Further Extensions To The Sorowar Oxide Gold Resource From Latest Rc Drilling Results-Simberi Gold Project.


TORONTO Toronto (tərŏn`tō), city (1998 est pop. 2,400,000), provincial capital, S Ont., Canada, on Lake Ontario. Toronto is the largest city in Canada and since the 1970s has been one of the fastest-changing cities in North America, experiencing  -- (Simberi Mining Joint Venture ("SMJV") - Nord Pacific Ltd. 50%/Simberi Gold Corporation 50%)

Simberi Gold Corporation (TSX-V: SAU SAU Saudi Arabia (ISO Country code)
SAU St. Ambrose University (Davenport, IA)
SAU Spring Arbor University (Spring Arbor, Michigan) 
) - Simberi Gold Corporation ("Simberi") is pleased to announce that the latest results from a step-out and infill in·fill  
n.
1. The use of vacant land and property within a built-up area for further construction or development, especially as part of a neighborhood preservation or limited growth program.

2.
 reverse circulation ("RC") drill program at the Sorowar gold deposit have continued to identify wide thicknesses of surface and near surface oxide oxide, chemical compound containing oxygen and one other chemical element. Oxides are widely and abundantly distributed in nature. Water is the oxide of hydrogen. Silicon dioxide is the major component of sand and quartz.  mineralization Mineralization
The process by which the body uses minerals to build bone structure.

Mentioned in: Rickets

mineralization,
n the bioprecipitation of an inorganic substance.
. The results have further extended the dimensions of the known zone of mineralization at Sorowar and include:

-60m at 1.83g/t Au from surface (including 13m at 2.53g/t from surface and 22m at 3.08g/t from 16m)

-90m at 1.81g/t Au from surface (including 27m at 3.32g/t from 24m and 13m at 4.31g/t from 60m)

-80m at 1.29g/t Au from surface (including 34m at 2.56g/t from surface)

-80m at 1.23g/t Au from surface (including 3m at 3.01g/t from 11m and 23m at 3.77g/t from 57m)

-70m at 1.10g/t Au from surface (including 19m at 1.35g/t from surface and 40m at 1.19g/t from 29m)

-61m at 1.11g/t Au from surface (including 31m at 2.12g/t from surface)

-60m at 1.06g/t Au from surface (including 29m at 2.01g/t from 14m)

-100m at 1.01g/t Au from surface (including 22m at 2.47g/t from 15m)

Results from the previously announced first 11 drillholes in this program included:

-100m at 4.06g/t Au from surface (including 39m at 9.81g/t from 38m)

-100m at 2.10g/t Au from surface (including 79m at 2.47g/t from 12m)

-120m at 1.73g/t Au from surface (including 44m at 3.84g/t from 76m)

-101m at 1.04g/t Au from surface (including 31m at 2.84g/t from surface and 39m at 1.14g/t from 38m)

RC drilling commenced in July July: see month.  and 50 holes for 4,243 metres were completed. All analytical analytical, analytic

pertaining to or emanating from analysis.


