Printer Friendly
The Free Library
18,914,768 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

MR3 Systems Announces Execution of Land Lease for MR3 Taiwan Metals Processing Plant - Reports On Empire Gold Project Progress.


Business Editors/High-Tech Writers

SAN FRANCISCO--(BUSINESS WIRE)--Jan. 28, 2003

MR3 Systems, Inc., (NQB NQB National Quotation Bureau, Inc (now Pink Sheets) :MRMR MRMR Mining Rock Mass Rating
MRMR Mobilization Reserve Materiel Requirement
) announced today that on January 23, 2003, its affiliate, MR3 Systems Taiwan Co., LTD LTD 1 Laron-type dwarfism 2 Leukotriene D 3 Long-term depression, see there 4. Long-term disability , executed a 20-year land lease for 2.5 acres of industrial land upon which its 80,000 square foot MR3 Processing Facility will be constructed. Located in the Zhang Bing Coastal Industrial Park south of Taipei, this new MR3 Facility is scheduled to be completed and fully operational by the end of 2003. MR3 Taiwan continues to project $70M in net annual revenues from this plant when it reaches full capacity in 2006. The lease includes an option to purchase the property at any time during the term.

The MR3 plant will process metals wastes generated from Taiwan's electroplating electroplating: see plating.
electroplating

Process of coating with metal by means of an electric current. Plating metal may be transferred to conductive surfaces (e.g., metals) or to nonconductive surfaces (e.g.
, metal finishing, and printed circuit board industries into high purity specialty metals chemical products such as Potassium Dichromate potassium dichromate
n.
A bright yellowish-red crystalline compound, K2Cr2O7, used as an oxidizing agent, and in pyrotechnics, explosives, and safety matches.

Noun 1.
, Nickel Sulfate sulfate, chemical compound containing the sulfate (SO4) radical. Sulfates are salts or esters of sulfuric acid, H2SO4, formed by replacing one or both of the hydrogens with a metal (e.g., sodium) or a radical (e.g., ammonium or ethyl). , Copper Sulfate and Zinc Sulfate for sale in domestic and international markets.

In addition to the Zhang Bing Facility, over the next 5 years MR3 Taiwan plans to construct at least 3 additional MR3 facilities, and to expand into markets such as soil remediation and incinerator ash treatment. These MR3 plants will be built to accept and treat industrial wastes such as metal hydroxide hydroxide (hīdrŏk`sīd), chemical compound that contains the hydroxyl (−OH) radical. The term refers especially to inorganic compounds.  sludges, fly ashes, spent etchants, and ion exchange ion exchange
n.
A reversible chemical reaction occurring between an insoluble solid and a solution during which ions may be interchanged, used in the separation of radioactive isotopes.
 regenerants from a wide range of other industries including Plastic Ball Grid Array “BGA” redirects here. For other uses, see BGA (disambiguation).

A ball grid array (BGA) is a type of surface-mount packaging used for integrated circuits.
 (PBGA PBGA Plastic Ball Grid Array ) manufacturing, metal foundries, municipal/industrial trash incineration incineration

the act of burning to ashes.
, surface finishing, semiconductor fabrication fabrication (fab´rikā´shn),
n the construction or making of a restoration.
, TFT-LCD TFT-LCD Thin Film Transistor - Liquid Crystal Display  and other opto-electrical manufacturing.

MR3 Taiwan is the first territorial project of the Joint Venture entered into April 10, 2002, between MR3 Systems, Inc., and Linsa Associates, Ltd., to commercialize the MR3 Technology in Canada, Australia, Asia and the Middle Eastern Territories. Linsa continues to project that within five years the potential annual net revenue from these territories will exceed $500M, which MR3 shares with Linsa on a 50/50 basis. The near term plans for the Joint Venture include further expansion in Taiwan and into the Japanese and Mainland China markets.

Randall S. Reis, MR3's Chairman and CEO (1) (Chief Executive Officer) The highest individual in command of an organization. Typically the president of the company, the CEO reports to the Chairman of the Board. , stated "MR3 Taiwan has finally reached this milestone and is proceeding with the construction of its new MR3 Facility. This comes after many months of delays in obtaining equity and plant financing due to last year's difficult investment climate in the global economy. We are looking forward to a more accelerated expansion of our Linsa Joint Venture operations to take advantage of the attractive opportunities available for the MR3 Technology in these markets."

