Printer Friendly
The Free Library
14,679,271 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

Jilbey Intersects High Grade Gold at Bissa with 37.47 g/t over 4 Meters and 17.94 g/t over 8 Meters.


BEDFORD, Nova Scotia Bedford (2001 pop.: 16,102) is a community in the Halifax Regional Municipality, Nova Scotia, Canada. It was an independent town from 1980-1996. Bedford lies on the northwestern end of Bedford Basin, which is part of the Halifax Harbour.  -- Jilbey Gold (TSX TSX Toronto Stock Exchange (TSE before April, 2002)
TSX Transfer from Stack Pointer to Index
TSX True Space Extension
 VENTURE:JLB JLB Jorge Luis Borges (Argentinian author)
JLB James Labrie (Dream Theater vocalist)
JLB Junior League of Boston
JLB Junior League of Brooklyn
JLB Junior League of Birmingham
JLB Junior League of Buffalo
) is pleased to announce very impressive high grade gold assays on the Bissa Bissa or Bisa is the name of a tribe living in Burkina Faso and the northern part of Ghana and Togo. Their language, Bissa language, is a Mande language. An alternate name for the Bissa is Busansi which is used by the Mossi people.  property .Assays have been received for an additional 11 Reverse Circulation (RC) holes from ongoing drilling on the Bissa project. This drilling was designed to outline resources at Bissa Southwest Southwest or south west is the ordinal direction halfway between south and west, the opposite of northeast.

Southwest or south west may also refer to:
  • The Southwestern United States
  • Southwest China
 and further extend the Bissa Deposit Extension. Significant gold values include 37.47g/t Au over 4 meters, 17.94 g/t Au over 8 meters and 9.96 g/t Au over 4 meters.

The presence of high grade gold intersections is a consistent feature of much of the drilling completed by Jilbey in the Sabce Shear shear: see strength of materials.
Shear

A straining action wherein applied forces produce a sliding or skewing type of deformation.
 Zone. Future drilling will be designed to include detailing the areas of high grade mineralization Mineralization
The process by which the body uses minerals to build bone structure.

Mentioned in: Rickets

mineralization,
n the bioprecipitation of an inorganic substance.
. A second drill has been added to the drilling program.

Three maps are appended to this release as follows: Map 1 shows the 4 km Bissa - Gonglou section of the 30 km Sabce Shear Zone with the interpreted Translated from source code into machine code one line at a time. See interpreted language and interpreter.

interpreted - interpreter
 location of an apparent zone of high grade mineralization. Selected high grade assays are noted for drill holes in the interpreted high grade zone. This map also shows previously released drill information. Map 2 shows the drilling around the Bissa Hill Deposit and Deposit Extension. Map 3 shows the drilling around the Bissa SW Area.

Highlights of the current results are reported below while all the intersections are presented in Table 1. For maps showing drill hole locations and detailed drill results of all holes, visit http://www.jilbey.com and go to the "press release" section.
Highlights:

----------------------------------------------------------------
HOLE ID      EAST    NORTH     FROM     TO    INTERVAL      g/t
                                 (m)    (m)         (m)     (Au)
----------------------------------------------------------------
ZBR-071      8500     5492       59     62           3     9.22
----------------------------------------------------------------
ZBR-073      8580     5460       17     21           4    37.47
----------------------------------------------------------------
        and                      48     56           8    17.94
----------------------------------------------------------------
ZBR-079      9140     5980       39     46           7     4.92
----------------------------------------------------------------
        and                      63     67           4     9.96
----------------------------------------------------------------
        and                      74     88          14     1.06
----------------------------------------------------------------
ZBR-080      9180     6020       83     87           4     3.13
----------------------------------------------------------------
ZBR-081      9180     5975       58     63           5     4.26
----------------------------------------------------------------
                                 61     63           2    10.22
----------------------------------------------------------------



Work to date has shown the Bissa mineralization to extend for at least 5.5 kilometers within the 30 kilometer kilometer

one thousand (103) meters; 3280.83 feet; five-eighths of a mile; abbreviated km.
 Sabce Shear Zone ("SSZ SSZ Specified Strike Zone
SSZ Surface Security Zone
SSZ Santos, Sao Paulo, Brazil (Airport Code) 
"). Several additional significant geochemical anomalies have been identified along the remainder of the SSZ and these are currently being followed up. A detailed geochemical map of the entire SSZ is being generated.