analytical control
control of confounding by analysis of the results of a trial or test.
 work is now finalised and the most significant results from the programme are tabulated below:
---------------------------------------------------------------------
Drill- North- East-         Dip/   Interval   Inter-   Mineralisation
hole      ing   ing      Azimuth        (m)  section             Type
         (mN)  (mE)    (degrees)                (m @
        local local        local             g/t Au)
         grid  grid         grid
---------------------------------------------------------------------
RC881   1,721   301     vertical 0-101(eoh) 101@1.40    oxide   0-92m
(i)                                                  sulphide 92-101m
                       including       0-31  31@2.84    oxide
                                      38-77  39@1.14    oxide
                                                         with
                                                        minor
                                                     sulphide
---------------------------------------------------------------------
RC882   1,449   147 -60 degrees/
(i)                  090 degrees  0-50(eoh)  50@0.69    oxide
                       including       8-17   9@2.01    oxide
---------------------------------------------------------------------
RC883   1,428   181 -60 degrees/
(i)                  090 degrees  0-50(eoh)  50@0.64    oxide   0-13m
                                                     sulphide  13-50m
                       including       0-17  17@1.35    oxide   0-13m
                                                     sulphide  13-17m
---------------------------------------------------------------------
RC884   1,389   175 -60 degrees/            130@0.78    oxide   0-90m
(i)                  090 degrees 0-130(eoh)          sulphide 90-130m
                       including       5-50  45@1.69    oxide
                       including      60-66   6@2.62    oxide
---------------------------------------------------------------------
RC885   1,334   273 -60 degrees/            100@0.47    oxide   0-91m
(i)                  090 degrees 0-100(eoh)          sulphide 91-100m
                       including      35-52  17@2.50    oxide
---------------------------------------------------------------------
RC886   1,195   204 -60 degrees/    0-120(eoh)      120@1.73    oxide
(i)                 090 degrees                                  with
                                                                minor
                                                             sulphide
                       including     76-120          44@3.84    oxide
---------------------------------------------------------------------
RC887   1,233   205 -60 degrees/            100@2.10    oxide   0-77m
(i)                  090 degrees 0-100(eoh)          sulphide 77-100m
                       including      12-91  79@2.47    oxide  12-77m
                                                     sulphide  77-91m
---------------------------------------------------------------------
RC888   1,269   176 -60 degrees/            100@4.06    oxide   0-24m
(i)                  090 degrees 0-100(eoh)          sulphide  24-31m
                                                        oxide 31-100m
                       including      38-77  39@9.81    oxide
---------------------------------------------------------------------
RC889   1,313   148 -60 degrees/             60@0.59    oxide   0-15m
(i)                  090 degrees  0-60(eoh)          sulphide  15-20m
                                                        oxide  20-60m
                       including       9-14   5@1.64    oxide
                       including      29-42  13@1.21    oxide
---------------------------------------------------------------------
RC890   1,348   141 -60 degrees/            100@0.34    oxide   0-10m
(i)                  180 degrees 0-100(eoh)            trans-
                                                     sulphide  10-25m
                                                        oxide  25-80m
                                                       trans-
                                                     sulphide 85-100m
                       including      66-69   3@1.56    oxide
                                      75-82   7@1.45    oxide  75-80m
                                                       trans-
                                                      itional  80-82m
---------------------------------------------------------------------
RC891   1,472   204 -70 degrees/            130@0.47    oxide  0-129m
(i)                  090 degrees 0-130(eoh)          sulphide    129-
                                                                 130m
                       including      63-65   2@1.69    oxide
                                      71-77   6@1.78    oxide
                                    108-113   5@1.43    oxide
                                128-130 eoh   2@7.80   oxide-
                                                     sulphide
---------------------------------------------------------------------
RC892   1,367   301 -60 degrees/             80@0.43    oxide   0-46m
(i)                  090 degrees  0-80(eoh)          sulphide  46-80m
                       including       2-13  11@1.25    oxide
                                      16-31  15@1.07    oxide
---------------------------------------------------------------------
RC893   1,332   280 -60 degrees/            100@0.33    oxide  0-100m
(i)                  045 degrees 0-130(eoh)
                       including      21-27   6@4.10    oxide
---------------------------------------------------------------------
RC894   1,220   365 -60 degrees/             60@1.06    oxide   0-13m
(i)                  090 degrees  0-60(eoh)          sulphide  13-18m
                                                        oxide  18-43m
                                                     sulphide  43-60m
                       including      14-43  29@2.01 sulphide  13-14m
                                                        oxide  14-43m
---------------------------------------------------------------------
RC901   1,374   203 -60 degrees/             80@0.78    oxide   0-24m
(i)                  090 degrees  0-80(eoh)         sulphide-
                                                        trans  24-29m
                                                        oxide  29-42m
                                                     sulphide   42-48
                                                        oxide  48-55m
                                                    sulphide-
                                                        trans   55-62
                                                        oxide   62-80
                       including       0-10  10@2.52    oxide
                                      30-38   8@1.90    oxide
                                      50-51   1@1.06    oxide
                                      63-65   2@3.44    oxide
---------------------------------------------------------------------
RC902   1,609   231 -60 degrees/             80@1.29    oxide   0-75m
(i)                  090 degrees  0-80(eoh)            trans-
                                                     sulphide  75-80m
                       including       0-34  34@2.56    oxide
---------------------------------------------------------------------
RC903   1,731   425 -60 degrees/            100@0.56    oxide  0-100m
(i)                  090 degrees 0-100(eoh)
                       including       0-11  11@1.37    oxide
                                      18-25   7@1.35    oxide
                                      52-64  12@1.24    oxide
---------------------------------------------------------------------
RC907   1,693   465 -60 degrees/             80@0.84    oxide   0-80m
(i)                  090 degrees  0-80(eoh)
                       including      10-11   1@1.61    oxide
                                      16-21   5@1.61    oxide
                                      39-67  28@1.76    oxide
---------------------------------------------------------------------
RC908   1,681   507 -70 degrees/             90@1.81    oxide   0-72m
(i)                  090 degrees  0-90(eoh)            trans-
                                                     sulphide   72-90
                       including        3-4   1@1.09    oxide
                                      10-15   5@1.09    oxide
                                      24-51  27@3.32    oxide
                                      60-73  13@4.31    oxide   60-72
                                                       trans-
                                                      itional   72-73
---------------------------------------------------------------------
RC909   1,679   501 -60 degrees/             90@0.24    oxide   0-77m
                     270 degrees  0-90(eoh)          sulphide  77-90m

