Printer Friendly
The Free Library
19,607,053 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

Energas Resources Updates Parkway Project; Two Additional Wells Connected to Pipeline.


OKLAHOMA CITY Oklahoma City (1990 pop. 444,719), state capital, and seat of Oklahoma co., central Okla., on the North Canadian River; inc. 1890. The state's largest city, it is an important livestock market, a wholesale, distribution, industrial, and financial center, and a farm  -- Energas Resources, Inc. (OTCBB OTCBB

See OTC Bulletin Board (OTCBB).
:EGSR EGSR Eurographics Symposium on Rendering
EGSR Employer Support of the Guard and Reserve
EGSR Engineer General Service Regiment
) is pleased to announce that two additional wells have been connected to their recently completed Parkway Project transmission pipeline, bringing the current total to four.

"While it is premature to determine stabilized production rates, we expect all four wells to produce commercial levels of natural gas and three of the four wells to also produce oil," said Scott Shaw, Vice President. "The oil has been analyzed to be 40 degree gravity sweet crude."

Shaw also stated, "Our new Vice President of Engineering, John Breitmeier, will be arriving in Kentucky today. John's extensive experience will be utilized in maximizing the Company's total production, beginning in Kentucky."

Safe Harbor Safe Harbor

1. A legal provision to reduce or eliminate liability as long as good faith is demonstrated.

2. A form of shark repellent implemented by a target company acquiring a business that is so poorly regulated that the target itself is less attractive.
 Statement

When used in this press release, the words "intends," "believes," "anticipated" and "expects" and similar expressions are intended to identify forward-looking statements forward-looking statement

A projected financial statement based on management expectations. A forward-looking statement involves risks with regard to the accuracy of assumptions underlying the projections.
. Such statements are subject to risks and uncertainties, which could cause actual results to differ materially from those projected. Factors that could cause or contribute to such differences include normal risks associated with oil and gas drilling activities. In addition, adverse weather conditions can hinder or delay operations, as can shortages of equipment and materials or unavailability of drilling, completion, and/or work-over rigs. Even though a well is completed and is found to be productive, water and/or other substances may be encountered in the well, which may impair im·pair  
tr.v. im·paired, im·pair·ing, im·pairs
To cause to diminish, as in strength, value, or quality: an injury that impaired my hearing; a severe storm impairing communications.
 or prevent production or marketing of oil or gas from the well.
COPYRIGHT 2006 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2006, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Date:Mar 30, 2006
Words:239
Previous Article:Exceptional Innovation Launches Their Highly Anticipated Lifeware 1.0.1 Software for Media Center Edition; Powerful home control solution created...
Next Article:Expesite Releases New Version of Web-Based Project Management Tool.
Topics:



Related Articles
WATER AGENCY REFUNDS $1.2 MILLION FOR PIPE.
Parkway foes commission private study.
Planned West Eugene Parkway not a done deal.
The parkway, again.
West Eugene needs a better idea than the parkway plan.
SIGNALS ARE TIMED TO AID TRAFFIC FLOW.
Report may put parkway in gear.
Parkway appeal draws city response.
Border proposals.
New parkway: Ecological disaster or economic necessity?

Terms of use | Copyright © 2012 Farlex, Inc. | Feedback | For webmasters | Submit articles