Greg GREG Great Egg Harbor National Scenic and Recreational River (US National Park Service)  Isenor, President and CEO (1) (Chief Executive Officer) The highest individual in command of an organization. Typically the president of the company, the CEO reports to the Chairman of the Board.  of Jilbey Gold stated "These impressive drill results point out the continued drilling success we are experiencing at Bissa. The high grade gold assays are a prominent feature of many drill holes and point to the presence of high grade ore ore, metal-bearing mineral mass that can be profitably mined. Nearly all rock deposits contain some metallic minerals, but in many cases the concentration of metal is too low to justify mining the ore.  shoots on the Bissa property. Our interpretation of recent drilling seems to indicate high grade mineralization striking in a northwest-southeast direction from the main northeast-southwest zones. Although further work is required to verify (1) To prove the correctness of data.

(2) In data entry operations, to compare the keystrokes of a second operator with the data entered by the first operator to ensure that the data were typed in accurately. See validate.
 this interpretation, it may prove to be the key to understanding and predicting high grade sections of the mineralization. Virtually all of the zones outlined to date, including the higher grade sections, are open in both directions and at depth. The drilling success has dictated dic·tate  
v. dic·tat·ed, dic·tat·ing, dic·tates

v.tr.
1. To say or read aloud to be recorded or written by another: dictate a letter.

2.
a.
 that a second drill be added to the project. We will continue our drill program with the intention of updating our 43-101 resource estimate prior to year end."

The QA/QC QA/QC Quality Assurance/Quality Control  program has not changed since last press release dated May 26, 2005. Greg Isenor P.Geo., a qualified person as defined under the Canadian Canadian (kənā`dēən), river, 906 mi (1,458 km) long, rising in NE New Mexico. and flowing E across N Texas and central Oklahoma into the Arkansas River in E Oklahoma.  Securities Administrators' National Instrument 43-101, is responsible for program supervision.
TABLE 1: RC HOLES ZBR- 071 TO ZBR- 081 COMPOSITES

