Printer Friendly
The Free Library
14,679,626 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

High River Gold-Berezitovoye Project Update.


Business Editors

TORONTO--(BUSINESS WIRE)--June 23, 2003

In December 2002, High River Gold Mines Ltd. finalized See finalization.  an agreement to acquire a 100% interest in the Berezitovoye Gold Project, located in the Amur Region of southern Siberia, Russia. The Berezitovoye deposit is amenable to low-cost, open pit mining and has reported Mineral Reserves of 1.3 million ounces of gold and 6.5 million ounces of silver. The gold-polymetallic deposit at Berezitovoye is approximately 750 metres in length and up to 100 metres in width at its thickest portions. The reserve estimates have been estimated according to according to
prep.
1. As stated or indicated by; on the authority of: according to historians.

2. In keeping with: according to instructions.

3.
 the Russian Classification System and do not conform to Verb 1. conform to - satisfy a condition or restriction; "Does this paper meet the requirements for the degree?"
fit, meet

coordinate - be co-ordinated; "These activities coordinate well"
 the Canadian Institute of Mining, Metallurgy and Petroleum The Canadian Institute of Mining, Metallurgy and Petroleum (CIM) is a technical society of professionals in the Canadian minerals, metals, materials and energy industries. It was founded in 1898. In 2006, the organization had 12,000 national members.  (CIM (1) (Computer-Integrated Manufacturing) Integrating office/accounting functions with automated factory systems. Point of sale, billing, machine tool scheduling and supply ordering are part of CIM. ) Standards on Mineral Resources Noun 1. mineral resources - natural resources in the form of minerals
natural resource, natural resources - resources (actual and potential) supplied by nature
 and Reserves. As part of High River's due diligence Research; analysis; your homework. This term has caught on in all industries, because it sounds so "wired." Who would want to do analysis or research when they can do due diligence. See wired.  process these reserves are being audited by Roscoe Postle Associates Inc. ("Roscoe Postle"), of Toronto. High River has not yet done the work necessary to verify the classification and these reserve estimates should not be relied on until classified according to CIM Standards by Roscoe Postle. Roscoe Postle are currently preparing a block model estimate of the reserves and resources which will provide the basis for a feasibility study "A Feasibility Study" is an episode of the original The Outer Limits television show. It first aired on 13 April, 1964, during the first season. It was remade in 1997 as part of the revived The Outer Limits series with a minor title change. .

The project appears to have excellent logistics and will be developed jointly with the Russian company OJSC OJSC Open Joint Stock Company  Buryatzoloto, in which High River has a fully diluted 51% equity interest. Buryatzoloto will be the operator.

Historical Database

The Russian database was the result of an extensive exploration programme in the late 1970's, which included the development of three adits, totaling 7,914 metres in length, and almost 40,000 metres of drilling. The three adits were developed 80 metres apart vertically on the deposit and were used to channel sample the mineralization Mineralization
The process by which the body uses minerals to build bone structure.

Mentioned in: Rickets

mineralization,
n the bioprecipitation of an inorganic substance.
 and provide bulk samples. In addition to cross cuts every 40 metres, four raises were driven and drill stations were cut every 20 to 40 metres for underground drilling.

Recent Core Drilling Results

As part of their audit, Roscoe Postle requested a 25 hole core drilling programme be conducted to provide additional data to assist in confirming the historical Russian database. Assay highlights from these holes are listed in the attached Table. There are lower grade intercepts that have not been included in the Table which could ultimately form part of an optimized open pit mining reserve. The Berezitovoye Deposit consists of three zones. The Central Zone, the largest, and the South Zone contain higher grades and are expected to form the initial starter pits.

All diamond drilling Diamond Drilling is a highly specialized industry used for mineral exploration around the world. Most commonly using wireline and core bits with diamond encrusted matrix. To drill holes to max depths of twelve thousand feet, for the recovery of core used in verifying mineral  was completed using conventional HQ and NQ core recovery. Drill core was split using a diamond saw with half the core being archived. Drill core was sampled on metre intervals and crushed to 3/8 inch. A 500 gram subsample sub·sam·ple  
n.
A sample drawn from a larger sample.

tr.v. sub·sam·pled, sub·sam·pling, sub·sam·ples
To take a subsample from (a larger sample).
 was ground to minus 200 mesh for chemical analysis. A 50 gram subsample was used for conventional fire assay with gravimetric analysis gravimetric analysis
n.
The determination of the quantities of the constituents of a compound.
 of gold and silver. Analysis was carried out at Buryatozloto's Zun-Holba laboratory in Buryatia with check assays being run at two independent laboratories: the State Laboratory Research Center on Minerals (GUP GUP General Use Pesticide
GUP Gatekeeper Update Protocol
GUP Gallup, NM, USA - Gallup Municipal (Airport Code)
GUP Gallaudet University Press (Illinois)
GUP Green Uni Project
 LISIMS) in Chita and at the Republic Analytical Center in Ulan-Ude. Blanks and standards were routinely inserted every ten samples. In addition, approximately 10% of the samples are being assayed at the independent Russian certified Laboratory JSC JSC Johnson Space Center (NASA)
JSC Joint Stock Company
JSC Java Studio Creator
JSC Joint Steering Committee
JSC Joint Standing Committee
JSC Journal of Symbolic Computation
JSC Joint Scientific Committee
 IRGIREDMET (Irkutsk Scientific Research Institute of Precious and Rare Metals and Diamonds) and at the ISO (1) See ISO speed.

