Lean now--using a research community to understand change in the acquisition enterprise.Members of the Lean Aerospace Initiative (LAI LAI Leaf Area Index LAI Lean Advancement Initiative (MIT) LAI Lean Aerospace Initiative LAI Long-Acting Injection LAI Lambda Alpha International (honorary land economics society) ) consortium have joined to pool experience and expertise to accelerate the adoption of Lean practices in military acquisition through an initiative called Lean Now. Lean Now has demonstrated that the concept of industry and government teaming for focused interventions can produce savings and accelerate change in the acquisition process. It also represents a systematic change method that lends itself to data collection and theory development. This paper outlines some of the findings to date, as well as implications for using such a model for research on the military acquisition system. ********** Acquisition system improvement (the term acquisition reform is also used) has been an imperative since the earliest days of the U.S. military. In the 20th century, several movements, often involving expert commissions or panels, sought to improve the performance, relevance, and adaptability of an increasingly large, complex, and bureaucratic bu·reau·crat n. 1. An official of a bureaucracy. 2. An official who is rigidly devoted to the details of administrative procedure. bu system (McKinney, Gholz, & Sapolsky, 1994). Most of these efforts used a top-down approach Top-down approach A method of security selection that starts with asset allocation and works systematically through sector and industry allocation to individual security selection. to change. Many other, less visible attempts to improve the acquisition system have used a bottom-up approach, focusing at the level of practitioner in an attempt to foster systemic change through the diffusion of best practice. This paper is about one such initiative, and how it is lending itself to research and insights about improvement processes in the complex government acquisition system. In August 2002, the Lean Aerospace Initiative (LAI) Executive Board committed to help the government apply lessons learned from Lean implementation within its own operations. The industry partners of LAI had already started on the path to Lean in the mid-1990s and were making significant improvements, mostly in production and manufacturing operations Manufacturing operations concern the operation of a facility, as opposed to maintenance, supply and distribution, health, and safety, emergency response, human resources, security, information technology and other infrastructural support organizations. . The purpose of the Lean Now initiative was to accelerate transformation of the total government/industry enterprise by: * Eliminating barriers that impede im·pede tr.v. im·ped·ed, im·ped·ing, im·pedes To retard or obstruct the progress of. See Synonyms at hinder1. [Latin imped progress. * Focusing on the interface processes between government and industry. * Using the LAI venue to facilitate government/industry collaboration and teamwork. * Leveraging the collective knowledge and efforts of government and industry. In October 2002, candidate government/industry processes and programs that exemplified them were selected. They were the F/A-22 Test and Evaluation process, the F-16 Contract Closeout closeout, closure the finalization of a feeding program in a feedlot. The cattle are sold and a balance sheet is struck which includes the costs of feeding and housing or confining them. process, and the Global Hawk Evolutionary Acquisition processes. The prototypes were to prove if the Lean Now concept of focusing on government/industry interfaces was feasible. It was hoped that the results and lessons learned from the prototype programs could be applied to other Air Force programs and possibly throughout the Department of Defense (DoD). Lean Now fully availed itself of the resources of the LAI consortium. It was truly a partnership between government, industry, and academia. Through the LAI venue, Massachusetts Institute of Techology (MIT MIT - Massachusetts Institute of Technology ) provided the knowledge and research-based tools; the industry partners provided the practical experiences of its best Lean Subject Matter Experts (SMEs) to kick-start and accelerate the government's transformation. Industry agreed to provide SMEs for the first year of Lean Now to train and mentor the prototype programs. This would give the Air Force a chance to learn from industry experts, while building its own infrastructure of Air Force Lean SMEs. To help the Air Force become self-sufficient in Lean, MIT and the LAI industry partners are also developing an Air Force SME (1) (Small and Medium-sized Enterprise) See SMB. (2) (Subject Matter Expert) An individual who is well-versed in the policies and procedures of a particular department or division. training course. In addition to being a vehicle for accelerating the adoption of Lean in government acquisition processes, Lean Now represents an ideal opportunity to pursue research in the style of action research (Argyris, Putnam, & Smith, 