                       including      12-14   2@1.02    oxide
                                      23-32   9@1.00    oxide
---------------------------------------------------------------------
RC910   1,654   501 -60 degrees/            100@1.01    oxide  0-100m
                     090 degrees 0-100(eoh)
                       including        8-9   1@3.29    oxide
                                      15-37  22@2.47    oxide
                                      40-57  17@0.99    oxide
                                      65-85  20@0.96    oxide
---------------------------------------------------------------------
RC911   1,611   446 -60 degrees/             70@1.10    oxide   0-70m
                     270 degrees  0-70(eoh)
                       including       0-19  19@1.35    oxide
                                      29-69  40@1.19    oxide
---------------------------------------------------------------------
RC913   1,549   389 -60 degrees/             80@0.46    oxide    0-7m
                     090 degrees  0-80(eoh)            trans-
                                                     sulphide   7-19m
                                                        oxide  19-38m
                                                    sulphide-
                                                        trans  38-80m
                       including        1-7   6@4.50    oxide
---------------------------------------------------------------------
RC914   1,567   435 -60 degrees/             60@1.83    oxide   0-40m
                     270 degrees  0-60(eoh)            trans-
                                                     sulphide  40-60m
                       Including       0-13  13@2.53    oxide
                                      16-38  22@3.08    oxide
                                      41-42   1@1.17   trans-
                                                      itional
                                      57-60   3@1.44 sulphide
---------------------------------------------------------------------
RC915   1,627   485 -70 degrees/             90@0.51    oxide   0-56m
                     270 degrees  0-90(eoh)            trans-
                                                      itional  56-64m
                                                        oxide  64-90m
                       including        0-3   3@1.05    oxide
                                      16-19   3@1.99    oxide
                                      73-75   2@1.11    oxide
                                      82-90   8@1.20    oxide
---------------------------------------------------------------------
RC920   1,429   569 -60 degrees/             80@1.23    oxide   0-23m
                     090 degrees  0-80(eoh)            trans-
                                                     sulphide  23-53m
                                                        oxide  53-60m
                                                       trans-
                                                      itional  60-68m
                                                        oxide  68-80m
                       including      11-14   3@3.01    oxide
                                      57-80  23@3.77    oxide  57-60m
                                                       trans-
                                                      itional  60-68m
                                                        oxide  68-80m
---------------------------------------------------------------------
RC923   1,453   665 -70 degrees/             61@1.11    oxide   0-21m
                     270 degrees  0-61(eoh)            trans-
                                                     sulphide  21-61m
                       including       0-31  31@2.12    oxide   0-21m
                                                       trans-
                                                      itional  21-27m
                                                     sulphide  27-31m
---------------------------------------------------------------------
RC925   1,512   462 -60 degrees/            100@0.74    oxide    0-1m
                     315 degrees 0-100(eoh)          sulphide    1-9m
                                                       trans-
                                                      itional   9-87m
                                                     sulphide 87-100m
                       including      10-37  27@1.69   trans-
                                                      itional
                                      69-70   1@3.30   trans-
                                                      itional
                                      83-87   4@2.01   trans-
                                                      itional
                                      91-94   3@2.22 sulphide
---------------------------------------------------------------------
RC926   1,431   146 -60 degrees/             80@0.61    oxide   0-75m
                     090 degrees  0-80(eoh)            trans-
                                                     sulphide  75-80m
                       including      26-58  32@1.10    oxide
---------------------------------------------------------------------
RC927   1,391   147 -60 degrees/             80@0.67    oxide   0-16m
                     090 degrees  0-80(eoh)            trans-
                                                     sulphide  16-22m
                                                        oxide  22-40m
                                                       trans-
                                                      itional  40-44m
                                                        oxide  44-80m
                       including      32-36   4@1.42    oxide
                                      39-40   1@1.47    oxide
                                      60-80  20@1.55    oxide
---------------------------------------------------------------------
RC928   1,254   162 -60 degrees/            120@0.60    oxide   0-14m
                     090 degrees 0-120(eoh)            trans-
                                                     sulphide  14-32m
                                                        oxide  32-45m
                                                     sulphide  45-48m
                                                        oxide 48-110m
                                                       trans-    110-
                                                      itional    119m
                                                        oxide    119-
                                                                 120m
                       including     60-102  42@1.15    oxide
---------------------------------------------------------------------



