MHI to supply Nine Dragons.Mitsubishi Heavy Industries, Ltd. (MHI MHI Manufactured Housing Institute MHI Montreal Heart Institute (Montreal, Quebec, Canada) MHI Median Household Income MHI Main Hawaiian Islands MHI Material Handling Institute ), Tokyo, Japan, received two paperboard production machine orders from Nine Dragons Paper, Dongguan-city, Guangdong, China. This represents the first paperboard grade machines ordered from MHI for paper production in China. The first order includes the headbox, former, press, and reel for a new linerboard production machine at Nine Dragon's new Taicang Mill located near Shanghai. The second is for the press unit of a white paperboard production machine under construction at the existing Dongguan-city mill. In other news, MHI's unit in Beloit, Wisconsin, USA, said that CMCP CMCP Canadian Museum of Contemporary Photography CMCP Certified Managed Care Professional CMCP Musée Canadien de la Photraphie Contemporaine (Canadian Museum of Contemporary Photography) CMCP Critical Manufacturing Control Point Kenitra has selected MHI to supply a shoe press rebuild for its PM3. This machine produces fluting fluting (floo´ting), n the elongated developmental depressions along the root branches of tooth root surfaces of certain teeth. and testliner over a basis weight range of 80 to 280 gsm at a trim of 2550 mm. The machine speed after rebuilding will increase from 450 to 600 MPM MPM Multi-Processing Module (Apache) MPM Manufacturing Process Management MPM Milwaukee Public Museum MPM MMW (Millimeter Wave) Power Module MPM Master of Project Management (degree) . MHI will also rebuild the wet end of PM5 at Visy Paper Pry Ltd, Coolaroo Australia. This machine produces white top linerboard and corrugating medium. The rebuild will consist of a primary and secondary MH Headbox C-IV C-IV Schedule IV Controlled Substance (USA) . The primary has consistency profiling. Also included are a high capacity top former with fourdrinier extensions of the bottom and mini fourdriniers. This mill purchased its first MH Headbox G-IV in 2001. Delivery will be August 2003. |
|
||||||||||||||

Printer friendly
Cite/link
Email
Feedback
Reader Opinion