1985). Action research is focused on understanding and creating knowledge about social interventions and change. If successful, the knowledge it produces can be used to aid future implementation activities, to advance theory about change, and to better understand the nature of systems being changed to more thoughtfully construct models of alternative future states. This approach is especially cogent COGENT - COmpiler and GENeralized Translator to complex systems such as the military acquisition process, with its multiple interdependent in·ter·de·pen·dent adj. Mutually dependent: "Today, the mission of one institution can be accomplished only by recognizing that it lives in an interdependent world with conflicts and overlapping interests" stakeholders Stakeholders All parties that have an interest, financial or otherwise, in a firm-stockholders, creditors, bondholders, employees, customers, management, the community, and the government. . While Lean Now began with a push to jump-start the adoption of Lean principles and practices in the U.S. Air Force, it is beginning to yield new insights not only into change processes in the acquisition system, but also the structure and behavior of the system itself. Moreover, because it is proceeding using a relatively structured process, it lends itself well to systematic study. This paper will discuss early findings from Lean Now (this report documents only the beginning of what could eventually be a multi-year experiment). It will finish by discussing its implications for future acquisition research activities. INTERVENTION METHOD A common method for intervening in a Lean Now engagement is emerging based on the combined experience of the LAI SMEs and its application to date. This method has three distinct phases: (1) Set-up Phase, (2) Planning Phase In amphibious operations, the phase normally denoted by the period extending from the issuance of the order initiating the amphibious operation up to the embarkation phase. The planning phase may occur during movement or at any other time upon receipt of a new mission or change in the , and (3) Execution and Follow-through. Within each phase are distinct steps that must occur in order for the Lean initiative to be successful. Figure 1 presents the three phases and their respective steps. [FIGURE 1 OMITTED] The first step in the Set-up Phase involves acquiring leadership support, setting the vision, strategy, and goals of the initiative, and ensuring the organization has the infrastructure to support the initiatives. This infrastructure includes having a Lean SME and a Lean training curriculum. The Lean Now projects relied on LAI's industry partners for their support infrastructure. The Planning Phase comes next. The first step is to choose the area of focus. Several methods were used: (1) pick the program with the greatest sense of urgency, (2) use a decision matrix, (3) use the value stream map (VSM VSM Value Stream Mapping (manufacturing process evaluation technique) VSM Vibrating Sample Magnetometer VSM Vascular Smooth Muscle VSM Visual Studio Magazine VSM Vietnam Service Medal VSM Virtual Shared Memory VSM Viable Systems Model ), or (4) have someone else choose it for you. The next step is to choose the initiative's team leader. The team leader must be knowledgeable and experienced in the processes to be examined, a good communicator, open to new ideas "New Ideas" is the debut single by Scottish New Wave/Indie Rock act The Dykeenies. It was first released as a Double A-side with "Will It Happen Tonight?" on July 17, 2006. The band also recorded a video for the track. , and possess the ability to juggle many things at once. Once the team leader is chosen, he or she meets with the Lean Subject Matter Expert to discuss the project, its goals, resource availability and constraints, and any possible barriers to implementation. They also plan the Lean event, including the team training requirements and the Lean methods and tools to be used during the event. They then choose the Lean team. All stakeholders must have a representative on the team. In order to make the team effective, each team member must have a practical experience in the process to be examined and have the backing of his or her leadership. After these steps are complete, it is possible to hold a Lean event. Depending on the event, the Lean SME will facilitate the team's use of the appropriate Lean tools and methodologies. After the Lean event, the team leader must ensure each member of the team follows through on his or her assigned action items. The team leader is also responsible for communicating the status of the initiative to the organization or enterprise leadership. As the results from the Lean initiative begin to materialize, it is important to apply any feedback or lessons to continuously improve the process. These lessons are also continuously collected, documented, and shared throughout the organization and enterprise. Because the process for intervention is becoming standardized standardized pertaining to data that have been submitted to standardization procedures. standardized morbidity rate see