Printer Friendly
The Free Library
18,914,768 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

Foster Wheeler wins $174.4 million contract to supply boilers for Chinese Power project.


CLINTON, N.J.--(BUSINESS WIRE)--Nov. 8, 1996---Foster Wheeler Energy Corp, a subsidiary of Foster Wheeler Energy International Inc. signed a $174.4 million contract with Hebei Electric Power Corp. (HEPC HepC Hepatitis C
HEPC Handloom Export Promotion Council (India)
HEPC Historical Electromagnetic Propagation Conditions
HEPC High Energy Proportional Counter
HEPC Hispanic Employment Program Coordinator
) to supply two 660 MW anthracite-fired boilers and auxiliaries for a Chinese power plant, it was announced here today.

The owner of the plant, Hebei Hanfeng Power Generating Co., Limited, is a joint venture company that includes HEPC, the operating power company; Hebei Construction and Investment Corp.; North China Power Co.; and Siemens Power Development Hanfeng GmbH, a power plant investment subsidiary of Siemens AG Siemens AG

German electrical-equipment manufacturer. The first Siemens company, Siemens & Halske, was founded in Berlin in 1847 to build telegraph installations.
.

Foster Wheeler Energy Corp. (FWEC FWEC Foster Wheeler Energy Corporation ) is a consortium partner with the Siemens Power Generation Group for the supply of the main power block equipment, including turbine generator, boiler, instrumentation and controls, ash handling and other related components for each of the two units.

FWEC will supply the arch-fired boilers; the firing systems including bunkers, coal feeders and pulverizers, coal burners with oil igniters; boiler and mill bay structures and enclosures; air/flue gas duct system including fans/air heaters; and electrostatic precipitator Noun 1. electrostatic precipitator - removes dust particles from gases by electrostatic precipitation
Cottrell precipitator, precipitator

electrical device - a device that produces or is powered by electricity
.

Because the plant is to burn a pulverized pul·ver·ize  
v. pul·ver·ized, pul·ver·iz·ing, pul·ver·iz·es

v.tr.
1. To pound, crush, or grind to a powder or dust.

2. To demolish.

v.intr.
 blend of very-low- volatile anthracite anthracite (ăn`thrəsīt'): see coal.
anthracite
 or hard coal

Coal containing more fixed carbon than any other form of coal and the lowest amount of volatile (quickly evaporating) material, giving it the
 with low-volatile "lean" coal, Foster Wheeler's recognized leadership in the design and fabrication fabrication (fab´rikā´shn),
n the construction or making of a restoration.
 of boilers capable of burning anthracite efficiently was a critical factor in its selection for this project by HEPC.

The plant will be located in Yijing, a town near Handan City in Hebei Province, about 420 km southwest of Beijing. The power generated at the facility will serve the growing industrial cities of Hebei Province.

Foster Wheeler Energy International Inc. designs and fabricates steam-generating equipment for electric utilities, industrial users and public authorities globally.

Foster Wheeler Corp. is a global company offering a broad range of design, engineering, construction, manufacturing, project development and management, research, plant operations, and environmental services. The Corporation's headquarters are at Clinton, N.J.

CONTACT: Foster Wheeler Corp., Clinton

Harry Levy, 908/730-4448

or

Richard C. Kroll, 908/730-4444
COPYRIGHT 1996 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 1996, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Date:Nov 8, 1996
Words:327
Previous Article:SPC signs letter of intent for joint venture on concessions in Paraguay.
Next Article:Airgen Corporation to Acquire Petro-Therm Enterprises Ltd.
Topics:



Related Articles
Foster Wheeler Energy to supply equipment for new 'coal-by-wire' power station in China.
Foster Wheeler will supply ball mill pulverizers to China's Jingyuan power plant, Gansu Province.
Foster Wheeler awarded contract to supply two CFB boilers to power plant in Poland.
Top Foster Wheeler Executives, PRC officials dedicate new manufacturing facility in China.
Foster Wheeler is Awarded $136 Million EPC Contract For Steam Generating Plant To Support Toledo Edison Station.
Foster Wheeler Is Awarded Contract To Supply Circulating Fluidized-Bed Boiler in Sweden.
Foster Wheeler and CNIM to Conduct Study on 600 MW Supercritical CFB Boiler Design for Electricite De France.
Foster Wheeler and ABB Alstom Power Awarded $667 Million Contract for a Repowering Project in Poland.
Foster Wheeler Awarded $100 Million Contract for Two 700 MW Power Projects in Egypt.
Foster Wheeler Awarded Supercritical Once-Through Pulverized Coal Steam Generator for Longview Power Project in West Virginia.

Terms of use | Copyright © 2010 Farlex, Inc. | Feedback | For webmasters | Submit articles