Escape artist: design changes involving a standoff permit flux trapped under PQFNs to volatilize and escape.


Ed.: For the full article, please see circuits assembly.com/cms/content/view/2075/

[TEXT NOT REPRODUCIBLE IN ASCII ASCII or American Standard Code for Information Interchange, a set of codes used to represent letters, numbers, a few symbols, and control characters. Originally designed for teletype operations, it has found wide application in computers. ]

In my last column ("On a Flat Note," September 2005), I discussed an assembler's problem with flux entrapment entrapment, in law, the instigation of a crime in the attempt to obtain cause for a criminal prosecution. Situations in which a government operative merely provides the occasion for the commission of a criminal act (e.g.  under PQFN PQFN Power Quad Flat Pack No-Lead  components. PQFNs were entrapping flux residues by not permitting a path of volatilization volatilization /vol·a·til·iza·tion/ (vol?ah-til-i-za´shun) conversion into vapor or gas without chemical change.

vol·a·til·i·za·tion
n.
See evaporation.
 for the no-clean flux. Ultimately, these assemblies were failing in the field, due to stray voltage stray voltage

accumulation of low voltages in the metalwork of a milking parlor due either to leakage from poor wiring or to poor earthing (grounding) with no outlet for static electricity. Very small voltages cause restlessness and a fall in milk yield.
 causing LEDs to remain on. Based on our failure analysis, it was definitively found that this entrapped flux was the primary contributor to the field failures, and that fabrication residues played no significant role. We were then asked to develop a corrective action plan to prevent future field failures, and recover the contaminated assemblies through rescue cleaning.

[ILLUSTRATION OMITTED]

This customer implemented several corrective actions suggested by Foresite in order to prevent the flux entrapment. The first action involved the design of a standoff to support the PQFN part during reflow. Under previous design conditions, the PQFN package sat atop solder paste at a 0.006" stencil stencil, cutout device of oiled or shellacked tough and resistant paper, thin metal, or other material used in applying paint, dye, or ink to reproduce its design or lettering upon a surface.  thickness, and as the solder paste entered its molten phase, was allowed to sink down to 0.003" to 0.004". This created the opportunity for flux to sink over, becoming entrapped underneath the package, where it could not become complexed and released. To remedy this situation, we suggested a design modification in which 0.005" standoffs were designed to fit into the vent pipe vias. These standoffs would physically hold up the parts, not permitting columns of solder to collapse under the parts. A second design change we suggested was to remove some of the pads from underneath the PQFNs. Fewer pads means less opportunities for contamination. We also suggested widening the gap between the power and ground. This wider spacing decreases the risk of bridging. In addition, we suggested closer monitoring of solder paste deposition, and the use of less solder paste.

[FIGURE 1 OMITTED]

To analyze whether these suggested changes were effective in eliminating the problem of gooey See GUI.  contamination under the PQFN parts, Foresite analyzed samples manufactured with the original process and compared them to assemblies manufactured with the suggested design changes. As seen in the analysis from last month's column, the original process produced assemblies with high amounts of weak organic acid (WOA WOA Wacken Open Air (music festival)
WOA Work of Art
WOA Western Orthopaedic Association
WOA Web Offset Association (Nashville, TN)
WOA World Airways, Inc (ICAO code) 
) flux residues, and exhibited a thick, gooey flux residue underneath the PQFN components. This held true in our followup analysis of the original process, but the assemblies built with the suggested design changes, including the standoffs and modified spacing and pad placement, showed acceptably low levels of WOA residues. The flux residue was able to volatilize vol·a·til·ize  
intr. & tr.v. vol·a·til·ized, vol·a·til·iz·ing, vol·a·til·iz·es
1. To become or make volatile.

2. To evaporate or cause to evaporate.
 under these conditions, and all ionic residue levels for these assemblies fell within Foresite's recommended limits for reliable field performance (see Table 1 in online version).

[FIGURE 2 OMITTED]

Our ion chromatography findings were very encouraging, but we still had to determine whether the assemblies built with the old manufacturing process with entrapped flux under PQFNs were recoverable. Foresite was able to develop a localized recovery cleaning protocol to clean only the PQFN area of the contaminated assemblies. Through the use of localized deionized de·i·on·ize  
tr.v. de·i·on·ized, de·i·on·iz·ing, de·i·on·iz·es
To remove ions from (a solution) using an ion-exchange process.



de·i
 steam cleaning with a good saponifier sa·pon·i·fy  
v. sa·pon·i·fied, sa·pon·i·fy·ing, sa·pon·i·fies

v.tr.
1. To convert (an ester) by saponification.

2. To convert (a fat or oil) into soap.

v.intr.
, we were able to effectively remove the harmful WOA residues and gooey flux that was entrapped underneath the PQFN components. Based on a followup proof of cleaning investigation, it was found that this cleaning protocol produced results well below our recommended ionic residue limits for reliable field performance of a no-clean assembly (Figures 1 and 2).

When contamination is creating reliability problems, flux residues are often the culprit. We reiterate how important it is to fully volatilize fluxes to avoid costly field returns. In this case, a few design changes were able to correct the problem, and localized steam cleaning was able to recover the contaminated products. Understanding processing residues and their sources can prevent these issues from happening in the first place.

Terry Munson is with Foresite Inc. (residues.com); tm_foresite@residues.com. His column appears monthly.
COPYRIGHT 2005 UP Media Group, Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2005, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Title Annotation:Process Doctor
Author:Munson, Terry
Publication:Circuits Assembly
Date:Oct 1, 2005
Words:667
Previous Article:The relationship of components, alloys and fluxes, part 1: call it a love triangle--or a Bermuda Triangle. Either way, the best alloy may be...
Next Article:Direct Logix's Control Center XP.(Software Advances)



Related Articles
Too much "greenhouse" = global warming. (too much greenhouse gas)(Global Warming)
Cleaning and Rinsing Today's Designs -- Does your facility use tap water in the final rinse phase? Contaminates may be ruining your assemblies.(Brief...
Good bonds take time: inadequate reflow profiles cause weak joints and flex residues.(Process Doctor)
BRIEFLY.(News)
Mean green corrosion: avoiding residues on ImAg boards selectively soldered with no-clean flux.(Process Doctor)
On a flat note: the flat, leadless PQFN package traps flux from no-clean paste, leaving a gooey, conductive residue.(Process Doctor)
First ever storage of ultracold neutrons in a magnetic trap made of permanent magnets.
Chaotic scattering and escape times of marginally trapped ultracold neutrons.
Let it flow: a short reflow profile causes flux entrapment under low standoff components.(Process Doctor)