morbidity rate. standardized mortality rate see mortality rate. , the findings of the Lean Now events lend themselves well to systematic empirical study. With the foundation of a standard intervention method, variables can be manipulated to produce research designs that create knowledge and advance theory about system change. FINDINGS Summaries of each of the three prototype projects presented below provide a context for Lean Now and its activities. A set of general observations describes some of the key lessons learned and concludes this section. F/A-22 Lean Now was proposed as a way to help the F-22 program in meeting its cost, schedule, and performance expectations, specifically involving the test and evaluation process. The Operational Flight Program (OFP OFP Operation Flashpoint (computer game) OFP Office of Family Planning OFP Order for Protection OFP Organizacion Feminina Popular (Spanish: Popular Women's Organization; Columbia) ) Preparation and Load process at the F/A-22 Combined Test Force (CTF CTF Capture The Flag CTF Child Trust Fund (UK) CTF Canadian Tax Foundation CTF Canadian Taxpayers Federation (lobby group) CTF Canadian Television Fund CTF Canadian Teachers' Federation ) at Edwards Air Force Base Edwards Air Force Base, U.S. military installation, 301,000 acres (121,805 hectares), S Calif., NE of Lancaster; est. 1933. It is one of the largest air force bases in the United States and has the world's longest runway. (AFB AFB abbr. acid-fast bacillus AFB Acid-fast bacillus, also 1. Aflatoxin B 2. Aorto-femoral bypass ) was selected by the F-22 Enterprise Lean Team. The OFP is the software that runs the systems on the F/A-22 and is highly dependent on the hardware configuration of the aircraft. The test aircraft are configured according to according to prep. 1. As stated or indicated by; on the authority of: according to historians. 2. In keeping with: according to instructions. 3. the test they have to perform. As testing progresses, new OFPs and new hardware configurations are generated, with a resulting challenge of keeping track of the many OFP versions/aircraft configurations and quickly reconfiguring test aircraft as changes arise. This challenge prevented the F/A-22 test program from generating test sorties in a timely fashion. A team assembled at the F/A-22's Combined Test Force at Edwards AFB and first did a VSM of the existing OFP Prep and Load process and identified many issues that caused delays and rework re·work tr.v. re·worked, re·work·ing, re·works 1. To work over again; revise. 2. To subject to a repeated or new process. n. . By the end of the week, the team articulated the desired end state of their OFP process and generated 144 improvement suggestions to help get to this future state. The team returned to their respective jobs to start implementing the changes identified during the VSM exercise. Prior to Lean Now, the OFP Prep and Load process took between 60 and 90 days. The results of the initial suggestions lowered the time to 3 to 4 weeks. Through continuous improvement, the OFP Prep and Load time is now approximately 7 hours. The F/A-22 CTF was so compelled by the results of the OFP Prep and Load Lean project that they held another VSM event that identified 20 projects for the F/A-22 enterprise. These projects included eliminating multiple identification numbers for the same part, better managing test asset and pilot availability to ensure fewer deviations from the test plan, reducing finishes rework after flightline Flightline can refer to:
GLOBAL HAWK The Global Hawk is the U.S. Air Force's long range, unmanned, intelligence, surveillance, and reconnaissance An activity that synchronizes and integrates the planning and operation of sensors, assets, and processing, exploitation, and dissemination systems in direct support of current and future operations. This is an integrated intelligence and operations function. Also called ISR. (ISR (Interrupt Service Routine) Software routine that is executed in response to an interrupt. ) platform. The program has a very aggressive spiral acquisition approach that challenged its development schedule because of the time it took to put a new spiral on contract. One of the Lean Now project's foci was to reduce the cost and lead time of the platform's subsystems, while another was decreasing the time to put a new capability spiral on contract. The Global Hawk System Program/Project Office (SPO SPO System(s) Program Office SPO System(s) Project Office Spo Schizosaccharomyces Pombe SPO Srpski Pokret Obnove ), Northrop Grumman Northrop Grumman Corporation (NYSE: NOC) is an aerospace and defense conglomerate that is the result of the 1994 purchase of Grumman by Northrop. The company is the third largest defense contractor for the U.S. , and Raytheon chose to tackle the Integrated Sensor Suite (ISS ISS See Institutional Shareholder Services (ISS). ) in the first event. The ISS costs as much as the airframe and engines and has an 18-month lead time. The ISS Lean team completed a value stream map of the current ISS production process from request for proposal to first flight. Through the use of the VSM, the