New Contracts Sweetened.The Oil Ministry now says it has sweetened sweet·en v. sweet·ened, sweet·en·ing, sweet·ens v.tr. 1. To make sweet or sweeter by adding sugar, honey, saccharin, or another sweet substance. 2. To make more pleasant or agreeable. the terms for IOCs bidding for its oilfields by reducing the tax. But it does not elaborate on this. The head of the Oil Ministry's largest producing company, South Oil Co. (SOC (System On a Chip) The electronics for a complete, working product contained on a single chip. While a microcontroller includes all the hardware components required to process instructions, an SoC includes the computer and all required ancillary electronics. ), Dhia' Ja'far Ja'far (Arabic: جعفر) is an Arabic name, variously transliterated as Jafar, Džafer, Jaffar, Jaafar or Giafar. , says the new terms See suggestions for new terms. will result in the signing of agreements for the ten fields of the second bidding round, scheduled to be held on Dec. 11-12 in Baghdad. "There is unique opportunity for international oil companies to work with us to develop these oilfields", says Tamer al-Ghadhban, top energy adviser to the PM. Ghadhban, twice oil minister after the 2003 US-led invasion, says he expects the second auction to attract more companies. Abdul-Mahdi al-Ameedi, head of the ministry's Petroleum Contracts and Licencing Directorate (PCLD PCLD Polycystic Liver Disease PCLD Power Control Algorithm with Limited Diversity ) says the new contract model specifies the difference between discovered and undiscovered reservoirs, adding: "If a contracted company discovered a new reservoir [in addition to the one already found], we can agree on a new payment fee for each barrel produced from that given reservoir". He says the production plateau plateau, elevated, level or nearly level portion of the earth's surface, larger in summit area than a mountain and bounded on at least one side by steep slopes, occurring on land or in oceans. for each field in the second round has to be reached between seven and 13 years after development work begins. In the first round, the output plateau had to be reached in the seventh year. A final model contract has been presented to IOCs. Similar to the first round's model contract, the new contract gives a 20-year service period, renewable for another five years, with IOCs taking 75% in the joint JV and the government holding the remaining 25% through a company designated by the Oil Ministry. |
|
||||||||||||||

Printer friendly
Cite/link
Email
Feedback
Reader Opinion