Germany : Jungheinrich successfully implements major logistics project.Jungheinrich has recently completed one of its biggest ever automated materials handling Materials handling The loading, moving, and unloading of materials. The hundreds of different ways of handling materials are generally classified according to the type of equipment used. projects on behalf of Keller & Kalmbach GmbH one of Germany s Germany (jûr`mənē), Ger. Deutschland, officially Federal Republic of Germany, republic (2005 est. pop. 82,431,000), 137,699 sq mi (356,733 sq km). leading fastener, screw and machine tool wholesalers. Located just outside Nuremberg, Keller & Kalmbach GmbH s new distribution centre includes a pallet racking warehouse with 35,000 storage locations, an automated small parts warehouse with storage for 164,000 boxes, an automated small parts warehouse for 8,000 trays and an order picking area designed to cope with a fast throughput of orders. All order picking stations were set up to support order picking from pallets as well as from boxes and trays and a Jungheinrich Warehouse Management System (WMS WMS Warehouse Management System WMS Web Map Service (open geospatial consortium specification) WMS West Middle School (Rochester Hills, MI) WMS Workforce Management Software WMS Wechsler Memory Scale ) is used to manage all of the storage areas. Thanks to this multi-faceted system, Keller & Kalmbach will be able to achieve the desired flexibility in deploying its staff in the most efficient way possible, comments Dr. Stefan Seemuller, who is responsible for Automatic Systems at Jungheinrich Germany. The project - which, according to according to prep. 1. As stated or indicated by; on the authority of: according to historians. 2. In keeping with: according to instructions. 3. Dr. Ingomar Schubert, Head of Supply Chain Management at Keller & Kalmbach, represented the most ambitious construction project in our company s history - was implemented in less than 18 months from the time the contract was awarded. Being able to stick to the time plan for a project of this size is critical to the customer says Dr. Stefan Seemuller Steve Richmond Steve Richmond (born December 11, 1959 in Chicago, Illinois) is a retired professional ice hockey player who played 159 games in the National Hockey League. He played with the New York Rangers, New Jersey Devils, Detroit Red Wings, and Los Angeles Kings. , General Manager for Jungheinrich UKs Systems & Projects Division, comments: Jungheinrich has significantly developed its capabilities in the area of integrated solutions and automation over recent years. The company operates an international network of systems and projects divisions with a focus on tailored solutions, from manual warehousing systems (including warehouse management software and wireless communications wireless communications System using radio-frequency, infrared, microwave, or other types of electromagnetic or acoustic waves in place of wires, cables, or fibre optics to transmit signals or data. ) to fully automated warehouse systems incorporating stacker cranes, mini load systems, conveyors and automated guided vehicles The Automated Guided Vehicle (AGV) is a mobile robot used in industrial applications to move materials from point to point. Introduction Automated guided vehicles (AGVs) help to reduce costs of manufacturing and increase efficiency in a manufacturing system. . Solutions can be manual, fully automated or a combination of the two. Jungheinrich provides complete customer support from the initial consultation, planning and project management to system integration and after-sales support during ongoing operations. Copyright : Euclid Infotech Pvt. Ltd. Provided by Syndigate.info an Albawaba.com company |
|
||||||||||||||

Printer friendly
Cite/link
Email
Feedback
Reader Opinion