(2) (International Organization for Standardization, Geneva, Switzerland, www.iso.ch) An organization that sets international standards, founded in 1946. The U.S. member body is ANSI.
 9001/2000 certified laboratory of Chemex in Canada. The logging, sampling and QA/QC QA/QC Quality Assurance/Quality Control  procedures were audited by H. Agnerian, M. Sc P. Geo of Rocoe Postle, an independent Qualified Person as required by National Policy 43-101

Status of the Reserve Audit

In carrying out their reserve audit mandate, Roscoe Postle visited the Berezitovoye property and performed check calculations of the Russian reserve estimates based on the historical Russian data provided. Following creation of a digital database incorporating the historical Russian information, the mandate for the audit was expanded to estimate the resource using a three dimensional block modeling technique. Roscoe Postle is currently incorporating the results of the recent drilling programme into the database and before the end of July plans to complete the Mineral Resources estimate using the block model in accordance with CIM and 43-101 standards.

Feasibility Study The analysis of a problem to determine if it can be solved effectively. The operational (will it work?), economical (costs and benefits) and technical (can it be built?) aspects are part of the study. Results of the study determine whether the solution should be implemented.  Initiated

High River and Buryatzoloto have recently initiated a feasibility study utilizing a combination of International and Russian engineering expertise to meet international standards as well as Russian regulatory and permitting requirements. Micon International Limited ("Micon") and the Russian Company, NBLZoloto, have been engaged to provide overall technical advice on the project. Micon was selected because of its working relationship with NBLZoloto and its previous involvement with Buryatzoloto and the European Bank for Reconstruction and Development European Bank for Reconstruction and Development

Bank targeted at Eastern Europe and the former Soviet Union.
 (EBRD EBRD

See: European Bank for Reconstruction and Development
). Mine and infrastructure design will be handled by Sibgiprozoloto, a leading Russian research institute with an impressive track record in designing successful gold projects. Another highly regarded Russian institute, Irgiredmet, which specializes in gold processing, has been engaged to develop the optimum processing flow sheet. Roscoe Postle will continue to be involved with

any further updates to the reserve/resource database.

Exploration Plans

In addition to the main deposit, there are a number of satellite targets on the property which were historically identified using geochemical and electromagnetic methods. Some of these targets are large and show geochemical and geophysical characteristics similar to the main deposit. None of these targets have been evaluated by drilling in the past. A drill programme has been initiated.

       SUMMARY OF DRILL RESULTS ON THE BEREZITOVOYE DEPOSIT

           Drill Hole  From    To Interval Gold Grade(i) Silver Grade
                                  (metres)         (g/t)        (g/t)
---------------------------------------------------------------------
North Zone        400  27.0  42.0     15.0          1.77        18.49
                  401 104.0 134.0     30.0          1.88        17.49
                  402 241.0 253.0     12.0          2.21        15.80
                  403 183.0 190.0      7.0          1.96        24.55
                  404  35.0  47.0     12.0          1.57         8.22
                  405  28.0  45.0     17.0          3.66        11.23
                  406  99.0 114.0     15.0          4.98        10.50
                  407   9.1  21.9     12.8          4.47        13.09
                       36.9  58.9     22.0          3.78        16.01
                  408  42.0  48.0      6.0          3.08        10.12
---------------------------------------------------------------------
Central Zone      409  53.0  71.0     18.0          2.89        13.32
                  410 151.5 160.0      8.5          5.91         6.68
                      176.8 208.0     31.2          3.10         8.51
                  411  18.0  31.0     13.0          3.82         9.18
                       48.0 119.0     71.0          2.55        12.95
                  412  43.2 157.0    113.8          4.02        18.47
                  413  91.0 126.0     35.0          4.80        15.98
                      166.0 197.4     31.4          6.27        17.01
                  414 172.0 199.0     27.0          4.06        13.77
                  415 144.0 199.0     55.0          3.70        13.57
                  416 126.0 132.0      6.0          3.24        10.81
                      181.0 229.0     48.0          3.48        19.15
                  417 181.0 241.0     60.0          3.50        19.45
                  418   6.7 134.6    127.9          3.49        15.86
                  419  61.0 170.5    109.5          3.04        11.43
---------------------------------------------------------------------
South Zone        420  15.0 125.0    110.0          4.39        15.24
                  421  38.0  62.0     24.0          3.24        18.68
                      117.0 156.0     39.0          2.75        12.49
                  422  81.0 162.0     81.0          4.15        13.42
                  423  42.0  95.0     53.0          5.19        14.37
                  424  65.0  71.0      6.0          2.20        10.80
---------------------------------------------------------------------
(i) 7 samples of gold grading in excess of 50 g/t (ranging in grade
    from 51 g/t to 1228 g/t) have been cut to 50 g/t
COPYRIGHT 2003 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2003, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Date:Jun 23, 2003
Words:1297
Previous Article:S&P Affirms Africa Re 'BBB+' Ratings; Outlook Stable.
Next Article:PCTEL Announces Segue Wi-Fi Roaming Client for Windows Mobile 2003 Software for Pocket PCs; Segue Roaming Client Works with Windows Mobile to...



Related Articles
High River Gold Announces 2Q Earnings Of $2.0 Million Significant Increase In Revenue And Cash Flow.
High River Gold Announces 3Q Earnings Of $1.5 Million Continued Significant Increases In Revenue And Cash Flow.
High River Gold Closes Berezitovoye Project Acquisition.
High River Reports Gold Production For 2002.
High River Gold 2002 Financial Results.
High River Gold Announces Second Quarter Results.
High River Gold Reclassifies Reserves at Berezitovoye to CIM Standards.
High River Gold Announces Third Quarter Results.
High River Gold Appoints Daniel G. Vanin as Executive VP and Chief Operating Officer.
High River Gold-Production And Project Update For 2003.

Terms of use | Copyright © 2009 Farlex, Inc. | Feedback | For webmasters | Submit articles