NIGERIA - The Aje JV.In early 2005 a consortium signed agreements to join with Yinka Folawiyo Petroleum (YFP YFP Yellow Fluorescent Protein (microscopy) YFP Floating Power Barge (Non Self-Propelled) YFP Your Favorite Protein ) and Syntroleum to develop the deep-water Aje AJE American Journal of Epidemiology AJE American Journal of Education AJE Association des Juristes de l'État (French; Quebec, Canada) AJE African Joint Effort oil and gas find in OML OML Object Manipulation Language (ODMG) OML Ordinary Maternity Leave (UK) OML Order of Merit List OML Orquestra Metropolitana de Lisboa (Portugese) OML Oil Mining License 113. Additions to the permit are Lundin Petroleum Lundin Petroleum is an independent international petroleum company based in Sweden. Overview Created in 2001 following the takeover of Lundin Oil AB by Canadian independent Talisman Energy, Lundin Petroleum AB is a Swedish oil company traded on the Stockholm Stock (22.5%) will serves as technical adviser to the JV, Palace Exploration and Howard Exploration, both private US firms, Challenger Minerals (a unit of drilling contractor GlobalSantaFe) and Providence Resources (6.328%) of Ireland. The Aje-1 discovery is 24 km offshore in water depths from 100 to 1,500m close to the maritime border with Benin. The well encountered a thin oil rim in a gas-charged Turonian sandstone, and tested at 42 MCF/d of gas and 2,262 b/d of oil from three zones. Due to mechanical problems, Aje-1 only reached the Turonian sandstone. The 1997 Aje-2 appraisal penetrated the deeper Cenomanian sandstone at a depth of 2,400m. This oil zone was tested by Aje-2 from a structurally low position, at 3,866 b/d of 39[degrees] API (Application Programming Interface) A language and message format used by an application program to communicate with the operating system or some other control program such as a database management system (DBMS) or communications protocol. oil from an 8m thick interval. The agreements involve the payment of a signature bonus to Syntroleum and YFP, as well as paying carry on costs to drill and test the Aje-3 appraisal in 2005, plus one further optional well. In addition, a further bonus on the start of commercial production will be paid to Syntroleum and YFP. |
|
||||||||||||||

Printer friendly
Cite/link
Email
Feedback
Reader Opinion