team established a plan that increased the production capacity from 3 per year to 6 per year, with a savings of $2 million per ISS. Other potential opportunities for further decreasing cost and production time were found, which the team is currently exploring. A value stream map of the Integrated Communications Suite (ICS (1) (Internet Connection Sharing) A Windows feature that enables two or more computers to share one Internet connection. First introduced in Windows 98 Second Edition, sharing is accomplished with network address translation (NAT), which is the common method. ) helped identify opportunities to eliminate $3.6 million of specialize test equipment and reduce lead time between 2 to 3 months. This was done by eliminating unnecessary specialized test equipment and identifying the need for other test equipment to accelerate the transition to production. It also identified possible lifecycle cost savings from using common modules and open systems architecture. Finally, value stream mapping Value Stream Mapping is a Lean technique used to analyse the flow of materials and information currently required to bring a product or service to a consumer. At Toyota, where the technique originated, it is known as "Material and Information Flow Mapping" [1]. of the Alpha Contracting process identified means to reduce the average time to produce a formal proposal from 265 man-days to 166 man-days. The Global Hawk team continues its work on the ISS, ICS, and Alpha Contracting projects to further reduce cost and cycle time. It is finding that in order to make further headway head·way n. 1. Forward movement or the rate of forward movement, especially of a ship. 2. Progress toward a goal. 3. The clear vertical space beneath a ceiling or archway; clearance. 4. , stakeholders such as Air Force Materiel Command Air Force Materiel Command (AFMC) is a major command of the United States Air Force. , the Defense Finance Accounting Service, and the
Defense Contract Management Agency must also be involved in the process.F-16 The F-16 Lean Now team chose to focus on the Contract Closeout process, and specifically, inactive contracts. Contract closeout is the activities associated with reconciling the terms of the contract with the products and services delivered. The process is long (on the order of 8 to 10 years) and is very resource intensive. There is currently a backlog of approximately 1,200 Lockheed Martin For the former company, see . Lockheed Martin (NYSE: LMT) is a leading multinational aerospace manufacturer and advanced technology company formed in 1995 by the merger of Lockheed Corporation with Martin Marietta. inactive contracts for the F-16, with some dating back to the late 1970s. The goal of the F-16 Lean Now initiative was to reduce the cycle time to close a contract, increase the efficiency and reduce the resources required, and to eliminate the backlog of contracts that are currently inactive yet remain open. Even before the Lean Now initiative, the F-16 program had been working to close the backlog of inactive contracts and made significant gains in the Contract Closeout process. By the end of the four-day value-stream mapping event, the team realized that their proposed changes did little to reduce the time to closeout contracts. Process stakeholders at a higher level would have to become engaged. Based on the first event, the Lean Now SMEs held another Contract Closeout event involving higher-level stakeholders that identified 12 viable initiatives, including establishing one Defense Finance and Accounting Service The Defense Finance and Accounting Service (DFAS), an agency of the United States Department of Defense, provides finance and accounting services for the military and other members of defense. In FY 2004, DFAS:
DFAS Decorative and Fine Arts Society (The Hague, Holland) DFAS Dark Field Alignment System DFAS Department of Fisheries and Aquatic Sciences ) point of contact for the contract, expand Defense Contract Management Agency (DCMA DCMA Defense Contract Management Agency DCMA Dhow Countries Music Academy DCMA Dade County Medical Association DCMA Dry Color Manufacturers Association DCMA Defense Contract Management Association DCMA Data-Driven Cut-Through Multiple Access ) Q Final authority to cover fixed-price contracts, automation of work order generation process for contracts entering an annual audit phase, and aligning subcontractor One who takes a portion of a contract from the principal contractor or from another subcontractor. When an individual or a company is involved in a large-scale project, a contractor is often hired to see that the work is done. contracts actions with contractor contract actions. If all 12 initiatives can be implemented successfully, the projected minimum cost avoidance Cost avoidance is a management accounting term referring to an expense one has avoided incurring. It is commonly used in the field of energy management to describe the energy costs you avoided due to energy management initiatives. to the F-16 program is $2.4 million and an estimated cycle time reduction between 3 to 7 years. Several of them have been completed or