Printer Friendly
The Free Library
14,694,313 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

Final Rule Established for Iron and Steel MACT.


In August, the administrator of the U.S. EPA EPA eicosapentaenoic acid.

EPA
abbr.
eicosapentaenoic acid


EPA,
n.pr See acid, eicosapentaenoic.

EPA,
n.
 signed the final rule establishing the National Emissions Standards for Hazardous Air Pollutants The National Emissions Standards for Hazardous Air Pollutants (NESHAPS) are emissions standards set by the United States EPA for an air pollutant not covered by NAAQS that may cause an increase in fatalities or in serious, irreversible, or incapacitating illness.  (NESHAP NESHAP National Emission Standards for Hazardous Air Pollutants (US EPA) ) from iron and steel foundries (referred to as the MACT MACT Maximum Achievable Control Technology
MACT Maximum Available Control Technology
MACT Men of All Colors Together
MACT Minnesota Association of Community Theatres
MACT Maulana Azad College of Technology (Bhopal, India) 
 standards).

The AFS A distributed file system for large, widely dispersed Unix and Windows networks from Transarc Corporation, now part of IBM. It is noted for its ease of administration and expandability and stems from Carnegie-Mellon's Andrew File System.

AFS - Andrew File System
 10E MACT Ad-hoc Committee worked with EPA to modify many of the requirements from its proposed rule (issued in December December: see month. ), including the elimination of two key controversial provisions. For example, the 200 ft/min capture velocity requirement on all local exhaust hoods Noun 1. exhaust hood - metal covering leading to a vent that exhausts smoke or fumes
hood

covering - an artifact that covers something else (usually to protect or shelter or conceal it)

range hood - exhaust hood over a kitchen range
 was replaced by language directing foundries to follow good engineering practices in the design of the system.

A chart summarizing the requirements of the MACT standards for iron and steel foundries is shown on p. 13. A larger version of the same chart is available at www.moderncasting.com. A copy of the final rule is posted on the AFS website, www.afsinc.org See .org.

(networking) org - The top-level domain for organisations or individuals that don't fit any other top-level domain (national, com, edu, or gov). Though many have .org domains, it was never intended to be limited to non-profit organisations.

RFC 1591.
. If you have any questions, contact Gary Gary, city (1990 pop. 116,646), Lake co., NW Ind., a port of entry on Lake Michigan; inc. 1909. Gary was founded by the U.S. Steel Corporation, which purchased the land in 1905 and landscaped it for a city.  Mother, AFS, at 800/537-4237 x228.
Iron and Steel MACT Rule Synopsis (download a larger version at
www.moderncasting.com)

Final rule signed August 29, 2003

Emission              Emission Limit or     Comment
Source                Work Practice
                      Standard

Cupolas Existing      PM limit of 0.006
Cupolas               gr/dscf or total
                      metal HAP of
                      0.0005 gr/dscf
New Cupolas           PM limit of 0.002
                      gr/dscf or total
                      metal HAP of
                      0.0002 gr/dscf
All new &             VOHAP limit of 20     Afterburners at 130OF (15
existing Cupolas      ppmv (corrected to    min. avg.) Accommodations
                      10% 02)               for start-up and off blast
                                            time)

Electric Melting Furnaces
Existing Induction    PM limit of 0.005
& Electric Arc        gr/dscf or total
Furnaces              metal HAP of
                      0.0004 gr/dscf
New Induction         PM limit of 0.001
Furnaces              gr/dscf or total
                      metal HAP of
                      0.00008 gr/dscf
New Electric          PM limit of 0.002
Arc Furnaces          gr/dscf or total
                      metal HAP of
                      0.0002 gr/dscf

All Melting Furnaces
                      Scrap Certifica-      Supplier Certification: No
                      tion or               post-consumer automotive
                                            scrap, oily turnings,
                                            plastics, mercury switches,
                                            lead or organic liquids.
                      Scrap Selection       Supplier certifies no Hg
                      and Inspection        switches or Pb components
                      Program               and foundry inspects all
                                            incoming scrap according to
                                            written diagram and proce-
                                            dures. Also restrictions on
                                            oil and free liquids.

