* The best way to avoid materials-handling problems is to design and install the system properly in the beginning. Keep in mind some basic principles:

* Minimize the number of elbows, vertical lifts, and length of flexible hose.

* Size pumps using these rules:

1 horizontal ft = 1 equivalent ft

1 vertical ft = 2 equivalent ft

1 90[degrees] elbow = 20 equivalent ft

1 ft of flex hose = 3 equivalent ft

An average railcar is 66 ft long

* Avoid up-sloping material lines.

* Choose carefully between a dedicated-line system with purge and a common-line system. Dedicated lines cost more initially and reduce throughput somewhat, but they avoid line clogs and ensure more reliable operation. Dedicated lines should definitely be used in a Just-In-Time system to avoid over-filling the small vacuum chambers.

* Decide whether dry-air-conveying or purging is right for your needs.

* Choose a control system that will meet current and anticipated future needs and can be understood by your employees. Some of today's more exotic control systems do a lot of troubleshooting automatically. They include alarms for vacuum-pump motor failure, high vacuum, low vacuum, clogged filters, bag breaks, high amp readings, and motor phase. The initial cost for this level of sophistication so·phis·ti·cate  
v. so·phis·ti·cat·ed, so·phis·ti·cat·ing, so·phis·ti·cates

v.tr.
1. To cause to become less natural, especially to make less naive and more worldly.

2.
 leads most processors to opt for controls that have a simpler panel just showing the status of chambers and pumps.

Starling starling, any of a group of originally Old World birds that have become distributed worldwide. Starlings were brought to New York in 1890; since then the common starling (Sturnus vulgaris) has spread throughout North America.  up a new system

If a problem crops up when first starting up a material-handling system, it can be solved by answering the following questions:

1. Is the station turned on? Verify its status at the controller.

2. Is the vacuum line physically attached to this station?

3. Is the material hose/line attached to the proper hopper, surge bin, or gaylord? If you are using source valves, verify that the proper valve is assigned to this station.

4. Is the source valve opening and closing properly?

5. Is enough air mixing with the material? The system cannot move material without air mixed into it. Check the air probe at the source and make sure that the probe is at least 50% open.

6. Do material hoses have any holes or breaks?

7. Is the material flowing freely from the source?

8. Is it clogged in the hopper?

9. Is there sufficient material at the source point?

10. Is material clogged in the line?

11. Is the flapper sealing properly against the dump throat on the vacuum chamber? If there are grommets on the bottom of the dump throat, make sure the flapper seals properly against the grommets. Conical conical /con·i·cal/ (kon´i-k'l) cone-shaped.

con·i·cal or con·ic
adj.
Of, relating to, or shaped like a cone.
 valves are sometimes used to seal the dump throat, but they are relatively expensive.

12. Is one station loading correctly and the others are not? Check that station to verify that the valve is not stuck in the open position. This will prevent other stations from loading properly.

Most common problems

When a working system develops a problem, it is typically that one or more stations suddenly do not fill properly. One's first instinct may be to lengthen length·en  
tr. & intr.v. length·ened, length·en·ing, length·ens
To make or become longer.



lengthen·er n.
 the load time. That will not solve the problem. Instead, you need to find out what has changed in the system.

One of the most common problems in pneumatic pneumatic /pneu·mat·ic/ (noo-mat´ik)
1. pertaining to air.

2. respiratory.


pneu·mat·ic
adj.
1. Of or relating to air or other gases.

2.
 conveying systems is failure of four-way solenoid solenoid (sō`lənoid'), device made of a long wire that has been wound many times into a tightly packed coil; it has the shape of a long cylinder.  control valves Control valves are valves used within industrial plants and elsewhere to control operating conditions such as temperature, pressure, flow, and liquid level by fully or partially opening or closing in response to signals received from controllers that compare a "setpoint" to a . This is almost always caused by foreign particles from the compressed-air lines and usually occurs during installation and start-up. The four-way solenoid that controls station valves requires clean, dry, oil-free air. A compressed-air filter/separator can virtually eliminate such problems with these valves.

