Printer Friendly
The Free Library
21,610,989 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

Latest tenders.

(Category: Business )

(Image: )

OGN OGN Original Graphic Novel (publishing)
OGN Operation Good News
OGN Opera Glass Networks
 brings you the latest tenders available in the Gulf region and beyond.

QATAR EPC (1) (Entertainment PC) See HTPC.

(2) (Electronic Product Code) A standard code for RFID tags administered by EPCglobal Inc. (www.epcglobalinc.org).
 to replace fire and gas system Tender no: LT08109600 Description: EPIC to replace fire and gas system in NGL NGL - A dialect of IGL. 2, storage and loading Mesaieed. Bid bond: QR50,000, Fee: QR200 Details: Qatar Petroleum (QP), Contracts Department, Corporate Division, PO Box 3212, 4th Floor, (RoomG13), Doha, Qatar. Tel: +974 4774324 Closing date: November 23

EPC of two new glycol regeneration Tender no: GT08113100 Description: Engineering, procurement, installation, construction of two new glycol regeneration at FSP FSP - File Service Protocol  Dukhan. Bid bond: QR500,000, Fee: QR500 Details: Qatar Petroleum, Contracts Department, Engineering Division, PO Box 3212, Danan Tower, 3rd Floor, Room No 309, Doha, Qatar. Tel: +974 4774324 Closing date: November 30

Tofd and corrosion mapping Tender no: LT08109800 Description: Time of flight diffraction, corrosion mapping call of services for NGL & NFA NFA - Finite State Machine . The scope of services is to carry out time of flight diffraction (TOFD), corrosion mapping and ultrasonic inspections on prepared and cleaned static equipment pressure vessels and pipelines on a call off basis for NGL facilities, Mesaieed and NFA offshore platform. Bid bond: QR35,000, Fee: QR200 Details: Qatar Petroleum, Contracts Department, Operations Division, PO Box 3212, Royal Plaza, G Wing, 4th Floor, (Room No G13), Doha, Qatar. Tel: +974 4774324 Closing date: November 18

SAUDI ARABIA Replacement of pipeline Tender no: Y/M/P/0023 Description: Replacement of cooling sea water supply and return pipeline with FRP FRP Fremskrittspartiet (Norwegian: Progress Party; political party)
FRP Fiberglass-Reinforced Plastic
FRP Fiber Reinforced Polymer
FRP Fibre Reinforced Polymer
FRP Fleet Response Plan (US Navy) 
 pipes at Phase-1 of Yanbu plants. Bid bond: Not mentioned, Fee: SR500 Details: Saline Water Conversion Corporation (SWCC SWCC Saline Water Conversion Corporation (Saudi Arabia)
SWCC Special Warfare Combatant-craft Crewmen (US Navy)
SWCC Special Warfare Combatant-craft Crewman
SWCC South Wales Caving Club
), PO Box 5968, Riyadh 11432, Saudi Arabia. Tel: +9661 4630503 / 463050 Fax: +9661 4650852 / 4631952 Closing date: December 6

Upgrade the existing switchgear The term switchgear, used in association with the electric power system, or grid, refers to the combination of electrical disconnects, fuses and/or circuit breakers used to isolate electrical equipment.  Tender no: JB/R/E/281 Description: Upgrade/replace the existing 13.8 kVswitchgear with SF6 circuit breakers at Jubail plant. Bid bond: Not mentioned, Fee: Dh300 Details: Saline Water Conversion Corporation (SWCC), PO Box 5968, Riyadh 11432, Saudi Arabia. Tel: +9661 4630503 / 463050 Fax: +9661 4650852 / 4631952 Closing date: December 6

Fuel Gas Piping Replacement Tender no: JB/R/M/1162 Description: Fuel gas piping replacement for six boilers # 1-6 Phase-1 Al Jubail plant. Bid bond: Not mentioned, Fee: SR500 Details: Saline Water Conversion Corporation (SWCC), PO Box 5968, Riyadh 11432, Saudi Arabia. Tel: +9661 4630503 / 463050 Fax: +9661 4650852 / 4631952 Closing date: December 6

Copyright 2008 www.tradearabia.com

Copyright 2008 Al Hilal Publishing & Marketing Group

Provided by Syndigate.info an Albawaba.com company
COPYRIGHT 2008 Al Bawaba (Middle East) Ltd.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2008 Gale, Cengage Learning. All rights reserved.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Oil & Gas News
Date:Nov 17, 2008
Words:409
Previous Article:ONGC says conditions unmet in $2.6bn bid.
Next Article:People.
Topics:

Terms of use | Copyright © 2013 Farlex, Inc. | Feedback | For webmasters | Submit articles