Maintenance crunch: two architects show how IHEs can avoid costly mistakes by using a facilities-assessment approach to maintaining campus buildings.What's the harm in the occasional drip from a ceiling or crack in a sidewalk? For colleges and universities, plenty. Consider these scenarios: * Potential liabilities. Life safety or code violations, such as improper ventilation in science labs, non-compliance with respect to ADA Ada, city, United States Ada (ā`ə), city (1990 pop. 15,820), seat of Pontotoc co., S central Okla.; inc. 1904. It is a large cattle market and the center of a rich oil and ranch area. , or trip hazards as a result of deteriorating sidewalks or ragged flooring, expose the institution to potential legal action. * Collateral damage collateral damage Surgery A popular term for any undesired but unavoidable co-morbidity associated with a therapy–eg, chemotherapy-induced CD to the BM and GI tract as a side effect of destroying tumor cells . If not attended to, an unrepaired leaking roof, for example, will result in damaged ceiling tiles, potential mold from continuously damp interior finishes, and potential impairment of building systems, including electrical or technology infrastructures. * Reduced recruitment and retention. When physical signs of a deteriorating campus are visible, they negatively impact campus growth. Having fewer students can result in inadequate funding for the institution's operations. But as the infrastructures of the nation's institutions age, planning and budgeting for deferred maintenance are increasingly crucial to the cost-effective operation of a campus. Funds are too often being diverted away from building maintenance and repair to more immediate, visible, or politically popular demands. As a result of the continuous deferral deferral - Waiting for quiet on the Ethernet. of some projects, educational institutions may incur even greater costs. When parts of the infrastructure fail unexpectedly and are not accounted for in a budget, they can throw an institution into a state of crisis management. Even worse, if unattended to for long enough, facilities management The management of a user's computer installation by an outside organization. All operations including systems, programming and the datacenter can be performed by the facilities management organization on the user's premises. can seem insurmountable. That is why it is important to create and use a system for identifying and managing your "deferred maintenance backlog." A deferred maintenance backlog is the quantification of accumulated maintenance projects left unaddressed. A carefully and objectively prepared deferred maintenance backlog is essential to financial planning Financial planning Evaluating the investing and financing options available to a firm. Planning includes attempting to make optimal decisions, projecting the consequences of these decisions for the firm in the form of a financial plan, and then comparing future performance against and budgeting. Many firms, including DSA (1) (Directory Server Agent) An X.500 program that looks up the address of a recipient in a Directory Information Base (DIB), also known as white pages. It accepts requests from the Directory User Agent (DUA) counterpart in the workstation. Architects, offer databases to their clients to quantify the assessment process; the reporting can also be done within an institution. SYSTEM SETUP Management consultant Peter Drucker Peter Ferdinand Drucker (November 19, 1909–November 11, 2005) was a writer, management consultant and university professor. His writing focused on management-related literature. emphasized the importance of "knowing what you don't know Don't know (DK, DKed) "Don't know the trade." A Street expression used whenever one party lacks knowledge of a trade or receives conflicting instructions from the other party. ." A complete facilities inventory and assessment can help institutions eliminate those unknowns. The process leads to better and more timely building repair and component replacement, improved long-term planning, and the ability to garner support for investments in the crucial, but often neglected, infrastructure of college and university campuses. A deferred maintenance backlog almost always exists. The key questions to ask: How large is the backlog? How long will it take to reduce the backlog given various levels of expenditure? Obviously, a large immediate outlay of funds can erase a deferred maintenance backlog. More likely, reducing this accumulation of past projects will take several years. A sound facilities-assessment and deferred-maintenance planning and budgeting tool can: * Create an inventory of existing facilities, which can be easily accessible in database format. * Provide an assessment of the general condition of each building with a concise report of the information. * Make available a method of determining the Facilities Condition Index (FCI (Flux