MR3 also reported on the progress of its gold ore processing activities at the Grace Gold Mine Complex in Empire, Colorado, and its MR3 facility to open in Denver, Colorado. On October 23, 2002, the Company entered into an MR3 Metals Extraction Agreement with the owner of the Grace Complex to process over 1,000,000 ounces of gold ore reserves and to share the net revenues from the gold sales on a 50/50 basis. MR3 is on schedule to complete the preliminary tasks of sampling, laboratory testing, gold media development, mining and zoning permits, water rights acquisition, grade control program planning, equipment purchase and Denver Facility build out. Early 2Q03, the Company should complete the equipping and testing of the new MR3 processing plant in Denver and the gravity concentration system for the Empire Site. Weather permitting, MR3 is scheduled to begin processing gold bars Gold bars

Bars with a minimum content of 99.5% gold, which may be held by central banks or traded by investors.
 in the Denver facility in 2Q03. Once the Empire Project reaches full capacity in 1Q04 the Company expects to be processing approximately 500 ounces of gold per day, equal to annual sales of over $40M at a price of $320. per ounce.

The MR3 Denver facility will be capable of processing several times the amount of ore it receives from the Empire Project. MR3 will actively solicit additional sources of gold and other precious metals Precious Metals

Valuable metals such as gold, iridium, palladium, platinum, and silver.

Notes:
Investing in precious metals can be done either by purchasing the physical asset, or by purchasing futures contracts for the particular metal.
 in the Colorado area for processing at Denver once the MR3 System is in operation and demonstrating its capabilities. The Company is also exploring other metals opportunities in Nevada, including one potential mine that claims high concentrations of gold, platinum and palladium which MR3 has sampled and begun testing.

In other corporate matters, the Company reports that it is completing its year-end audit and expects to file its amendment to Form 10 with the SEC by the end of 1Q03. MR3 also announced that Larry Hopper, former President and COO, is no longer employed by the Company and MR3 has closed its Pittsburgh, PA, offices. The Pittsburgh functions have been moved and consolidated in the San Francisco and Denver offices. The Company has hired Jody Sitkoski as its new Senior Vice President to manage all domestic operations. According to Mr. Reis, "these moves are necessitated by the Company's change of primary focus to the gold and other precious metals applications for the MR3 Technology. We believe this focus will be substantially more profitable for MR3 than the specialty chemical applications, which will now be licensed out to qualified licensees. Mr. Sitkoski, age 43, is a Denver area resident and a long-time shareholder and consultant to our Company. He has been instrumental in directing us into precious metals opportunities in Colorado and Nevada. He also played a critical role in the Empire Project negotiations and implementation. We are looking forward to his management skills, high energy and ability to work with the technical, operations, partner relations, sales, financial and new business development functions of MR3."

MR3 is a high-tech, state-of-the-art metals extraction and separation technology capable of converting hazardous liabilities into non-hazardous, profitable assets through the processing of industrial wastes and other complex metals sources into pure metals and specialty chemical products. The Company believes this to be the only technology available that can selectively and individually remove and purify all targeted metals from aqueous solutions economically on a commercial scale

Certain statements contained in this press release are forward-looking statements within the meaning of federal securities laws. These statements are based largely on the Company's expectations and are subject to certain risks and uncertainties, many of which are beyond the Company's control. These include changes in the prevailing prices of chemical products and gold, the grade of ore mined and unforeseen difficulties in MR3 processing and mining operations that could affect revenues and costs.
COPYRIGHT 2003 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2003, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Geographic Code:9TAIW
Date:Jan 28, 2003
Words:1045
Previous Article:Etnus TotalView 6.0 Provides Improved Sun Microsystems Support.
Next Article:WJ Communications Announces Fourth Quarter Results.



Related Articles
Inland Empire leasing slows as job growth declines: demand remains high for tracts of manufacturing land. (Inland Empire area of California...
Inland Empire industrial market sees some action. (Special Section: Quarterly Real Estate) (Industry Overview)
Inland Empire industrial space gets hot in early '94; first-quarter deals total more than 2.7 million square feet. (California) (Real Estate)
Inland Empire, San Gabriel attract large distributors. (industries in InlandEmpire and San Gabriel Valley, California)(California Economic...
Demand for warehouses sparks development flurry. (Los Angeles, California)(Real Estate Quarterly)
New Projects Reflect Wave Of Demand in Hot Market.(Brief Article)(Statistical Data Included)
State issues RFP for two Brooklyn sites.(request for proposals)(Brief Article)
Nostalgic Burbank Empire Center has air of success. (Real Estate Special Report -- L.A. Turns Inward).(Brief Article)
Manufacturing reliability track.(PIMA ASSOCIATION NEWS)(Calendar)
Solitario Resources Corporation.(surface exploration plans in Mexico and South America)(Brief Article)

Terms of use | Copyright © 2010 Farlex, Inc. | Feedback | For webmasters | Submit articles