NB: (i) denotes results previously reported.

Reporting of Results

The first line for each drillhole tabulated above is the average gold grade for the entire drillhole with no cutoffs applied.

Subsequent intervals reported within drillholes are calculated using a base cutoff of 0.5g/t Au and may include intervals with mineralised material less than 0.5g/t Au but for no more than two sequential One after the other in some consecutive order such as by name or number.  metres.

Discussion Of Results

(refer to plan attached)

Previous drilling at the Sorowar deposit concentrated on testing mineralisation within pit limits designed as part of a feasibility study "A Feasibility Study" is an episode of the original The Outer Limits television show. It first aired on 13 April, 1964, during the first season. It was remade in 1997 as part of the revived The Outer Limits series with a minor title change.  into the development of the Simberi Oxide Gold Project by Lycopodium Pty Ltd PTY LTD Propriety Limited (company structure in Australia)  in August 2003. Accordingly the current 50 hole drilling programme was designed to:

- Further interrogate (1) To search, sum or count records in a file. See query.

(2) To test the condition or status of a terminal or computer system.
 the extent and area of influence of interpreted Translated from source code into machine code one line at a time. See interpreted language and interpreter.

interpreted - interpreter
 high-grade High-grade

Credit quality of AAA or AA.


high-grade

Of, relating to, or being a bond with little risk of default on the part of the issuer. High-grade is usually reserved for bonds rated AAA or AA by the rating services.
 feeder feeder

abbreviation for self-feeders. Used in feeding groups of animals at intervals of several days. Feed has to be dry and comminuted so that it will run down the spouts from the hopper into the troughs.
 systems within the Sorowar deposit. Three (3) previous holes within the pit design were twinned and the assay ASSAY. A chemical examination of metals, by which the quantity of valuable or precious metal contained in any mineral or metallic mixture is ascertained. 2. By the acts of Congress of March 3, 1823, 3 Story's L. U. S. 1924; of June 25, 1834, 4 Shars. cont. Story's L. U. S.  results returned were as expected.