Scrap Preheater
Existing Scrap        PM limit of 0.005
Preheaters            gr/dscf or total
                      metal HAP of
                      0.0004 gr/dscf
                      a) VOHAP limit of     Implies afterburner if not
                      20 ppmv (good         b) of c),
                      engineering cap-
                      ture system or
                      b) Direct contact     if not direct contact =
                      gas-fired pre-        afterburner
                      heater or
                      c) Scrap Certifi-
                      cation
New Scrap             PM limit of 0.001
Preheaters            gr/dscf or total
                      metal HAP of
                      0.0008 gr/dscf
                      VOHAP limit of 20     Possible afterburner, if
                      ppmv (good engi-      not heavy flame penetration
                      neering capture       or scrap certification
                      system) or scrap
                      certification

Pouring
Existing Pouring      PM limit of 0.010     If existing emissions dis-
Stations              gr/dscf or total      charged to the atmosphere
                      metal HAP of          through a "conveyance)
                      0.0008 gr/dscf
New Pouring           PM limit of 0.002     If emissions discharged to
Stations or           gr/dscf or total      the atmosphere through a
pouring areas         metal HAP of          "conveyance"
                      0.0002 gr/dscf
Mold Vent Light-      Mold vents sponta-    Contains procedures for
Off                   neously ignite or     igniting mold vents at
                      they are manually     pouring stations and areas
                      ignited               if it is determined that
                                            they do not spontaneously
                                            ignite.
Fugitive Emissions    Building opacity      Applies to all building
from a building       20% opacity,          openings (desired to mo-
or structure          except for one        nitor uncollected pouring,
                      6-min period per      cooling & shakeout)
                      hour that does not
                      exceed 27%
                      opacity.

Cooling and Shakeout                        Emissions must be captured.
Now Cooling and       VOHAP limit to 20     For automated conveyor and
Shakeout lines        ppmv (flow            pallet lines that use sand
                      weighted average)     mold systems or automated
                                            shakeout lines that use
                                            sand mold systems

Written Plans
Operation &           Describes capture     Also must contain many
Maintenance Plan      and control           details of system, inclu-
                      systems, lists        ding damper settings, gauge
                      system parameters     settings, test points, etc.
                      appropriate to
                      evaluate perfor-
                      mance and esta-
                      blishes operating
                      limit for those
                      parameters. The
                      plan also must
                      include require-
                      ments for system
                      inspections, PM
                      procedures (with
                      schedules), and
                      procedures for
                      corrective
                      actions. Bag leak
                      detectors required
                      on all collection
                      devices with PM
                      limits.
                      Mold Vent Light       Contains procedures for
                      Off (Part of O & M    igniting mold vents at
                      Plan)                 pouring stations and
                                            pouring areas if it is
                                            determined that they do not
                                            spontaneously ignite.
Start-up, Shutdown    Must meet require-
& Malfunction Plan    ments of 9
                      [section] 63.6 (e)
                      of NESHAP General
                      Provisions (68 FR
                      32586, May 30,
                      2003)
Scrap Selection &     See above, under
Inspection Plan       "All Melting
                      Furnaces"
Furan warm box        No methanol, as
mold of core          listed in the MSDS
making                (applies to
                      catalyst portion
                      only)
Triethylamine (TEA)   Control discharge
coldbox mold or       of scrubber to 1
core production       ppmv TEA or de-
(new or existing      monstrate a 99%
facilities)           control efficiency
                      (as determined
                      with fresh acid
                      solution)

Emission              Emission Limit or     Monitoring
Source                Work Practice         Requirements
                      Standard

