This is a short excerpt of a patient visit with the Process Doctor. This is a fictional depiction of an industry problem and customer communication and any similarities to any actual conversations are purely coincidental co·in·ci·den·tal  
adj.
1. Occurring as or resulting from coincidence.

2. Happening or existing at the same time.



co·in
.

Client: We are seeing a high number of field complaints regarding drained battery issues on one specific design. This Class 2, handheld device is seeing good performance with the exception of the drained batteries.

Foresite: Are you still using the no-clean solder paste Solder paste (or solder cream) is a mix of small solder particles and flux. It is used extensively in the automated soldering processes wave soldering and reflow soldering.  you qualified?

Client: Yes, and we have qualified a new assembler Software that translates assembly language into machine language. Contrast with compiler, which is used to translate a high-level language, such as COBOL or C, into assembly language first and then into machine language.  and they are using the same materials as the previous assembler did during the four years they had the product. We have seen the issue with three different battery suppliers. Units returned from the field will drain a battery within three weeks in the OFF position.

[FIGURE 1 OMITTED]

Foresite: Are you seeing any dendrites or other corrosion issues?

Client: No corrosion or electrochemical electrochemical /elec·tro·chem·i·cal/ (-kem´i-k'l) pertaining to interaction or interconversion of chemical and electrical energies.

e·lec·tro·chem·i·cal
adj.
 migration issues were noted. And the power consumption has been optimized on this software revision.

Foresite: Let's run a couple of tests and investigate the assembly to see the circuits associated with the battery connections.

Two days later in the Process Doctor's office.

Foresite: How are things? Still the same?

Client: Yes, we are adding staff to our battery replacement program.

Foresite: The good news is that the incoming bare boards are clean and your suppliers are meeting the cleanliness specifications that you put in place. The assembler is showing a marginal to high level of weak organic acid (WOA WOA Wacken Open Air (music festival)
WOA Work of Art
WOA Western Orthopaedic Association
WOA Web Offset Association (Nashville, TN)
WOA World Airways, Inc (ICAO code) 
) residues from the no-clean solder paste. They are using the same approved paste, but the stencil stencil, cutout device of oiled or shellacked tough and resistant paper, thin metal, or other material used in applying paint, dye, or ink to reproduce its design or lettering upon a surface.  is 0.008" versus the 0.006" used previously and we see more visible flux residue in a number of critical areas on both sides of the SMT (1) (Surface Mount Technology) See surface mount.

(2) (Station ManagemenT) An FDDI network management protocol that provides direct management. Only one node requires the software.

SMT - Station Management
 assembly. But the most interesting observation was that all nine of the failures provided for testing showed a fine debris pattern in critical areas of the battery circuit. This photo (Figure 1) represents much of what we were able to see on the assemblies themselves. These photos taken at 150X show that this debris was present primarily on the second side. You can see from the photo that the fiber was present at the time of reflow (1) The process of heating and melting the solder that has been screen printed onto a printed circuit board in order to bond chips and other components to the board. Surface mount chips (SMT) use the reflow method. Contrast with wave soldering. See also reflowable text.  for the flux to wick along the fiber surface.

We were able to measure leakage across this fiber and flux location. When we analyzed the residue from this 0.1" area of the assembly we found high levels of WOA residues.

Since we see the fiber debris on all nine failures, primarily on the second side, we tested the transfer racks from the process and found these microfibers in the racks and ESD (1) (Electronic Software Distribution) Distributing new software and upgrades via the network rather than individual installations on each machine. See ESL.  tubs. Each rack and tub showed a dust and debris buildup that had never been cleaned, according to according to
prep.
1. As stated or indicated by; on the authority of: according to historians.

2. In keeping with: according to instructions.

3.
 the floor operators. We recommend a thorough cleaning and plastic cover system of these racks. We also recommend investigating the use of a thinner stencil to reduce the flux amount, but only if a design of experiments shows the thinner stencil will achieve the same solder joint quality required for your product.

On another issue, have you seen missing segments on your display?

Client: Yes, on a small scale but is has been an intermittent problem and concern as well. Why?

Foresite: We found that that the display showed high ionic residues on the surface of the ITO Ito, city (1990 pop. 71,223), Shizuoka prefecture, central Honshu, Japan, on the Izu Peninsula and the Sagami Sea. It is an important fishing port and hot spring resort.


See indium.
 interface to the carbon connection strip.

Client: Thanks, we will investigate these issues as well.

Sixteen months after implementing the recommended corrective actions, the ESS-biased humidity test samples passed and the product from the improved process exhibits rare battery problems and lost display segment problems.

Terry Munson is with Foresite Inc. (residues.com); tm_foresite@residues.com. His column appears monthly.

[ILLUSTRATION OMITTED]
COPYRIGHT 2006 UP Media Group, Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2006, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Title Annotation:Process Doctor
Author:Munson, Terry
Publication:Circuits Assembly
Date:Jul 1, 2006
Words:626
Previous Article:Compliance verification: the best programs detail the "who, what, where, when and how" of testing ESD technical elements.(ESD Basics)
Next Article:DEK's HawkEye post-print verification system.(Equipment Advances)



Related Articles
DEVELOPER FINED FOR DISCHARGE.(News)
Mandates without the pain: cities in California are trying contractor-friendly methods to promote C&D recycling. (C&D Series).(Brief Article)
Avoiding the voids: plating voids are usually blamed on the metalization process, yet the causes are plentiful. (The Plating Rack).(Editorial)
Kidney disease of diabetes.(Pamphlet)
Closing the loop at Stora Enso Uetersen: at one German mill, a new filtration system reduced a fine paper machine's freshwater consumption by nearly...
Swabbing it clean: how clean are your cleaning materials?(Process Doctor)
Terminally ill doctor joins legal fight over assisted suicide prescriptions.(Health)
Cleaning up after Pb-free: lacking field data for no-clean Pb-free solders and confidence in accelerated aging tests? Effective cleaning is the only...
A fines challenge: the C&D recycling industry looks for solutions to the problem of H2S generation in ADC made from C&D fines.(GYPSUM UPDATE)
ANGELS NOTEBOOK: GUERRERO SAYS HE IS IN GOOD SHAPE.(Sports)

Terms of use | Copyright © 2009 Farlex, Inc. | Feedback | For webmasters | Submit articles