Navy seeks to avert precipitous decline in the size of the fleet.An ambitious Navy plan to expand the size of the fleet not only assumes a considerable surge in spending, but also a fundamental shift in the preparation and execution of ship programs, senior officials say. An effort to increase the fleet from 281 to 313 ships during the next 30 years will require nearly $5 billion more annually than the Navy currently spends on ship building. One of the officers in charge of executing the plan, Rear Adm. Barry McCullough, says these goals are attainable, but only if the Navy begins to curb its huge appetite for the "latest and greatest" technology and correctly forecasts the threats the fleet is likely to face in the coming decades. The shipbuilding program has been mired mire n. 1. An area of wet, soggy, muddy ground; a bog. 2. Deep slimy soil or mud. 3. A disadvantageous or difficult condition or situation: the mire of poverty. v. in controversy, as the Navy in recent years has seen a slowdown in the construction of new ships, while it continues to retire old ones. The upshot has been a precipitous decline in the size of the fleet, which prompted the chief of naval operations chief of naval operations n. pl. chiefs of naval operations Abbr. CNO The ranking officer of the U.S. Navy, responsible to the secretary of the Navy and to the President. , Adm. Michael G. Mullen, to try to come up with ways to stop the decline and gradually begin an upsurge in the number of ships. One of Mullen's rules is that shipbuilding programs must be "stabilized," meaning that the Navy must stick to the approved long-term plans and avoid changing the features and performance specs of a ship after it's already been designed. "Historically, we've had a propensity to grow or change requirements" while ships are being designed and built, says McCullough, who is director of Navy surface warfare That portion of maritime warfare in which operations are conducted to destroy or neutralize enemy naval surface forces and merchant vessels. Also called SUW. . "When we change requirements, once we define the capability, it adds cost," he says in an interview. "It's incumbent upon the Navy and the people in my directorate to define a requirement, stick to it and challenge industry to drive the cost down." Mullen's guidance has been clear: No more bells and whistles A slang English term for exceptional features in some product. In the computer field, it typically refers to functions in software that may be greatly appreciated by some users, even though they may not be necessary most of the time. that add costs and delay construction schedules. In exchange for stability, he will expect shipbuilders to trim their prices. McCullough says there is a cultural tendency among Navy planners to change the requirements to keep pace with geopolitical ge·o·pol·i·tics n. (used with a sing. verb) 1. The study of the relationship among politics and geography, demography, and economics, especially with respect to the foreign policy of a nation. 2. a. changes and "threat analysis." It takes five years or longer to build a ship, he adds. "As you move forward, the analysis of threats changes, and we always want the latest and greatest things." That thinking must evolve, if the Navy is to ever reach a 313-ship fleet, which is expected to include 11 aircraft carriers, 88 surface combatants, 55 littoral combat ships The Littoral Combat Ship is the first of the U.S. Navy's next-generation surface combatants. Intended as a relatively small surface vessel for operations in the littoral region (close to shore), the LCS is smaller than the Navy's guided missile frigates, and have been compared to , 48 attack submarines, four cruise missile submarines This article is about guided missile submarines. For the Pakistani sea-commando unit, see frogman#Pakistan. A cruise missile submarine is a submarine that can launch cruise missiles. , 14 ballistic missile submarines A ballistic missile submarine is a submarine equipped to launch ballistic missiles (SLBMs), such as the Russian R-29 or the American/British Trident. Although some early models had to surface to launch their missiles, modern vessels typically launch while submerged at depths , 31 expeditionary warfare Expeditionary warfare is used to describe the organistion of a nations military to fight abroad, especially when deployed to fight away from its established bases at home or abroad. ships, 30 logistics vessels, 12 maritime pre-positioning cargo ships and 20 support vessels. The annual shipbuilding budget would grow from $8.6 billion in 2007 to $13.5 billion annually after that, and would soar to $17 billion by 2011. The size of the Navy has been a source of contentious debate and angry rhetoric on Capitol Hill. Former chief of naval operations Adm. Vernon Clark, who retired last year, initially had endorsed a 375-ship goal, but quickly backed off that proposal once it became clear that the Defense Department would not support it. Clark then unveiled a shipbuilding plan that offered options ranging from a 260-ship to a 325-ship Navy. At that point, Mullen says, the Navy was headed for a drastically smaller fleet that would not have been sufficient to do its job. "We were on a glide-slope for a much smaller navy, even though we said 260." Mullen says that if the Navy and Congress commit to the 313-vessel plan, the shipyards will no longer be able to blame the Navy for cost overruns attributed to changes in the ship requirements and construction delays. McCullough says planners will have to define the characteristics and capabilities of a ship by taking into account both future threats and the current needs of the fleet. The Defense Department, in its 2006 quadrennial quad·ren·ni·al adj. 1. Happening once in four years. 2. Lasting for four years. quad·ren ni·al n. review of military strategy, directs the services to take
more cues from regional combatant commanders as they design new weapon
systems.
That will be a tough job, says McCullough. Combatant commanders, he says, have a clear vision of the current fight, but do not have the resources to do the analysis looking 20 years into the future, as the CNO CNO abbr. chief of naval operations staff does. "We have the capability to get that analysis for the out-years and couple that with the Fleet Forces Command input to build a program," says McCullough. With the new mandate in the QDR QDR Quadrennial Defense Review (US DoD) QDR Quad Data Rate (Memory Technology) QDR Quality Deficiency Report QDR Quality, Durability and Reliability (Toyota Motor Company) , "the process will change, but to what degree, I'm not sure." |
|
||||||||||||||||||||

ni·al n.
Printer friendly
Cite/link
Email
Feedback
Reader Opinion