Cupolas Existing      PM limit of 0.006     Broken bag detectors,
Cupolas               gr/dscf or total      P, etc. (Note 1)
                      metal HAP of
                      0.0005 gr/dscf
New Cupolas           PM limit of 0.002     Broken bag detectors,
                      gr/dscf or total      P, etc. (Note 1)
                      metal HAP of
                      0.0002 gr/dscf
All new &             VOHAP limit of 20     Afterburner
existing Cupolas      ppmv (corrected to    temperature
                      10% 02)               (continuous)

Electric Melting Furnaces
Existing Induction    PM limit of 0.005     Broken bag detectors,
& Electric Arc        gr/dscf or total      P, etc. (Note 1)
Furnaces              metal HAP of
                      0.0004 gr/dscf
New Induction         PM limit of 0.001     Broken bag detectors,
Furnaces              gr/dscf or total      P, etc. (Note 1)
                      metal HAP of
                      0.00008 gr/dscf
New Electric          PM limit of 0.002     Broken bag detectors,
Arc Furnaces          gr/dscf or total      P, etc. (Note 1)
                      metal HAP of
                      0.0002 gr/dscf

All Melting Furnaces
                      Scrap Certifica-
                      tion or
                      Scrap Selection       Written plan with
                      and Inspection        heavy on-going
                      Program               documentation

Scrap Preheater
Existing Scrap        PM limit of 0.005     Broken bag detectors,
Preheaters            gr/dscf or total      P, etc. (Note 1)
                      metal HAP of
                      0.0004 gr/dscf
                      a) VOHAP limit of
                      20 ppmv (good
                      engineering cap-
                      ture system or
                      b) Direct contact
                      gas-fired pre-
                      heater or
                      c) Scrap Certifi-
                      cation
New Scrap             PM limit of 0.001     Broken bag detectors,
Preheaters            gr/dscf or total      P, etc. (Note 1)
                      metal HAP of
                      0.0008 gr/dscf
                      VOHAP limit of 20
                      ppmv (good engi-
                      neering capture
                      system) or scrap
                      certification

Pouring
Existing Pouring      PM limit of 0.010     Broken bag detectors,
Stations              gr/dscf or total      P, etc. (Note 1)
                      metal HAP of
                      0.0008 gr/dscf
New Pouring           PM limit of 0.002     Broken bag detectors,
Stations or           gr/dscf or total      P, etc. (Note 1)
pouring areas         metal HAP of
                      0.0002 gr/dscf
Mold Vent Light-      Mold vents sponta-    Documentation required.
Off                   neously ignite or
                      they are manually
                      ignited
Fugitive Emissions    Building opacity      Formal opacity readings
from a building       20% opacity,
or structure          except for one
                      6-min period per
                      hour that does not
                      exceed 27%
                      opacity.

Cooling and Shakeout
Now Cooling and       VOHAP limit to 20     Continuous Emissions
Shakeout lines        ppmv (flow            Monitoring
                      weighted average)     (CEMS) required

Written Plans
Operation &           Describes capture     Routine documented
Maintenance Plan      and control           inspections,
                      systems, lists
                      system parameters
                      appropriate to
                      evaluate perfor-
                      mance and esta-
                      blishes operating
                      limit for those
                      parameters. The
                      plan also must
                      include require-
                      ments for system
                      inspections, PM
                      procedures (with
                      schedules), and
                      procedures for
                      corrective
                      actions. Bag leak
                      detectors required
                      on all collection
                      devices with PM
                      limits.
                      Mold Vent Light       Documentation required.
                      Off (Part of O & M
                      Plan)
Start-up, Shutdown    Must meet require-
& Malfunction Plan    ments of 9
                      [section] 63.6 (e)
                      of NESHAP General
                      Provisions (68 FR
                      32586, May 30,
                      2003)
Scrap Selection &     See above, under
Inspection Plan       "All Melting
                      Furnaces"
Furan warm box        No methanol, as
mold of core          listed in the MSDS
making                (applies to
                      catalyst portion
                      only)
Triethylamine (TEA)   Control discharge     Scrubber parameters,
coldbox mold or       of scrubber to 1      including pH and liquid
core production       ppmv TEA or de-       flow. PH <4.5 measured
(new or existing      monstrate a 99%       at end of shift.
facilities)           control efficiency
                      (as determined
                      with fresh acid
                      solution)

