Printer Friendly
The Free Library
19,122,084 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

Pacific Rim Mining Corp.: El Dorado Step-Out Drilling Yields New High Grade Intercepts.


Business Editors

VANCOUVER, British Columbia--(BUSINESS WIRE)--July 25, 2003

Pacific Rim Pacific Rim, term used to describe the nations bordering the Pacific Ocean and the island countries situated in it. In the post–World War II era, the Pacific Rim has become an increasingly important and interconnected economic region.  is pleased to present the latest drill results from its El Dorado El Dorado, legendary country of South America
El Dorado (ĕl`dərä`dō, –rā`–) [Span.,=the gilded man], legendary country of the Golden Man sought by adventurers in South America.
 gold project in El Salvador El Salvador (ĕl sälväthōr`), officially Republic of El Salvador, republic (2005 est. pop. 6,705,000), 8,260 sq mi (21,393 sq km), Central America. . The Company is extremely pleased with the results from its step-out drilling program on the Minita vein at El Dorado, which have expanded the dimensions of the Minita mineralization Mineralization
The process by which the body uses minerals to build bone structure.

Mentioned in: Rickets

mineralization,
n the bioprecipitation of an inorganic substance.
 chute. Highlights include 7.0 meters of 12.3 g/t gold in hole P03-251 and 4.4 meters of 10.09 g/t gold in hole P03-246. Results from the Company's La Calera La Calera may refer to:
  • Colombia
  • La Calera, Cundinamarca
  • Chile
  • La Calera, Chile
  • Mexico
  • La Calera Airport
See also
  • Calera
 drill program including the resampling of existing holes will available in the coming weeks.

The assay results from seven new step-out holes drilled on the Minita vein have been received. These holes were designed to delineate the limits of the Minita mineralization in preparation for an updated resource calculation Pacific Rim will commission in the coming weeks. The Minita vein system was mined in the mid-1900's and currently hosts an indicated resource of 799,200 tonnes with an average grade of 13.7 g/t gold and 97.9 g/t silver. This resource totals 352,000 ounces of gold and 2.5 million ounces of silver (see NI 43-101 Disclosure section) and does not take into account the results of Pacific Rim's on-going drill program. Hole P03-245 was designed to follow up on Pacific Rim's hole P02-206, which was drilled to the south of the Minita resource and returned 1.1 meters grading 55.5 g/t gold (see NR #02-10 dated August 2, 2002). Holes P03-246 through 251 were designed to test the area at the north end of the chute: above, down-rake and below its previously defined margins. A longitudinal section of the Minita vein resource area is available at http://www.pacrim-mining.com/i/maps/minita_long_sec-jul2403.gif.

Table 1: El Dorado Program


--------------------------------------------------------------------
Hole    Vein     UTM  Drill   From     To  Inter-  True  Gold Silver
No.   Tested   North-  hole   (met-  (met-   sec- Width  (g/t)  (g/t)
                 ing/   azi-   ers    ers   tion   (met-
                East-  muth/  down   down   (met-   ers)
                 ing    dip   hole)  hole)   ers)
                      (degr-
                        ees)
--------------------------------------------------------------------
P03    South  301376/  090/
 -245 Minita  534098   -60  221.45  225.05  3.60   1.80  9.49      -
--------------------------------------------------------------------
                             286.8     288  1.20   0.85  6.92      -
--------------------------------------------------------------------
P03     Deep  301656/  090/
 -246 Minita  533919   -67  398.05  404.95  6.90   4.44 10.09      -
--------------------------------------------------------------------
P03     Deep  301699/  081/
 -247 Minita  533917   -63   334.1  339.15  5.05   3.41  7.76      -
--------------------------------------------------------------------
P03     Deep  301760/  089/
 -248 Minita  533966   -70   306.2  307.35  1.15   0.66  6.38      -
--------------------------------------------------------------------
P03    North  301831/  090/
 -249 Minita  533959   -56   188.2   189.4  2.05   1.45 13.44      -
--------------------------------------------------------------------
P03     Deep  301514/  090/
 -250 Minita  534010   -71   No Significant Intercepts
--------------------------------------------------------------------
P03     Deep  301642/  098/
 -251 Minita  533964   -71  369.35  383.45  14.1   7.05 12.29     -
--------------------------------------------------------------------