- Better identify pit limits by exploring for extensions along strike and on the flanks of the known oxide gold resource. Thirty six (36) holes were drilled entirely outside of the proposed pit limits and 11 holes were drilled partially within the pit.

Three (3) main areas were targeted to test for extensions to mineralisation in this programme:

-- The area adjacent to the current pit design at the southern end of the deposit.

-- The area adjacent to the current pit design to the north east of the deposit.

-- The area to the east of the current pit design, known as the Sorowar East prospect.

Southern Area

In the southern portion of the deposit, drillholes RC882 to RC887, RC892 and RC901 intersected extensive surface and near surface oxide mineralisation indicating that considerable shallow This article or section may contain original research or unverified claims.

Please help Wikipedia by adding references. See the for details.
This article has been tagged since October 2007.
Shallow means not very deep.
 oxide mineralisation exists both to the west and east of the proposed Sorowar pit. This shallow mineralisation is highlighted in RC887 which returned 100m at 2.10 g/t Au from surface including 79m at 2.47 g/t Au from 12 metres depth.

Future pit re-optimisation studies incorporating these robust drilling results are expected to result in extensions to the final pit limits. Subsequent lateral expansion Lateral expansion (sometimes known as horizontal expansion), in economics, is the growth of a business enterprise through the acquisition of similar companies, in the hope of achieving economies of scale or economies of scope.  of the southern portion of the pit will also likely result in deepening deep·en  
tr. & intr.v. deep·ened, deep·en·ing, deep·ens
To make or become deep or deeper.

Noun 1. deepening - a process of becoming deeper and more profound
 of the pit to capture mineralisation at depth as intersected in holes RC884 to RC888, RC893, RC894, RC901 and RC926 to RC928. This potential is highlighted in RC888 which intersected 100m at 4.06 g/t Au from surface including 39m at 9.81 g/t Au from 38 metres depth in a predominantly pre·dom·i·nant  
adj.
1. Having greatest ascendancy, importance, influence, authority, or force. See Synonyms at dominant.

2.
 oxidised Adj. 1. oxidised - combined with or having undergone a chemical reaction with oxygen; "the oxidized form of iodine"
oxidized
  envelope (1) A range of frequencies for a particular operation.

(2) A group of bits or items that is packaged and treated as a single unit.

(3) See also pushing the envelope.
 over the entire drillhole width.

Holes drilled adjacent to the western edge of the pit including RC882, RC888, RC889, RC926, RC927 and RC928 all demonstrate that mineralisation to the west has not been closed off or fully defined. Holes adjacent to the eastern edge of the pit including RC892 and RC894 also demonstrate non closure of mineralisation to the east.

North-eastern Area

In the north-eastern area of the deposit, holes RC909, RC910, RC911, RC913 and RC914 demonstrate that the pit limits will likely be extended further east to access broad zones of shallow oxide gold mineralisation. This potential is demonstrated in RC910 which intersected 100m at 1.01 g/t Au from surface including 22m at 2.47 g/t Au from 15 metres depth in an oxidised envelope over the entire drillhole width.

Re-optimisation studies will also seek to determine whether an easterly pit extension will enable the pit to access deeper mineralisation as demonstrated in holes RC907 and RC908. For example, RC908 intersected 90m at 1.81 g/t Au from surface including oxide mineralisation of 27m at 3.32 g/t Au from 24 metres depth and 13m at 4.31 g/t Au from 60 metres in depth.

Sorowar East

The Sorowar East area is represented by a 100 metre metre

In poetry, the rhythmic pattern of a poetic line. Various principles have been devised to organize poetic lines into rhythmic units. Quantitative verse, the metre of Classical Greek and Latin poetry, measures the length of time required to pronounce syllables,
 by 100 metre zone located approximately ap·prox·i·mate  
adj.
1. Almost exact or correct: the approximate time of the accident.

2.
 250 metres east of the proposed Sorowar pit. Previous drilling identified surface oxide mineralisation as demonstrated in RC483 which intersected 32m @ 5.87 g/t Au from surface, RC485 which intersected 11m @ 3.46 g/t Au from surface and RC378 which intersected 21m @ 2.82 g/t Au from 7 metres depth.