Emission              Emission Limit or     Compliance
Source                Work Practice         Demonstration
                      Standard

Cupolas Existing      PM limit of 0.006     Initial compliance stack
Cupolas               gr/dscf or total      test (Note 2) repeated at
                      metal HAP of          least every
                      0.0005 gr/dscf
New Cupolas           PM limit of 0.002     Initial compliance stack
                      gr/dscf or total      test (Note 2) repeated at
                      metal HAP of          least every 5 yr
                      0.0002 gr/dscf
All new &             VOHAP limit of 20     Initial compliance stack
existing Cupolas      ppmv (corrected to    test (Note 3) repeated
                      10% 02)               at least every 5 yr

Electric Melting Furnaces
Existing Induction    PM limit of 0.005     Initial compliance stack
& Electric Arc        gr/dscf or total      test (Note 2) repeated
Furnaces              metal HAP of          at least every 5 yr
                      0.0004 gr/dscf
New Induction         PM limit of 0.001     Initial compliance stack
Furnaces              gr/dscf or total      test (Note 2) repeated at
                      metal HAP of          least every 5 yr
                      0.00008 gr/dscf
New Electric          PM limit of 0.002     Initial compliance stack
Arc Furnaces          gr/dscf or total      test (Note 2) repeated
                      metal HAP of          at least every 5 yr
                      0.0002 gr/dscf

All Melting Furnaces
                      Scrap Certifica-
                      tion or
                      Scrap Selection       Certify that plan has
                      and Inspection        been prepared
                      Program

Scrap Preheater
Existing Scrap        PM limit of 0.005     Initial compliance stack
Preheaters            gr/dscf or total      test (Note 2) repeated at
                      metal HAP of          least every 5 yr
                      0.0004 gr/dscf
                      a) VOHAP limit of     Initial compliance stack
                      20 ppmv (good         test (Note 3) Certify
                      engineering cap-      direct flame contact type
                      ture system or
                      b) Direct contact
                      gas-fired pre-
                      heater or
                      c) Scrap Certifi-
                      cation
New Scrap             PM limit of 0.001     Start-up performance
Preheaters            gr/dscf or total      testing (Note 2) repeated
                      metal HAP of          at least every 5 yr
                      0.0008 gr/dscf
                      VOHAP limit of 20     Initial compliance stack
                      ppmv (good engi-      test (Note 3) Certify that
                      neering capture       plan has been prepared
                      system) or scrap
                      certification

Pouring
Existing Pouring      PM limit of 0.010     Initial compliance stack
Stations              gr/dscf or total      test (Note 2) repeated
                      metal HAP of          at least every 5 yr
                      0.0008 gr/dscf
New Pouring           PM limit of 0.002     Start-up performance
Stations or           gr/dscf or total      testing (Note 7) repeated
pouring areas         metal HAP of          at least every S yr
                      0.0002 gr/dscf
Mold Vent Light-      Mold vents sponta-    Certify that plan has
Off                   neously ignite or     been prepared
                      they are manually
                      ignited
Fugitive Emissions    Building opacity      Initial opacity reading
from a building       20% opacity,          (Note 4) repeated every
or structure          except for one        6 months thereafter
                      6-min period per
                      hour that does not
                      exceed 27%
                      opacity.