are underway with some dovetailing work by senior leadership at the U.S. Air Force Aeronautical aer·o·nau·tic also aer·o·nau·ti·cal adj. Of or relating to aeronautics. aer o·nau System Center, the DoD, or Congress.GENERAL OBSERVATIONS Lean Now's first spiral of programs proved the feasibility of a government-industry focus on process interfaces to create useful change. Each of the projects was success-oriented; they were not likely to fail to produce positive results. Consequently, it is challenging to identify clear success factors leading to superior outcomes. Nevertheless, there was sufficient variation in how each of the projects proceeded compared with the standard process and in the outcomes to note a few key differences. A more detailed exploration of those observations can be found in the report by Jobo (2003). Of distinction among the many observations that emerged from the experience with the prototype projects were characteristics of both leadership and of the teams (shown in Table 1). The first three Lean Now prototypes had support from very senior Air Force leaders. This allowed the enterprise leaders and Lean teams the opportunity to take risks and try options never before considered--they knew it was okay to make mistakes. At more tactical levels, it was important that local leaders provided clear direction for how the Lean project fit into strategic plans and would help the organization achieve its strategic objectives. Lacking that, teams were more likely to have Lean events without the necessary follow-through to achieve compelling changes to enterprise processes. As such, leadership played a key role in follow-up to ensure the team stayed motivated and completed action items resulting from the Lean activities. While part of this involved the specific actions of the leaders of the initiative, it also played out in the degree to which the team was able and had the resources to manage or change the processes within their collective control. The importance of team composition was demonstrated on multiple occasions. It was important that stakeholders in the process be represented, and their values defined so that they could articulate clear objectives to focus their efforts. The VSM exercises were important to not only identify underlying process flows, but also to identify the interdependencies among stakeholders that when dysfunctional could lead to ineffective communication, hand-offs, or other sources of waste in the system. The act of value stream mapping was in many cases a key communication process for uniting these groups that otherwise had not previously met. Whatever the final outcome of these first three Lean Now prototypes, it is safe to say Lean has made an impact on the F/A-22, Global Hawk, and F-16 programs. The real value of Lean Now to date may not be the discrete results achieved as much as it represents the first steps in the building of an infrastructure for change and transformation. This effect is seen in the number of additional improvement events that were spawned by the initial interventions, and by the skeptical participants who through the process became dedicated advocates. RESEARCH IMPLICATIONS To date, the primary efforts associated with Lean Now have involved creating and standardizing the intervention method, deploying the SMEs and conducting the actual events, and documenting the outcomes. In a sense, Lean Now might represent the earliest phases of an action research program. More complete documentation of results and presentation to academic and peer research audiences lies ahead, as well as more active involvement in defining the subjects and content of the interventions. Even though it is in its early days, Lean Now already represents a significant investment of time and resources on the part of several individuals and organizations. From a research standpoint, this implies a significant up-front investment in creating the research context prior to doing the research. In this regard, undertaking a project such as Lean Now may not be appropriate or feasible for all researchers. Nevertheless, because of the unique nature of this activity, it represents a compelling venture for study that has already begun to produce results consistent with the aims of traditional action research. Lean Now has captured knowledge from a variety of sources on how to have successful organizational change intervention, and demonstrated its successful diffusion in a variety of contexts. Additional facilitators have been trained using these materials, and the number of active Lean Now projects has increased dramatically, most importantly Adv. 1. most importantly - above and beyond all other consideration; "above all, you must be independent" above all, most especially in the form of initiatives spawned from the initial events and based on local demand. From a theory development perspective, the preliminary nature of Lean Now means that there are still many more questions than answers. Lean Now events have grappled directly with the challenge of scalability--whether a technique with origins in group-level interventions can work successfully in