67 398.05 404.95 6.90 4.44 10.09 -
--------------------------------------------------------------------
P03 Deep 301699/ 081/
-247 Minita 533917 -63 334.1 339.15 5.05 3.41 7.76 -
--------------------------------------------------------------------
P03 Deep 301760/ 089/
-248 Minita 533966 -70 306.2 307.35 1.15 0.66 6.38 -
--------------------------------------------------------------------
P03 North 301831/ 090/
-249 Minita 533959 -56 188.2 189.4 2.05 1.45 13.44 -
--------------------------------------------------------------------
P03 Deep 301514/ 090/
-250 Minita 534010 -71 No Significant Intercepts
--------------------------------------------------------------------
P03 Deep 301642/ 098/
-251 Minita 533964 -71 369.35 383.45 14.1 7.05 12.29 -
--------------------------------------------------------------------
The Minita high-grade chute rakes shallowly to the north and is open in that direction. Drill hole P03-247 and Pacific Rim's previously released hole P02-205 intersected high-grade gold (9.33 meters of 9.75 g/t gold, see NR#02-10), which adds roughly 75 meters to the length of the chute axis to the north. Holes P03-246 and 251 were drilled below the north end of the main chute axis. These holes intersected bonanza grade gold at elevations extending to 39 meters above sea level Meters Above Sea Level is a standard metric measurement of the elevation of a location in reference to mean sea level. Uses Meters above sea level is the standard measurement of the elevation or altitude of: See also: Axis main chute at an elevation of 250 meters above sea level. This hole adds 100 meters of strike length at this level. Pacific Rim's geologic mapping and surface sampling program has been completed in the North District of the El Dorado project. This program has identified many new veins with a cumulative strike length of 4 kilometers. Of particular interest is the extension of the southern end of the 3 km long San Matias Vein, where surface sampling indicates a broad area with higher-than-average gold values. Surface elevations in this anomalous area are roughly 500 meters above sea level; 200 meters above the top of the Productive Interval. Two north-northwest striking extensional veins have been identified within this anomalous area. An extensional fault An Extensional Fault is a fault that extends the pre-existing geological layering. In most cases such a fault is also a normal fault, but may be rotated to have a reverse fault geometry. hosts the Minita resource approximately 3.5 kilometers to the southeast. "This new drilling significantly expands the outer dimensions of the high-grade Minita chute, which remains open at depth," says Tom Shrake, CEO (1) (Chief Executive Officer) The highest individual in command of an organization. Typically the president of the company, the CEO reports to the Chairman of the Board. . "Minita is an exceptional deposit with an average width exceeding 3 meters in a structural regime that provides excellent ground conditions. Both of these factors will positively affect the economics. We will continue drilling until we have defined the outer boundaries of the deposit and then immediately commission a revised resource calculation. In the North District, we are keen to test these newly discovered, high-priority targets." NI 43-101 Disclosure Pacific Rim's exploration work on the El Dorado project is being supervised by William Gehlen a Certified Professional Geologist with the AIPG AIPG American Institute of Professional Geologists (No. 10626), an employee of Pacific Rim and a Qualified Person as defined in NI 43-101. Mr. Gehlen has verified that the drill results presented above have been accurately summarized from the official assay certificates provided to the Company. Pacific Rim's drill sampling procedures follow the Exploration Best Practices Guidelines outlined by the Mining Standards Task Force and adopted by The Toronto Stock Exchange Toronto Stock Exchange (TSE) Canada's largest stock exchange, trading approximately 1,200 company stocks and 33 options. . This includes splitting the drill core, collecting one half for assay and retaining the other half for future reference, uniquely labeling and bagging each sample, limiting access to drill core and samples, storing samples in a secure environment and promptly shipping samples to a North American North American named after North America. North American blastomycosis see North American blastomycosis. North American cattle tick see boophilusannulatus. laboratory. Samples have been assayed using fire assay with a gravimetric gravimetric /grav·i·met·ric/ (grav?i-me´trik) pertaining to measurement by weight; performed by weight, as a gravimetric method of drug assay. grav·i·met·ric adj. 1. finish on a 30-gram split. Quality control measures, including check- and sample standard-assaying, are being implemented. Samples were assayed by Inspectorate America Corporation in Reno, Nevada USA, an ISO (1) See ISO speed. (2) (International Organization for Standardization, Geneva, Switzerland, www.iso.ch) An organization that sets international standards, founded in 1946. The U.S. member body is ANSI. 9002 certified laboratory, independent of Pacific Rim Mining Corp. Details of the Minita resource estimate and a summary of the geology of the El Dorado project are presented in a technical report prepared for Dayton Mining Corporation (a predecessor company of Pacific Rim Mining Corp.) by Mr. P. LaCroix, P.Eng (a Qualified Person as defined in National Instrument 43-101) entitled "Resource Update Nueva Esperenza & El Dorado Mine Area - El Dorado Project - El Salvador", dated February 8, 2002. The Minita resource was calculated using a normal kriging technique and all assays above 55.0 g/t gold (n equals 7) were capped at 55.0 g/t gold. Drill composites with poor core recovery were adjusted two-fold: both the grade and the specific gravity specific gravity, ratio of the weight of a given volume of a substance to the weight of an equal volume of some reference substance, or, equivalently, the ratio of the masses of equal volumes of the two substances. of the composite were multiplied by the core recovery. LaCroix's report is summarized in the Company's 2002 Annual Information Form, available on SEDAR SEDAR System for Electronic Document Analysis and Retrieval SEDAR Southeast Data, Assessment, and Review . Pacific Rim intends to commission an updated resource calculation for the El Dorado project in the coming months, which may include an updated estimate of the Minita resource. On behalf of the board of directors, Thomas C. Shrake, CEO Information set forth in this document may involve forward-looking statements forward-looking statement A projected financial statement based on management expectations. A forward-looking statement involves risks with regard to the accuracy of assumptions underlying the projections. . By their nature, forward-looking statements are subject to numerous risks and uncertainties, some of which are beyond Pacific Rim's control, including: the results of current exploration activities; the results from future exploration opportunities; significant declines in metal prices; currency fluctuations; increases in production costs; differences in ore grades, recovery rates, and tonnes mined from those expected; changes in mining, or heap leaching Heap leaching is an industrial mining process to extract precious metals and copper compounds from ore. Process The mined ore is crushed into small chunks and heaped on an impermeable plastic and/or clay lined leach pad where it can be irrigated with a leach solution to rates from currently planned rates; general market and industry conditions; and other factors detailed in the Company's filings with the U.S. securities and Exchange Commission. Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise im·pre·cise adj. Not precise. im pre·cise ly adv. and, as such, undue reliance
should not be placed on forward-looking statements. Pacific Rim's
actual results, programs and financial position could differ materially
from those expressed in or implied by these forward-looking statements,
and, accordingly, no assurance can be given that the events anticipated
by the forward-looking statements will transpire or occur, or if any of
them do so, what benefits Pacific Rim will derive therefrom there·from adv. From that place, time, or thing. Adv. 1. therefrom - from that circumstance or source; "atomic formulas and all compounds thence constructible"- W.V. . Pacific Rim Mining Corp. disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise. The TSX TSX Toronto Stock Exchange (TSE before April, 2002) TSX Transfer from Stack Pointer to Index TSX True Space Extension and The AMEX AMEX See: American Stock Exchange have neither reviewed nor accept responsibility for the adequacy or accuracy of this release. |
|
||||||||||||||

pre·cise
ly adv.
Printer friendly
Cite/link
Email
Feedback
Reader Opinion