Cooling and Shakeout
Now Cooling and       VOHAP limit to 20     Start-up performance
Shakeout lines        ppmv (flow            stack test
                      weighted average)

Written Plans
Operation &           Describes capture     Certify list plan has been
Maintenance Plan      and control           prepared and that the
                      systems, lists        foundry will operate
                      system parameters     equipment according to
                      appropriate to        the plan. Semiannual
                      evaluate perfor-      deviation reports.
                      mance and esta-
                      blishes operating
                      limit for those
                      parameters. The
                      plan also must
                      include require-
                      ments for system
                      inspections, PM
                      procedures (with
                      schedules), and
                      procedures for
                      corrective
                      actions. Bag leak
                      detectors required
                      on all collection
                      devices with PM
                      limits.
                      Mold Vent Light       Certify that plan has been
                      Off (Part of O & M    prepared. Semiannual com-
                      Plan)                 pliance certification
                                            stating that the procedures
                                            have been followed.
Start-up, Shutdown    Must meet require-
& Malfunction Plan    ments of 9
                      [section] 63.6 (e)
                      of NESHAP General
                      Provisions (68 FR
                      32586, May 30,
                      2003)
Scrap Selection &     See above, under      Certify trial plan has been
Inspection Plan       "All Melting          prepared (if plan is
                      Furnaces"             required).
Furan warm box        No methanol, as
mold of core          listed in the MSDS
making                (applies to
                      catalyst portion
                      only)
Triethylamine (TEA)   Control discharge     Initial compliance stack
coldbox mold or       of scrubber to 1      test repeated at
core production       ppmv TEA or de-       least every 5 yr
(new or existing      monstrate a 99%
facilities)           control efficiency
                      (as determined
                      with fresh acid
                      solution)

Emission              Emission Limit or     Compliance
Source                Work Practice         Date
                      Standard

Cupolas Existing      PM limit of 0.006     3 yr from
Cupolas               gr/dscf or total      5 yr rule publication
                      metal HAP of
                      0.0005 gr/dscf
New Cupolas           PM limit of 0.002     At start-up
                      gr/dscf or total      of new cupola
                      metal HAP of
                      0.0002 gr/dscf
All new &             VOHAP limit of 20     3 yr for existing
existing Cupolas      ppmv (corrected to    cupolas, at start-up
                      10% 02)               for new cupolas

Electric Melting Furnaces
Existing Induction    PM limit of 0.005     3 yr from
& Electric Arc        gr/dscf or total      rule publication
Furnaces              metal HAP of
                      0.0004 gr/dscf
New Induction         PM limit of 0.001     At start-up for
Furnaces              gr/dscf or total      new furnaces
                      metal HAP of
                      0.00008 gr/dscf
New Electric          PM limit of 0.002
Arc Furnaces          gr/dscf or total
                      metal HAP of
                      0.0002 gr/dscf

All Melting Furnaces
                      Scrap Certifica-      1 yr from rule
                      tion or               publication
                      Scrap Selection       1 yr from rue
                      and Inspection        publication
                      Program

Scrap Preheater
Existing Scrap        PM limit of 0.005     3 yr from rule
Preheaters            gr/dscf or total      publication
                      metal HAP of
                      0.0004 gr/dscf
                      a) VOHAP limit of     3 yr from rule publication
                      20 ppmv (good         3 yr from rule publication
                      engineering cap-      1 yr from rule publication
                      ture system or
                      b) Direct contact
                      gas-fired pre-
                      heater or
                      c) Scrap Certifi-
                      cation
New Scrap             PM limit of 0.001     At start-up of
Preheaters            gr/dscf or total      new preheaters
                      metal HAP of
                      0.0008 gr/dscf
                      VOHAP limit of 20     1 yr from rule publication
                      ppmv (good engi-
                      neering capture
                      system) or scrap
                      certification

Pouring
Existing Pouring      PM limit of 0.010     3 yr from rule
Stations              gr/dscf or total      publication
                      metal HAP of
                      0.0008 gr/dscf
New Pouring           PM limit of 0.002     At start-up for
Stations or           gr/dscf or total      new lines
pouring areas         metal HAP of
                      0.0002 gr/dscf
Mold Vent Light-      Mold vents sponta-    3 yr from rule publication
Off                   neously ignite or
                      they are manually
                      ignited
Fugitive Emissions    Building opacity      3 yr from rule publication
from a building       20% opacity,
or structure          except for one
                      6-min period per
                      hour that does not
                      exceed 27%
                      opacity.