A drop in throughput

Pellet materials require sufficient air to be transported. Insufficient air will cause material to alternately surge and hesitate in the lines, reducing throughput. The cure is to gradually increase the air in the lines by adjusting the air mixing valve at the material source, and the throughput will usually increase.

Clogged filters in vacuum chambers, vacuum takeoff boxes, and vacuum pumps Vacuum pump

A device that reduces the pressure of a gas (usually air) in a container. When gas in a closed container is lowered from atmospheric pressure, the operation constitutes an increase in vacuum in this container.
 are the most frequent cause of reduced throughput. Inspect and clean them regularly and don't forget to empty the catch pans under cyclone cyclone, atmospheric pressure distribution in which there is a low central pressure relative to the surrounding pressure. The resulting pressure gradient, combined with the Coriolis effect, causes air to circulate about the core of lowest pressure in a  filters. If the pans fill up, dust can be pulled back through the system to clog the filters.

A loss of vacuum will also cause throughput to drop. The gauge at the vacuum pump should read 5 to 9 in. of Hg while the system is running. A lower reading indicates a vacuum leak.

To check vacuum in the system:

1. Remove the vacuum line from the inlet inlet /in·let/ (-let) a means or route of entrance.

pelvic inlet  the upper limit of the pelvic cavity.

thoracic inlet  the elliptical opening at the summit of the thorax.
 to the cyclone.

2. Cap off the cyclone inlet with duct tape duct tape
n.
A usually silver adhesive tape made of cloth mesh coated with a waterproof material, originally designed for sealing heating and air-conditioning ducts.

Noun 1.
, or cover it with your hand.

3. Push the pump "Start" button. The high-vacuum relief should open. (It will sound like a bird chirping chirp  
n.
A short, high-pitched sound, such as that made by a small bird or an insect.

intr.v. chirped, chirp·ing, chirps
To make a short, high-pitched sound.
.) This will let you know the pump is sealed properly. The vacuum gauge should go to at least 12 in. of Hg.

4. If the vacuum relief doesn't open, there is an air leak at the pump. Check the seal on the cyclone's dump can, the filter-housing lid seal at the pump, the vacuum breaker An attachment commonly placed on a bibcock valve or toilet or urinal flush valve, that prevents water from being sucked backward from a garden hose into the public water system. This prevents contamination should the public water system's pressure drop.  valve (verify it has air at 85 to 100 psi), and all piping connections.

5. If the relief valve opens, reconnect the vacuum line to the system and do the same check. If the relief valve opens, the system is sealed and all station "T" valves are closed.

6. If the valve doesn't open, you have a vacuum leak. Check the system for open lines, open station valves, or lack of air to the station "T" valves.

7. Make sure that all vacuum chambers are sealed, all hose and pipe connections are tight, and look for holes in material lines that can be worn by glass-filled materials or excessive conveying velocities. Use stainless or ceramic elbows for abrasive resins.

Plugged material lines

This problem is typically related to a lack of transport air. The surging described above can pack material into the lines. With virgin pellets, simply remove the material line from the material source and the plug should break up. If this works, slightly increase the air flow by adjusting the air mixing valve to avoid a recurrence.

Regrind and even virgin material can pack in the lines hard enough to require manual removal. The plug has to be isolated and each end of the affected pipe must be opened and the plug forced out with a rod. Sufficient transport air is the best preventative.

'Starved' vacuum chambers

If material is not reaching vacuum chambers beyond a particular station in a common-line system, check for an overfilled overfilled,
adj See overextended.
 vacuum chamber. A reverse-flow check valve (Mech.) a valve in the feed pipe of a boiler, or other conduit, to prevent the return of the feed water or other fluid.
- Knight.