Current drillholes RC920 and RC923 returned strongly mineralised intercepts typified by RC920 which intersected 80m at 1.23 g/t Au from surface including 23m at 3.77 g/t Au from 57 metres depth, while other drillholes located to the west and north of the prospect returned broad zones of anomalous a·nom·a·lous  
adj.
1. Deviating from the normal or common order, form, or rule.

2. Equivocal, as in classification or nature.
 mineralisation with results generally less than 0.5 g/t Au.

The initial interpretation of these equivocal EQUIVOCAL. What has a double sense.
     2. In the construction of contracts, it is a general rule that when an expression may be taken in two senses, that shall be preferred which gives it effect. Vide Ambiguity; Construction; Interpretation; and Dig.
 results indicates that more work is required to determine the nature of the controls and orientation of mineralisation in this area. Accordingly, additional mapping and drilling work will be scheduled to further explore for continuity of mineralisation between the proposed pit and the Sorowar East area.

In summary, the Company considers the recent drilling programme to have substantially expanded the resource potential of the Sorowar deposit thus underpinning un·der·pin·ning  
n.
1. Material or masonry used to support a structure, such as a wall.

2. A support or foundation. Often used in the plural.

3. Informal The human legs. Often used in the plural.
 increased gold production. Further infill and step out drilling to continue exploring for lateral lateral /lat·er·al/ (-il)
1. denoting a position farther from the median plane or midline of the body or a structure.

2. pertaining to a side.


lat·er·al
adj.
1.
 and depth extensions to this deposit is being scheduled.

Analytical Procedures Analytical Procedures is one of financial audit skill which help an auditor understand the client's business and changes in the business, to identify potential risk areas and to plan other audit procedures.

For each single metre of drilling, a sample is collected and treated at the SMJV's Simberi Island Simberi Island is a volcanic island in the Tabar Group in Papua New Guinea's New Ireland Province.

Coordinates:  
 sample preparation facility prior to being airfreighted to ALS Als (äls), Ger. Alsen, island, 121 sq mi (313 sq km), Sønderjylland co., S Denmark, in the Lille Bælt, separated from the mainland by the narrow Alensund.  Chemex Laboratories in Townsville Townsville, city (1991 pop. 101,398), NE Queensland, Australia, on Cleveland Bay. It is a major port. Wool, hides, meat, copper, and sugar are the chief exports. Copper and sugar refining, meat and fish packing and freezing, and cement making are other industries.  for analysis.

Sample treatment procedures are:

- Simberi Island

The entire one metre drill sample ( 20kg) is dried, crushed through a jaw crusher crusher, machine used to reduce materials such as ore, coal, stone, and slag to particle sizes that are convenient for their intended uses. Crushers operate by slowly applying a large force to the material to be reduced.  and hammer milled to approximately 500 microns in size. The sample is mixed and split down to 1kg in weight then 400gms of the sample is collected, packaged and airfreighted to Townsville.

- Townsville

The sample is pulverised Adj. 1. pulverised - consisting of fine particles; "powdered cellulose"; "powdery snow"; "pulverized sugar is prepared from granulated sugar by grinding"
fine-grained, powdered, powdery, pulverized, small-grained
 to less than75 microns at ALS Chemex Laboratories prior to assaying assaying (əsā`yĭng, ăs`āyĭng), in metallurgy, process of determining the specific metallic content of an ore, alloy, or other substance, especially one containing precious metals.  for gold by fire assay (50gm) with AAS finish and for Ag, As, Cu, Fe, Mn, Pb, S, Sb and Zn by aqua regia aqua regia (äk`wə rē`jēə) [Lat.,=royal water], corrosive, fuming yellow liquid prepared by mixing one volume of concentrated nitric acid with three to four volumes of concentrated hydrochloric acid.  digest and ICP-AES ICP-AES Inductively Coupled Plasma Atomic Emission Spectroscopy
ICP-AES Inductively Coupled Plasma Atomic Emission Spectrophotometry
 finish.