Changes per Inch) The measurement of polarity reversals on a magnetic surface. In MFM, each flux change is equal to one bit. In RLL, a flux change generates more than one bit. ) of each building, each campus, and the institution as a whole for benchmarking purposes. * Supply a tool that assists institutions in meeting the goals of their mission statements through the timely maintenance of the physical backbone, the buildings themselves. Assessments of this type were recently performed at Oakland Community College Oakland Community College (OCC) is a community college established June 8 1964 in Oakland County, Michigan. It opened September 1965 with two campuses - Highland Lakes, a renovated hospital in Union Lake, and Auburn Hills, a former Army Nike missile site in Auburn Hills. in Bloomfield Hills, Mich., and at Wayne State University Wayne State University, at Detroit, Mich.; state supported; coeducational; established 1956 as a successor to Wayne Univ. (formed 1934 by a merger of five city colleges). in Detroit. OCC OCC See: Options Clearing Corporation OCC See Options Clearing Corporation (OCC). is one of largest community colleges in Michigan, with nearly 2 million square feet of buildings on five campuses. According to according to prep. 1. As stated or indicated by; on the authority of: according to historians. 2. In keeping with: according to instructions. 3. Vice Chancellor vice chancellor n. Abbr. VC 1. A deputy or an assistant chancellor in a university. 2. A deputy to or a substitute for a head of state or an official bearing the title chancellor. 3. Clarence Brantley, the greatest benefit of the assessment was a good inventory. "Knowing how many buildings we had and their condition was critical," he says. "Now that we have this information, it's very easy to track and update." Wayne State Wayne State may refer to the following public institutions:
Sears played for the National Football League Chicago Cardinals in 1954 and between 1957 and 1958, and for the American Football League's Los Angeles Chargers in 1960 and , associate vice president for Facilities Planning and Management. "Once we understood the deferred maintenance backlog, it gave us the opportunity to determine investment priorities." Institutions that use this process identify unknowns about needed investments, garner support for expenditures, and improve overall management of physical facilities. GETTING THE JOB DONE Experience has shown that a structured approach is needed to fully achieve the benefits of an assessment process. A random exercise in identifying problems is likely to create more problems than to result in a clear solution. A solid inventory and assessment should include 10 steps. While some of them may seem extraneous ex·tra·ne·ous adj. 1. Not constituting a vital element or part. 2. Inessential or unrelated to the topic or matter at hand; irrelevant. See Synonyms at irrelevant. 3. , each adds value to the whole exercise, resulting in a cohesive and lasting result that can be updated from year to year. 1. Start with an overview presentation to the facility's staff to ensure buy-in and commitment. 2. Collect preliminary data, including building names, square footage, number of floors, and use types (including multiple uses for each building). Examples are academic, administration, science, library, athletic or recreation, dormitory, etc. Use types are determined to estimate the current replacement value (CRV CRV Curve CRV Crew Return Vehicle (NASA) CRV California Redemption Value CRV Cassa Di Risparmio Di Vignola (Italian bank) CRV Call Reference Value (telecommunications) ) of each facility. What would it cost in today's dollars to construct the building? Science facilities cost more to construct than administrative buildings or dormitories, and this difference needs to be accounted for in order to complete the next step in the process. 3. Determine the CRV of each building and each campus, as well as the institution as a whole. 4. Spread the CRV of each building across the major building components: roof, structure, glazing, mechanical, electrical, interior finishes, etc. Base the calculations on standardized percentages and adjust where appropriate to reflect unique circumstances. 5. Conduct a walk-through of buildings to document and evaluate existing conditions of the building components and the facilities as a whole. Identify future potential maintenance issues based on estimated component life cycles and the history of repairs. 6. Incorporate information provided from previously conducted studies, including ADA compliance reviews and roof evaluations, to prevent duplication of effort. Utilize the information already collected so the value of these individual component studies is not lost. 7. Load the collected information into a customized database that is easy to update and maintain. 