The Minita high-grade chute rakes shallowly to the north and is open in that direction. Drill hole P03-247 and Pacific Rim's previously released hole P02-205 intersected high-grade gold (9.33 meters of 9.75 g/t gold, see NR#02-10), which adds roughly 75 meters to the length of the chute axis to the north. Holes P03-246 and 251 were drilled below the north end of the main chute axis. These holes intersected bonanza grade gold at elevations extending to 39 meters above sea level Meters Above Sea Level is a standard metric measurement of the elevation of a location in reference to mean sea level. Uses
Meters above sea level is the standard measurement of the elevation or altitude of:
, 70+ meters below what was previously thought to be the base of the Productive Interval. The Minita chute now appears to be T-shaped, with the top of the "T" raking steeply to the south and open at depth below holes 246 and 251. Drill hole P03-249 was drilled to the north and well above the axis of the the diameter of the sphere which is perpendicular to the plane of the circle.

See also: Axis
 main chute at an elevation of 250 meters above sea level. This hole adds 100 meters of strike length at this level.

Pacific Rim's geologic mapping and surface sampling program has been completed in the North District of the El Dorado project. This program has identified many new veins with a cumulative strike length of 4 kilometers. Of particular interest is the extension of the southern end of the 3 km long San Matias Vein, where surface sampling indicates a broad area with higher-than-average gold values. Surface elevations in this anomalous area are roughly 500 meters above sea level; 200 meters above the top of the Productive Interval. Two north-northwest striking extensional veins have been identified within this anomalous area. An extensional fault An Extensional Fault is a fault that extends the pre-existing geological layering. In most cases such a fault is also a normal fault, but may be rotated to have a reverse fault geometry.  hosts the Minita resource approximately 3.5 kilometers to the southeast.

"This new drilling significantly expands the outer dimensions of the high-grade Minita chute, which remains open at depth," says Tom Shrake, CEO (1) (Chief Executive Officer) The highest individual in command of an organization. Typically the president of the company, the CEO reports to the Chairman of the Board. . "Minita is an exceptional deposit with an average width exceeding 3 meters in a structural regime that provides excellent ground conditions. Both of these factors will positively affect the economics. We will continue drilling until we have defined the outer boundaries of the deposit and then immediately commission a revised resource calculation. In the North District, we are keen to test these newly discovered, high-priority targets."

NI 43-101 Disclosure

Pacific Rim's exploration work on the El Dorado project is being supervised by William Gehlen a Certified Professional Geologist with the AIPG AIPG American Institute of Professional Geologists  (No. 10626), an employee of Pacific Rim and a Qualified Person as defined in NI 43-101. Mr. Gehlen has verified that the drill results presented above have been accurately summarized from the official assay certificates provided to the Company. Pacific Rim's drill sampling procedures follow the Exploration Best Practices Guidelines outlined by the Mining Standards Task Force and adopted by The Toronto Stock Exchange Toronto Stock Exchange (TSE)

Canada's largest stock exchange, trading approximately 1,200 company stocks and 33 options.
. This includes splitting the drill core, collecting one half for assay and retaining the other half for future reference, uniquely labeling and bagging each sample, limiting access to drill core and samples, storing samples in a secure environment and promptly shipping samples to a North American North American

named after North America.


North American blastomycosis
see North American blastomycosis.

North American cattle tick
see boophilusannulatus.
 laboratory. Samples have been assayed using fire assay with a gravimetric gravimetric /grav·i·met·ric/ (grav?i-me´trik) pertaining to measurement by weight; performed by weight, as a gravimetric method of drug assay.

grav·i·met·ric
adj.
1.
 finish on a 30-gram split. Quality control measures, including check- and sample standard-assaying, are being implemented. Samples were assayed by Inspectorate America Corporation in Reno, Nevada USA, an ISO (1) See ISO speed.

(2) (International Organization for Standardization, Geneva, Switzerland, www.iso.ch) An organization that sets international standards, founded in 1946. The U.S. member body is ANSI.
 9002 certified laboratory, independent of Pacific Rim Mining Corp.