---------------------------------------------------------------------
HOLE ID           EAST    NORTH     FROM      TO    LENGTH        Au
---------------------------------------------------------------------
                                 (meters)(meters)  (meters)     (g/t)
---------------------------------------------------------------------
ZBR-071           8500     5492       46      48         2      1.38
---------------------------------------------------------------------
              and                     59      61         2     15.74
---------------------------------------------------------------------
               or                     59      62         3      9.22
---------------------------------------------------------------------
              and                     79      81         2      0.97
---------------------------------------------------------------------
              and                     89      91         2      1.05
---------------------------------------------------------------------
ZBR-072           8500     5447       25      28         3      0.77
---------------------------------------------------------------------
ZBR-073           8580     5460       17      21         4     37.47
---------------------------------------------------------------------
        including                     17      20         3     47.75
---------------------------------------------------------------------
              and                     48      56         8     17.94
---------------------------------------------------------------------
        including                     48      53         5     26.08
---------------------------------------------------------------------
ZBR-074           8580     5505       15      18         3      1.24
---------------------------------------------------------------------
              and                     64      66         2      4.05
---------------------------------------------------------------------
ZBR-075           8860     6170       31      32         1      1.79
---------------------------------------------------------------------
              and                     44      57        13      1.01
---------------------------------------------------------------------
        Including                     46      51         5      1.63
---------------------------------------------------------------------
              and                     77      85         8      1.06
---------------------------------------------------------------------
              and                     95     106        11      0.67
---------------------------------------------------------------------
ZBR-076           8900     6190       48      50         2      0.88
---------------------------------------------------------------------
              and                     54      56         2      1.09
---------------------------------------------------------------------
              and                     71      80         9      0.78
---------------------------------------------------------------------
              and                     89     101        12      0.46
---------------------------------------------------------------------
              and                    112     113         1      0.84
---------------------------------------------------------------------
              and                    137     138         1      1.83
---------------------------------------------------------------------
ZBR-077           8940     6035        1      12        11      0.65
---------------------------------------------------------------------
              and                     67      69         2      1.04
---------------------------------------------------------------------
              and                     72      84        12      0.76
---------------------------------------------------------------------
        including                     77      84         7      0.93
---------------------------------------------------------------------
              and                     89      96         7      0.68
---------------------------------------------------------------------
ZBR-079           9140     5980       15      16         1      1.45
---------------------------------------------------------------------
              and                     29      31         2      0.82
---------------------------------------------------------------------
              and                     34      36         2      0.61
---------------------------------------------------------------------
              and                     39      46         7      4.92
---------------------------------------------------------------------
        including                     41      46         5      6.17
---------------------------------------------------------------------
              and                     53      54         1      6.46
---------------------------------------------------------------------
              and                     63      67         4      9.96
---------------------------------------------------------------------
        including                     63      66         3     12.51
---------------------------------------------------------------------
              and                     70      71         1      1.27
---------------------------------------------------------------------
              and                     74      88        14      1.06
---------------------------------------------------------------------
        including                     78      86         8      1.46
---------------------------------------------------------------------
ZBR-080           9180     6020       53      55         2      0.71
---------------------------------------------------------------------
              and                     78      79         1      2.25
---------------------------------------------------------------------
              and                     83      87         4      3.13
---------------------------------------------------------------------
              and                    103     106         3      4.76
---------------------------------------------------------------------
ZBR-081           9180     5975        0       1         1      1.52
---------------------------------------------------------------------
              and                      4       5         1      1.46
---------------------------------------------------------------------
              and                     24      26         2      1.67
---------------------------------------------------------------------
              and                     29      33         4      3.54
---------------------------------------------------------------------
              and                     44      49         5      1.55
---------------------------------------------------------------------
              and                     58      63         5      4.26
---------------------------------------------------------------------
              and                     61      63         2     10.22
---------------------------------------------------------------------
              and                     77      81         4      0.34
---------------------------------------------------------------------



Please Note: There are 3 Maps available on CCNMatthews' website at the following links:

http://www2.ccnmatthews.com/database/fax/2000/jlbmap1.pdf

http://www2.ccnmatthews.com/database/fax/2000/jlbmap2.pdf

http://www2.ccnmatthews.com/database/fax/2000/jlbmap3.pdf

The TSX Venture Exchange TSX Venture Exchange

Originally called the Canadian Venture Exchange (CDNX), this was a result of the merger of the Vancouver and Alberta stock exchanges. The goal of TSX Venture Exchange is to provide venture companies with effective access to capital while protecting investors.
 has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.
COPYRIGHT 2005 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2005, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Date:Jun 7, 2005
Words:991
Previous Article:Hollywood Entertainment District Executive Director, Kerry Morrison, to Receive LAPD's Highest Honor, LA Police Commission Distinguished Service...
Next Article:SPSS Boosts Predictive Analytics Leadership by Unveiling Integration with Microsoft SQL Server 2005; SPSS Technology Significantly Expands...



Related Articles
Jilbey Gold Plans Drilling Programs for 2004-2005.
Jilbey Intersects 6 Meters of 15.91 g/t Gold Northeast of Bissa Hill Deposit.
Jilbey Gold Announces Resource Estimate on the Bissa Hill Deposit, Burkina Faso.
Jilbey Cuts 34 Meters of 6.13 g/t Gold on the Bissa Project.
Jilbey Cuts 10 Meters of 5.10 g/t Gold and Confirms New Gold Zone on the Bissa Project.
Jilbey Drilling Intersects 61 Meters 2.11 g/t Gold at Bissa Project.
Jilbey Gold Exploration Drilling Update.
Jilbey Gold Exploration Ltd.: Bissa Hill Deposit Extension Outlined.
Jilbey Gold Intersects 3.44g/t Au Over 14 Meters on Kindo Group Drilling.
High River Gold Expands Resource Potential at the Bissa Project in Burkina Faso.

Terms of use | Copyright © 2009 Farlex, Inc. | Feedback | For webmasters | Submit articles