During August 2004 a representative from ALS Chemex carried out a site audit on the Simberi Island sample preparation facility and reported that all procedures conform to Verb 1. conform to - satisfy a condition or restriction; "Does this paper meet the requirements for the degree?"
fit, meet

coordinate - be co-ordinated; "These activities coordinate well"
 ALS Chemex quality procedures and industry standards.

Quality control in the analytical process is monitored by inserting in·sert  
tr.v. in·sert·ed, in·sert·ing, in·serts
1. To put or set into, between, or among: inserted the key in the lock. See Synonyms at introduce.

2.
 a duplicate DUPLICATE. The double of anything.
     2. It is usually applied to agreements, letters, receipts, and the like, when two originals are made of either of them. Each copy has the same effect.
 sample for assaying for every 20 samples submitted and a standard sample comprising Sorowar ore for every 50 samples submitted to ALS Chemex.

Simberi Mining Joint Venture

The Sorowar gold deposit is located on Simberi Island, approximately 80 km to the northwest For names and places containing the slightly longer word 'northwestern' (or variants), see .

Northwest or north west is the ordinal direction halfway between north and west on a compass. It is the opposite of southeast.
 of Lihir Island Lihir Island is the largest island of the Lihir Group, Papua New Guinea. It is about 20 km long and consists of a complex of several overlapping basaltic stratovolcanoes, and reaches a height of 700 metres.  in the New Ireland New Ireland, volcanic island (1990 pop. 64,615), c.3,340 sq mi (8,650 sq km), SW Pacific, in the Bismarck Archipelago, part of Papua New Guinea. New Ireland is largely mountainous, rising to c.4,000 ft (1,220 m).  Archipelago Archipelago (ärkĭpĕl`əgō) [Ital., from Gr.=chief sea], ancient name of the Aegean Sea, later applied to the numerous islands it contains. The word now designates any cluster of islands.  of eastern Papua New Guinea Papua New Guinea (păp`ə, –y . Sorowar is subject to the Simberi Mining Joint Venture, a 50%/50% joint venture between Simberi Gold Corporation and Nord Pacific Limited ("Nord").

Pursuant to a merger arrangement with Allied Gold Limited ("Allied") which was completed on 20 September September: see month.  2004, Nord is a wholly-owned subsidiary of Allied.

The SMJV holds a mining lease over the central and eastern portion of Simberi Island, the northernmost island of the Tabar Tabar is Pashtun tribal organization.

More precisely, there are several levels of organization: the Tabar (tribe) is subdivided into kinship groups each of which is a Khel.
  Island Group and so far, the SMJV has identified gold resources totalling 1.49 million ounces within the mining lease comprising:
- Oxide Resources
Measured, indicated and inferred (free milling-type - 0.5 g/t Au
cutoff)
19.7 million tonnes at 1.17g/t Au     (740,000 ounces)

- Sulphide Resources
Inferred (refractory-type - 1.0 g/t Au cutoff)
9.3 million tonnes at 2.5 g/t Au     (750,000 ounces)



The information in this Stock Exchange Announcement that relates to mineral resources Noun 1. mineral resources - natural resources in the form of minerals
natural resource, natural resources - resources (actual and potential) supplied by nature
 is based on information compiled by Minstat Pty Ltd whose principal is Mr M J Binns Binns can mean: People
  • Pat Binns, a Canadian politician
  • Binns (company)
  • Cuthbert Binns, a teacher in the Harry Potter stories
  • Jack R. Binns, U.S.
 who is a fellow/member of the Australasian Aus·tral·a·sia  

1. The islands of the southern Pacific Ocean, including Australia, New Zealand, and New Guinea.

2. Broadly, all of Oceania.



Aus
 Institute of Mining and Metallurgy metallurgy (mĕt`əlûr'jē), science and technology of metals and their alloys. Modern metallurgical research is concerned with the preparation of radioactive metals, with obtaining metals economically from low-grade ores, with . Mr Binns has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Possessing the necessary reasoning abilities or legal qualifications; qualified; capable; sufficient.