See also: Check
 is typically located inside the vacuum chamber at the material inlet. Filling the vacuum chamber above this check valve will cause it to be held open when another chamber attempts to load from the shared line. The resulting vacuum loss will prevent material conveyance The transfer of ownership or interest in real property from one person to another by a document, such as a deed, lease, or mortgage.


conveyance n.
 to all other chambers on the shared line. Chambers should be filled nearly to the level of the check valve but not above it. Decrease the load time; or, if more material needs to be loaded in a single shot, add a spacer below the check valve or switch to a larger chamber.

Not in time for JIT JIT - dynamic translation ?

Common-line systems should not be used with JIT (Just-in-Time) loaders. The problem is that some material tends to miss the turn at a lateral (or "Y") pipe like a driver missing a high-way exit. When the vacuum ceases down this leg, this "bypass material" will come to rest just past the "Y." This creates a problem for JIT systems because the bypass material can be more than the shot size (often 1 lb or less), causing the station to repeatedly call for material. A station farther down the line may clear the bypass material, overfilling its small JIT chamber and holding the check valve open.

If this condition becomes chronic, install a diverter valve in place of the standard lateral pipe. The diverter automatically forces material to go to its assigned station. Better yet, use dedicated material lines for JIT applications to pre-empt pre·empt or pre-empt  
v. pre·empt·ed, pre·empt·ing, pre·empts

v.tr.
1. To appropriate, seize, or take for oneself before others. See Synonyms at appropriate.

2.
a.
 this problem.

A common line can usually be used with larger vacuum chambers because when enough material misses the turn, the remaining material will be forced to make the turn at the lateral. When the bypass material does clear, it usually won't overfill o·ver·fill  
v. o·ver·filled, o·ver·fill·ing, o·ver·fills

v.tr.
To fill (something) to overflowing.

v.intr.
To become too full.
 a larger chamber.

Tom Spangler is service manager at Novatec, Inc. in Baltimore. Les Mischaud is installation manager, and John Kraft John Kraft (born May 6, 1941) is an American politician. He is currently a member of the Democratic Party and a was candidate for Insurance Commissioner of California in the 2006 democratic primary. His occupation on the ballot was listed as Insurance Healthcare Consultant.  is a marketing specialist. They may be reached at (410) 789-4811 or e-mail sales@novatec.com
COPYRIGHT 2006 Gardner Publications, Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2006, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Title Annotation:MATERIALS HANDLING: Troubleshooter
Author:Kraft, J.
Publication:Plastics Technology
Date:Apr 1, 2006
Words:1403
Previous Article:Moving die parts change profile shapes 'on the fly'.(Close-Up: EXTRUSION)
Next Article:Auto glazing: window of opportunity for molders: this emerging market promises to be big but challenging. Polycarbonate car windows require...



Related Articles
Unusual approaches to quality: resin suppliers' 'total quality' programs are producing some creative efforts. (editorial)
ESD Control in Handling and Sorting -- Even minor, and seemingly unimportant, actions can produce ESD. Read on to ensure that your actions aren't the...
Hole detection line. (Instruments).(advertisement)
Dewatering coarse wet rejects from paper mill recycling systems: the high costs and possible EPA penalties associated with landfilling wet waste can...
Solving gravimetric blender problems.(MATERIALS HANDLING: Troubleshooter)
Amacom.(How To Negotiate Like A Child: Unleash The Little Monster Within To Get Everything You Want)(The Career Troubleshooter: Tips And Tools For...
Material handling and drying are a molder's 'central' issue.(Strategies)
Metal detectors, feeders, conveyors.(Equipment: Literature)
Eliminate problems with container handles.(Troubleshooter: BLOW MOLDING)
Therapy for 'over-weight' weigh-hopper scales.(Troubleshooter: MATERIALS HANDLING)

Terms of use | Copyright © 2009 Farlex, Inc. | Feedback | For webmasters | Submit articles