Printer Friendly
The Free Library
14,678,647 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

PGE and CTWS Announce Fish to Pass Oregon Dams for First Time in Decades; Only U.S. Hydro Project Co-owned by Utility and Native American Tribe.


WARM SPRINGS, Ore. -- Salmon and steelhead will migrate past a large series of dams for the first time since 1968, under the terms of an historic multiparty agreement to be signed today. Secretary of the Interior Gale Norton Gale Ann Norton (born March 11, 1954) served as the 48th United States Secretary of the Interior from 2001 to 2006 under President George W. Bush. She was the first woman to hold the position.  is announcing the agreement at a ceremony in Warm Springs, Ore.

The pact is one of the final steps in obtaining a new federal license for Pelton Round Butte Butte, city, United States
Butte (byt), city (1990 pop. 33,336), seat of Silver Bow co., SW Mont.; inc. 1879. It is a trade, ranching, and industrial center.
, the only hydroelectric project in the United States United States, officially United States of America, republic (2005 est. pop. 295,734,000), 3,539,227 sq mi (9,166,598 sq km), North America. The United States is the world's third largest country in population and the fourth largest country in area.  jointly owned by a Native American tribe and a utility. The 465-million watt project is one-third owned by the Confederated Tribes of Warm Springs The Confederated Tribes of Warm Springs is a federally recognized confederation of Native American tribes who currently live on and govern the Warm Springs Indian Reservation in the U.S. state of Oregon.  (CTWS CTWS Confederated Tribes of Warm Springs ) and the remainder owned by Portland General Electric This article is not to be confused with PG&E, a San Francisco, California-based utility company
Portland General Electric (PGE) (NYSE: POR) is an electrical utility, formerly owned by the Houston-based Enron Corporation (but now independent), that distributes electricity to
 (PGE PGE Pacific Gas and Electric Company
PGE Portland General Electric
PGE Prostaglandin E
PGE Platinum Group Elements
PGE Pacific Great Eastern (Railroad)
PGE Phenyl Glycidyl Ether
PGE Perfect Girl Evolution
). The 20-mile long complex impounds the Deschutes River, a federal Wild and Scenic River and a tributary of the Columbia, about six miles west of Madras, Ore. The three dams, rising to as high as 440 feet, blocked salmon and steelhead migration in the Deschutes, Metolius and Crooked rivers above the project 36 years ago.

A total of 22 organizations and government agencies, including the project owners, endorsed the agreement. The signing takes place at the Museum at Warm Springs on the Warm Springs Reservation.

"The settlement demonstrates how water management and hydroelectric operations can be carried out in innovative ways that protect tribal resources, enhance the environment and aid in the recovery of threatened species," Secretary Norton said. "With sound science, cutting-edge technology and creative solutions, we can have both healthy rivers and thriving communities."

Officials praised the agreement for its positive economic and environmental impact. Besides potentially reopening 226 miles of streams above the dams to fish migration, the plan allows for continued production of low-cost hydroelectric power at the facility, improves the Tribes' fish harvest and benefits recreational fishing.

"This agreement sets the bar for other dam operators in the Northwest and across the country. PGE, CTWS and the other settlement parties have proven that by working together, we can achieve great outcomes for this river's health, its salmon and steelhead, and its people," said Rebecca Wodder, president of American Rivers.

"For all of the families who enjoy the Deschutes today, and for those future generations who will fish its waters, run its rapids and view its wildlife in the years to come, this agreement is cause for great celebration." In the 1990s, the Tribes and PGE began planning for relicensing the project and restoring fish passage became the top priority.

"Many generations will benefit from this agreement," said CTWS Council Chairman Ron Suppah. "The next 50 years under this new license will create a blueprint for wise natural resources management that is so important to our Indian people and financial resources that are vital to the tribal organization. Adding electric power generation has diversified our economic base and supported programs ranging from public safety to health and education."

"PGE and the Tribes share the stewardship of one of the West's most precious resources, the Deschutes River," said Peggy Fowler, PGE CEO (1) (Chief Executive Officer) The highest individual in command of an organization. Typically the president of the company, the CEO reports to the Chairman of the Board.  and president. "Our customers depend on us to do the right thing for the environment. They also depend on us for electricity that powers vital aspects of everyday life. We're committed to deliver on both obligations."

The hydro project, the largest located completely within Oregon's borders, was completed by PGE in 1964. Although it was constructed with fish passage facilities, the downstream system failed. Under the environmental policies of that era, raising fish in a hatchery hatchery

a commercial establishment dedicated to the hatching of bird eggs to provide day old chicks and poults to the poultry industry.


hatchery liquid
the contents of unfertilized eggs. Used in petfood manufacture.
 was an appropriate way to offset the impact. The fish passage problem was created in large part by the downstream currents in a reservoir taking a wrong turn. Young salmon and steelhead following the currents rarely found their way to the ocean.