enterprises spanning multiple organizational boundaries. An important next step might be, for instance, to manipulate the organizational scope of the intervention as a research design variable to help leaders understand the level of resource commitment required for a given intervention. There is much yet to be learned about how these organizations, especially those with distributed functions The distribution of processing functions throughout the organization. (as is often the case with defense acquisition) learn, adapt, and share new knowledge. Perhaps the most interesting challenge is to understand ultimately how effective this form of organizational intervention can be as a bottom-up attempt to transform a complex system that has seen so many top-down change imperatives come and go. ACKNOWLEDGMENTS Many people and organizations have made significant commitments of time, energy, and resources to the success of Lean Now. Any list of participants would be incomplete and unrepresentative Adj. 1. unrepresentative - not exemplifying a class; "I soon tumbled to the fact that my weekends were atypical"; "behavior quite unrepresentative (or atypical) of the profession" of actual contributions, and that list is growing with each passing event. Nevertheless, the efforts of Terry Bryan (Raytheon), Tracy Houpt (Lockheed Martin), Wes Switzer (Boeing), Rob Goetz (Northrop Grumman), and Thomas Winfield (Raytheon) deserve special recognition for the time, devotion, and professionalism exhibited in initiating and sustaining the Lean Now engagements mentioned in this article. REFERENCES Argyris, C., Putnam, R., & Smith, D. M. (1985). Action science. San Francisco San Francisco (săn frănsĭs`kō), city (1990 pop. 723,959), coextensive with San Francisco co., W Calif., on the tip of a peninsula between the Pacific Ocean and San Francisco Bay, which are connected by the strait known as the Golden : Jossey Bass. Jobo, R. (2003, August). Applying the lessons of 'Lean Now' to transform the U.S. aerospace enterprise. Lean Aerospace Initiative. Cambridge, MA: Massachusetts Institute of Technology Massachusetts Institute of Technology, at Cambridge; coeducational; chartered 1861, opened 1865 in Boston, moved 1916. It has long been recognized as an outstanding technological institute and its Sloan School of Management has notable programs in business, . McKinney, E., Gholz, E., & Sapolsky, H. (1994, May 24). Acquisition reform (White paper #94-03). Lean Aerospace Initiative. Cambridge, MA: Massachusetts Institute of Technology. AUTHOR BIOGRAPHIES Eric Rebentisch, Ph.D., is a research associate at the Massachusetts Institute of Technology working in the Lean Aerospace Initiative. His core research interest focuses on developing and managing core capabilities in complex organizations. This has translated into research activities in knowledge management, international technology and knowledge transfer, intellectual capital management, the management of long-term institutional change, the fuzzy front end of product development, subsystem commonality com·mon·al·i·ty n. pl. com·mon·al·i·ties 1. a. The possession, along with another or others, of a certain attribute or set of attributes: a political movement's commonality of purpose. , and strategies for managing in an unstable environment. (E-mail address See Internet address. e-mail address - electronic mail address : erebenti@mit.edu) Major Ronald S. Jobo, USAF, was the 2002 Air Force Fellow at the Massachusetts Institute of Technology's Lean Aerospace Initiative. He is currently serving as the Affordability and Lean Integrated Product Team (IPT IPT - IP Telephony ) lead at the Global Hawk System Program Office at Wright-Patterson AFB Ohio. He holds a bachelor's degree in astronautical engineering Astronautical engineering The engineering aspects of flight and navigation in space, also known as astronautics. Astronautical engineering deals with vehicles, instruments, and other equipment used in space, but not with the sociological or economic aspects of from the U.S. Air Force Academy and a master of business administration from Wright State University. (E-mail address: ronald.jobo@wpafb.af.mil An Internet address domain name for a military agency. See Internet address. (networking) mil - The top-level domain for entities affiliated with US armed forces. )
TABLE 1. BEHAVIOR FOR LEADERSHIP AND TEAM MEMBERS
FOR SUCCESSFUL LEAN INTERVENTIONS
Leadership Involvement * Long-term thinking and strategic vision.
for Successful * Provides strategic direction and objectives
Lean Implementation * Provides momentum for change.
* Provides resources for implementation.
* Provides the credibility and consistency of
method for change.
* Empowers project teams.
Team Involvement * Members must possess the correct level of
for Successful authority for the given event.
Lean Implementation * Members must possess the correct level of
expertise for the given event.
* Members must be open to new possibilities.
|
|
||||||||||||||||||||

Air Force Materiel Command (AFMC) is a major command of the United States Air Force.
o·nau
Printer friendly
Cite/link
Email
Feedback
Reader Opinion