Details of the Minita resource estimate and a summary of the geology of the El Dorado project are presented in a technical report prepared for Dayton Mining Corporation (a predecessor company of Pacific Rim Mining Corp.) by Mr. P. LaCroix, P.Eng (a Qualified Person as defined in National Instrument 43-101) entitled "Resource Update Nueva Esperenza & El Dorado Mine Area - El Dorado Project - El Salvador", dated February 8, 2002. The Minita resource was calculated using a normal kriging technique and all assays above 55.0 g/t gold (n equals 7) were capped at 55.0 g/t gold. Drill composites with poor core recovery were adjusted two-fold: both the grade and the specific gravity specific gravity, ratio of the weight of a given volume of a substance to the weight of an equal volume of some reference substance, or, equivalently, the ratio of the masses of equal volumes of the two substances.  of the composite were multiplied by the core recovery. LaCroix's report is summarized in the Company's 2002 Annual Information Form, available on SEDAR SEDAR System for Electronic Document Analysis and Retrieval
SEDAR Southeast Data, Assessment, and Review
. Pacific Rim intends to commission an updated resource calculation for the El Dorado project in the coming months, which may include an updated estimate of the Minita resource.

On behalf of the board of directors,

Thomas C. Shrake, CEO

Information set forth in this document may involve forward-looking statements forward-looking statement

A projected financial statement based on management expectations. A forward-looking statement involves risks with regard to the accuracy of assumptions underlying the projections.
. By their nature, forward-looking statements are subject to numerous risks and uncertainties, some of which are beyond Pacific Rim's control, including: the results of current exploration activities; the results from future exploration opportunities; significant declines in metal prices; currency fluctuations; increases in production costs; differences in ore grades, recovery rates, and tonnes mined from those expected; changes in mining, or heap leaching Heap leaching is an industrial mining process to extract precious metals and copper compounds from ore. Process
The mined ore is crushed into small chunks and heaped on an impermeable plastic and/or clay lined leach pad where it can be irrigated with a leach solution to
 rates from currently planned rates; general market and industry conditions; and other factors detailed in the Company's filings with the U.S. securities and Exchange Commission.

Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise im·pre·cise  
adj.
Not precise.



impre·cisely adv.
 and, as such, undue reliance should not be placed on forward-looking statements. Pacific Rim's actual results, programs and financial position could differ materially from those expressed in or implied by these forward-looking statements, and, accordingly, no assurance can be given that the events anticipated by the forward-looking statements will transpire or occur, or if any of them do so, what benefits Pacific Rim will derive therefrom there·from  
adv.
From that place, time, or thing.

Adv. 1. therefrom - from that circumstance or source; "atomic formulas and all compounds thence constructible"- W.V.
. Pacific Rim Mining Corp. disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise.

The TSX TSX Toronto Stock Exchange (TSE before April, 2002)
TSX Transfer from Stack Pointer to Index
TSX True Space Extension
 and The AMEX AMEX

See: American Stock Exchange
 have neither reviewed nor accept responsibility for the adequacy or accuracy of this release.
COPYRIGHT 2003 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2003, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Geographic Code:0PACR
Date:Jul 25, 2003
Words:1441
Previous Article:First Financial Holdings, Inc. Declares Dividend.
Next Article:Multimedia Available: AMD Processors Fuel New Dimensions of Creativity in `Spy Kids 3-D: Game Over'.



Related Articles
Pacific Rim Mining Corp.: High-Grade Gold Intersected on El Dorado Drill Program.
Pacific Rim Mining Corp.: High Grade Gold Mineralization Found in New Discovery On La Calera Property.
Pacific Rim Mining Corp.: La Calera Drilling Yields Potential For Both Bulk Mineable and High Grade Underground Resources.
Pacific Rim Mining Corp.: La Calera Project Emerges as Potential Bulk Mineable Target.
Pacific Rim Mining Corp.: Minita Vein Gold Mineralization Expanded Further with Additional High-Grade Drill Intercepts.
Pacific Rim Mining Corp. Announces First Quarter Results.
Pacific Rim Mining Corp.: El Dorado Resource Grows to 821,200 Ounces of Gold Including 67% Increase in Minita Resource.
Pacific Rim Mining Corp.: New Area of Gold Mineralization Discovered in Gonso Vein Drilling.
Pacific Rim Mining Corp.: El Dorado Gold Project Drill Program Update.
Pacific Rim Mining Corp.: New High Grade Vein Intercepts Encountered in South Minita and Nance Dulce Drilling.

Terms of use | Copyright © 2012 Farlex, Inc. | Feedback | For webmasters | Submit articles