Cooling and Shakeout
Now Cooling and       VOHAP limit to 20     At start-up
Shakeout lines        ppmv (flow
                      weighted average)

Written Plans
Operation &           Describes capture     3 yr from rule publication
Maintenance Plan      and control
                      systems, lists
                      system parameters
                      appropriate to
                      evaluate perfor-
                      mance and esta-
                      blishes operating
                      limit for those
                      parameters. The
                      plan also must
                      include require-
                      ments for system
                      inspections, PM
                      procedures (with
                      schedules), and
                      procedures for
                      corrective
                      actions. Bag leak
                      detectors required
                      on all collection
                      devices with PM
                      limits.
                      Mold Vent Light       3 yr from rule publication
                      Off (Part of O & M
                      Plan)
Start-up, Shutdown    Must meet require-    3 yr from rule publication
& Malfunction Plan    ments of 9
                      [section] 63.6 (e)
                      of NESHAP General
                      Provisions (68 FR
                      32586, May 30,
                      2003)
Scrap Selection &     See above, under      1 yr from rule publication
Inspection Plan       "All Melting
                      Furnaces"
Furan warm box        No methanol, as
mold of core          listed in the MSDS
making                (applies to
                      catalyst portion
                      only)
Triethylamine (TEA)   Control discharge     3 yr from rule publication
coldbox mold or       of scrubber to 1
core production       ppmv TEA or de-
(new or existing      monstrate a 99%
facilities)           control efficiency
                      (as determined
                      with fresh acid
                      solution)

Note (1): Continuous Parametric Monitoring System (CPMS) required.
Implies continuous readings available, but does not mandate continuous
record. Recording frequency to be described in O & M Plan.

Note (2): To determine compliance with the metal HAP emissons limits.
EPA Method 1 through 4, and either Method 5, 5B, 5D, 5F or 5I, as
applicaple (to measure PM) a Method 29 (to measure total meal HAP) are
required.

Note (3): To determine compliance with the organic HAP limits, use EPA
Method 18 to measure VOHAP, Method 25 to measure total gaseous
non-methane (TBNMO) as hexane, or Method 25A to measure total organic
compounds (TOC) as hexane.

Note (4): To measure opacity, use EPA Method 9.

Compiled by Jim White, Grede Foundries, Inc. Reviewed by AFS MAHC
Steering Committee.
COPYRIGHT 2003 American Foundry Society, Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2003, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Title Annotation:North America; Maximum Achievable Control Technology
Comment:Final Rule Established for Iron and Steel MACT.(North America; Maximum Achievable Control Technology)
Publication:Modern Casting
Geographic Code:1USA
Date:Oct 1, 2003
Words:2766
Previous Article:Amite Foundry melts World Trade Center steel for New U.S. Navy ship, USS New York.(North America)(Brief Article)
Next Article:DaimlerChrysler to phase out Indianapolis foundry.(North America)(Brief Article)
Topics:



Related Articles
CERP: Helping Foundries Identify Routes to Reduced Air Emissions.(Castings Emissions Reduction Program)
Bringing AFS Research into Focus.
Metalcasters Take the Issues to Capitol Hill.
Larry Cottrell: A 'Foundryman' Tackling GM's Environmental Issues.(Environmental and production issues in foundry business)
CORE BINDERS: A Look into the Future.
Making Sense of MACT: An Analysis of the Anticipated Iron and Steel Foundry Standards.(Maximum Achievable Control Technology )
U.S. EPA takes final action on MACT "hammer provision" deadlines. (Washington Alert).(Maximum Achievable Control Technology)(Brief Article)
U.S. EPA to reward facilities named top environmental performers. (Washington Alert).(Brief Article)
GMD's CERT system controls emissions, significantly reduces exhaust volumes. (Technology in Action).(GMD Environmental Technologies Inc.)(Brief...
Final iron and steel MACT rule to come to a head in August.(North America)(Maximum Achievable Control Technology)(Brief Article)

Terms of use | Copyright © 2009 Farlex, Inc. | Feedback | For webmasters | Submit articles