The solution will be a 270-foot high underwater tower arising from the bottom of the lake behind Round Butte Dam. A 130-foot wide disc at the top of the tower will draw in most of the surface water, turning the currents and fish back downstream toward the dam. Fish will be screened at the intake and trucked downstream of the dams for release on their journey to the Pacific. The tower will also blend waters from various depths to improve the conditions, including water temperatures, for downstream fish.

Species to be reintroduced above the dams include summer steelhead (a federally listed threatened species) and spring Chinook salmon chinook salmon
 or king salmon

Prized North Pacific food and sport fish (Oncorhynchus tshawytscha) of the salmon family. The average weight is about 22 lbs (10 kg), but individuals of 50–80 lbs (22–36 kg) are not unusual.
. Resident kokanee kokanee
Noun

a freshwater salmon of lakes and rivers in W North America [after Kokanee Creek, in British Columbia]
 should naturally convert to sockeye salmon sockeye salmon
 or red salmon

Food fish (Oncorhynchus nerka) of the North Pacific that constitutes almost 20% of the commercial fishery of Pacific salmon. It weighs about 6 lbs (3 kg) and lacks distinct spots on the body.
 as they head downstream.

PGE and the Tribes are prepared to spend more than $135 million dollars on the project during the 50-year term of the license, the vast majority going to fish-related measures. More than $21 million is planned for fish habitat improvement on Deschutes River tributaries, including water rights acquisition.

The project's reservoirs and their shores are popular recreation sites, including camping, fishing, boating and water skiing. The plans do not restrict recreation and should actually improve recreational fishing for salmon and steelhead over the long run through increased populations and better habitat.

The Federal Energy Regulatory Commission The Federal Energy Regulatory Commission (FERC) is the United States federal agency with jurisdiction over electricity sales, wholesale electric rates, hydroelectric licensing, natural gas pricing, and oil pipeline rates.  is expected to act on the new license in late 2004 or early 2005.

PGE is a recognized leader in the utility industry with more than 115 years of experience delivering safe and reliable electricity. Serving more than 754,000 retail customers in northwest Oregon, the company supports the community through a variety of environmental efforts. Visit PGE on the Web at www.PortlandGeneral.com.

The Confederated Tribes of the Warm Springs Reservation of Oregon is a federally recognized Indian Tribe INDIAN TRIBE. A separate and distinct community or body of the aboriginal Indian race of men found in the United States.
     2. Such a tribe, situated within the boundaries of a state, and exercising the powers of government and, sovereignty, under the national
 with 4,312 members. Its reservation in north Central Oregon covers 1,000 square miles. Visit www.warmsprings.com.
COPYRIGHT 2004 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2004, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Date:Jul 13, 2004
Words:927
Previous Article:Clariant Announces Lancaster Synthesis Sale to Johnson Matthey.
Next Article:Carbon Nanotechnologies, Inc. Announces the Allowance of a U.S. Patent for Coating Single-Wall Carbon Nanotubes.



Related Articles
TRIBAL ELDER KEEPS SALMON CEREMONY GOING STRONG.(Festivals)(Agnes Pilgrim is passionate about the sacred rite - and about welcoming anyone interested...
Shallow lake will have deep impact.(Environment)(The corps releases its environmental assessment of the Fern Ridge Dam repair)
A win for salmon.(Editorials)(Judge rejects government's recovery plan)(Editorial)
Falling water, rising wind: seeking answers to problems of drought and economic stagnation, Indian tribes in the American West are listening to the...
Fishy politics.(Editorials)(Congress should fund Fish Passage Center)(Editorial)
EWEB studies fish ladder option.(Utilities)(The improvements, including a downstream passage, may be needed to obtain a new license for a...
Now save the Klamath.(Editorials)(Both fishing industry, river need to be rescued)(Editorial)
Dam removal fund suggested.(Utilities)(Environmental groups say EWEB should start saving money for eventual decommissioning of three hydroelectric...
The challenges of dam removal: the history and lessons of the Condit Dam and potential threats from the 2005 Federal Power Act amendments.
THE RETURN OF LITTLE BIG FISH.(Recreation)(After an absence of more than 40 years, summer steelhead again swim in the upper Deschutes basin)

Terms of use | Copyright © 2009 Farlex, Inc. | Feedback | For webmasters | Submit articles