A court is competent if it has been given jurisdiction, by statute or constitution, to hear particular types of lawsuits.
 Person as defined in the 1999 Edition of the "Australasian Code for Reporting of Mineral Resources and Ore Reserves".

Mr Binns consents to the inclusion in this Announcement of the material based on this information in the form and context in which it appears.

All information in this report pertaining per·tain  
intr.v. per·tained, per·tain·ing, per·tains
1. To have reference; relate: evidence that pertains to the accident.

2.
 to exploration results, together with any related assessments and interpretations, has been approved for release by Mr. R. Hastings Hastings, city, England
Hastings, city (1991 pop. 74,979) and district, East Sussex, SE England. A resort and residential city, Hastings is backed by cliffs and has a 3-mi (4.8-km) marine esplanade, parks, and bathing beaches.
, MSc, BSc., M.Aus.I.M.M., a qualified geologist and full-time full-time
adj.
Employed for or involving a standard number of hours of working time: a full-time administrative assistant.



full
 employee of Allied Gold Ltd.. Mr Hastings has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 1999 Edition of the "Australasian Code for Reporting of Mineral Resources and Ore Reserves".

A map is available on CCNMatthews' website at:

http://www2.cdn-news.com/database/fax/2000/sgc1013.pdf

This press release includes certain "Forward-Looking Statements forward-looking statement

A projected financial statement based on management expectations. A forward-looking statement involves risks with regard to the accuracy of assumptions underlying the projections.
" within the meaning of the US Private Securities Reform Act of 1995. Other than statements of historical fact, all statements are "Forward-Looking Statements" that involve such various known and unknown risks, uncertainties and other factors. There can be no assurance that such statements will prove accurate. Results and future events could differ materially from those anticipated in such statements. Readers of this press release are cautioned not to place undue reliance on these "Forward-Looking Statements". All dollar amounts are Canadian dollars Noun 1. Canadian dollar - the basic unit of money in Canada; "the Canadian dollar has the image of loon on one side of the coin"
loonie

dollar - the basic monetary unit in many countries; equal to 100 cents
 unless otherwise noted.

The TSX Venture Exchange TSX Venture Exchange

Originally called the Canadian Venture Exchange (CDNX), this was a result of the merger of the Vancouver and Alberta stock exchanges. The goal of TSX Venture Exchange is to provide venture companies with effective access to capital while protecting investors.
 Inc. has neither approved nor disapproved the information herein contained.

Simberi Gold Corporation (TSX TSX Toronto Stock Exchange (TSE before April, 2002)
TSX Transfer from Stack Pointer to Index
TSX True Space Extension
 VENTURE:SAU)
COPYRIGHT 2004 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2004, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Geographic Code:1USA
Date:Oct 13, 2004
Words:2947
Previous Article:Fitch Ratings Affirms Credit Suisse First Boston, Series 2001-CK3.
Next Article:Research And Markets: Life Scientist Preferences And Opinions Examined Like Never Before.
Topics:



Related Articles
Nord Pacific Intersects High Grade Gold Mineralization at Tabar Islands Project.
Eldorado Gold Corporation - Drilling Resumes at Kisladag Gold Project Western Turkey.
Lumina Copper Corp.: Significant Discovery of New Mineralization at Regalito with Substantial Tonnage Potential.
Lumina Copper Corp.: Drilling Continues to Discover Significant Leachable Copper Mineralization at Regalito.
Sorowar Drilling Programme-Simberi Oxide Gold Project.
PGM Ventures Corporation: Press Release.
Sorowar Drilling Program-Simberi Oxide Gold Project.
PGM Ventures Corporation: Further Extensions To The Sorowar Oxide Gold Resource From Latest RC Drilling Results-Simberi Gold Project.
Simberi Gold Corporation: Press Release.
Simberi Gold Corporation: Press Release.

Terms of use | Copyright © 2010 Farlex, Inc. | Feedback | For webmasters | Submit articles