8. Use the database tool to calculate the current FCI, which is the dollar value of the One-Year Deferred Maintenance Backlog (DMB (Digital Multimedia Broadcasting) See mobile TV. ) divided by the CRV of the building. The One-Year DMB is defined as the dollar value of items that require repair or replacement immediately in order to safely use the facility for its current use or to prevent collateral damage. This figure includes life safety and code compliance items. The calculation results in a percentage that can be compared to nationally accepted standards and used to determine the condition of the facilities. 9. Analyze the data to generate short-and long-term recommendations for reducing--if not eliminating--the deferred maintenance backlog. These findings and recommendations should be summarized and presented to administration for approval of a funding plan that achieves the institution's goals with respect to the ongoing condition of its facilities. 10. Update the data on an annual basis and track the progress of the institution's FCI on a building-by-building, campus, or overall institution basis. JUST A STARTING POINT Noun 1. starting point - earliest limiting point terminus a quo commencement, get-go, offset, outset, showtime, starting time, beginning, start, kickoff, first - the time at which something is supposed to begin; "they got an early start"; "she knew from the There is a saying that goes, "If you don't know where you're going, any road will get you there." With the numerous demands being placed on higher learning higher learning n. Education or academic accomplishment at the college or university level. , it is often easy to forego making important decisions or scrutinizing the physical plant. A facilities assessment process enables institutions to: * Conduct a quick and cost-effective process to quantify an institution's deferred maintenance backlog and determine the level of funding necessary to reduce or eliminate the backlog and maintain the target FCI. * Provide institution personnel with a reliable database and reporting tool to easily update and maintain building records. * Gain support for the funding of building maintenance projects. * Create an accurate internal budgeting tool. * Capture facilities information in order to educate new staff on the current inventory and condition of each building. Commenting on the benefits of conducting a facilities assessment, Brantley of Oakland Community College says: "The process made us aware of where we stood. We knew we had a problem, but we didn't have knowledge of the actual dollar cost required to fix the problem. Now, we're developing a 10- to 15-year budget." In addition to helping with internal budgeting, the process has also garnered OCC funding support from the outside. "It's been of benefit in presenting capital outlay capital outlay See capital expenditure. documentation to the state," Brantley reports. "It documents why we need funds. We had to go back to the citizens to increase the millage mill·age n. A tax rate on property, expressed in mills per dollar of value of the property. . Without this information, it probably would have been difficult to convince people of the need." The facilities assessment approach presented here is only a starting point. Reducing an institution's deferred maintenance backlog is not a one-time expense. It requires that a well-coordinated, funded plan be put in place to maintain the facilities once they have been repaired-or time will again take its toll. How Do Your Buildings Rate? The Association of Higher Education higher education Study beyond the level of secondary education. Institutions of higher education include not only colleges and universities but also professional schools in such fields as law, theology, medicine, business, music, and art. Facilities Officers, the organization whose standards were used to develop a system of facility assessment, offers three categories based on the Facilities Condition Index (FCI) of any given building. The FCI (see step #8 above) is the doLlar vaLue of a One-Year Deferred Maintenance Backlog divided by the current replacement value (CRV) of the building. The association recommends that the FCI not exceed 5 percent for the buiLding to be considered in "Good" condition. If the figure is between 5 and 10 percent, the buiLding is considered to be in "Fair" condition; if it is 10 percent or more, the building is considered to be in "Poor" condition. Marjorie K. Simmons is managing partner of DSA Architects (a member of the SHW SHW Sherwin-Williams Company (stock symbol) SHW Slide Show (file extension) SHW Super Heavy Weight SHW System High Workstation SHW Shortest Hop Win (throughput scheme) Group in Dallas) and has a background in accounting and information systems. Anthony R. Duce, senior vice president of DSA Architects, has worked on higher education projects over more than three decades. They can be reached by visiting www.dsa.shwgroup.com. |
|
||||||||||||||||

Printer friendly
Cite/link
Email
Feedback
Reader Opinion