Enabling quick response manufacturing: still using your pick-and-place for debugging? Tools for surviving a zero-forecast world.


Quick Response Manufacturing (QRM QRM Qormi (postal locality, Malta)
QRM Quick Response Manufacturing
QRM Man Made Interference
QRM Quality Resource Management
QRM Quantitative Research Methods
QRM Quarterly Review Meeting
QRM Quick Response Modification
) enables organizations to meet customer demand quickly, permitting businesses to continually evaluate and react to competitive pressures. QRM eliminates non-value added activities and waste through continual reduction of lead times within the supply chain and manufacturing process.

[TEXT NOT REPRODUCIBLE IN ASCII ASCII or American Standard Code for Information Interchange, a set of codes used to represent letters, numbers, a few symbols, and control characters. Originally designed for teletype operations, it has found wide application in computers. ]

In 1903, Ford Motor Co. began mass producing automobiles. Cars were available only in black and lead time was measured in weeks. Today, customers demand variety and lead time is measured in minutes. Yet as time from concept to mass production for new products shrinks, so does profit margin. QRM is a way to increase customer satisfaction while improving the returns of the organization (Figure 1).

Historically, businesses build redundancy within internal processes and supply chains for safety measures safety measures,
n.pl actions (e.g., use of glasses, face masks) taken to protect patients and office personnel from such known hazards as particles and aerosols from high-speed rotary instruments, mercury vapor, radiation exposure, anesthetic and
. This results in wasted time and resources. Material within the supply chain can quickly depreciate depreciate v. in accounting, to reduce the value of an asset each year theoretically on the basis that the assets (such as equipment, vehicles or structures) will eventually become obsolete, worn out and of little value. (See: depreciation)  or even become obsolete. The challenge is to be more responsive to customer needs and increase flexibility while reducing inventory and waste.

QRM also requires a shift in company culture. Historically, a fixed manufacturing schedule was the norm; today it is virtually nonexistent non·ex·is·tence  
n.
1. The condition of not existing.

2. Something that does not exist.



non
. QRM systems support lead-time reduction, reduce reliance on forecasts, increase responsiveness to market demands and ultimately contribute to the profitability of the organization.

[FIGURE 1 OMITTED]

Here are QRM's key benefits.

* Concurrent and time-compressed processes. Defining product and process data at the same time the product is being designed permits faster new product introduction. By using an open programming system that imports CAD and BOM files, design data can be easily inspected and validated against current processes. This is further simplified by using centralized cen·tral·ize  
v. cen·tral·ized, cen·tral·iz·ing, cen·tral·iz·es

v.tr.
1. To draw into or toward a center; consolidate.

2.
 management of part number and component libraries enabling consistent product and process data.

A good example of software's capabilities to permit high-quality products to be defined and built is placement equipment. Effective NPI NPI National Provider Identifier, see there  processes quickly turn incoming data and materials into finished product with little-to-no waste, errors or scrap. The benchmark for NPI is complete offline simulation prior to new model introductions. This permits the production line to focus on running production jobs instead of being used for (expensive) debugging (programming) debugging - The process of attempting to determine the cause of the symptoms of malfunctions in a program or other system. These symptoms may be detected during testing or use by real users.  and programming. Debugging on the placement system reflects a failure to meet expectations and results in waste as well as increased response time. Tying up the production line to resolve NPI issues adds uncertainty to fulfillment schedules. If a company's central NPI department exports data to multiple production lines, or if facilities have suspect, non-validated or incorrect data, the entire enterprise may be put at risk. A central NPI department requires feedback from all customers to ensure that common problems are resolved in the source data. Using a single database with consolidated manufacturing and product data components reduces the dependency on informal communication.

A second benchmark for NPI is showing the CAD location of the components graphically on a scanned image of a bare PCB PCB: see polychlorinated biphenyl.
PCB
 in full polychlorinated biphenyl

Any of a class of highly stable organic compounds prepared by the reaction of chlorine with biphenyl, a two-ring compound.
. This placement simulation permits complete first-article verification at the programmer level, where modifications can be easily made. This process eliminates the need for tape or trial builds. Feeder feeder

abbreviation for self-feeders. Used in feeding groups of animals at intervals of several days. Feed has to be dry and comminuted so that it will run down the spouts from the hopper into the troughs.
 setup sheets that include a graphical depiction of the component and its orientation, coupled with user validation, enable flawless definition and execution of setups.

[FIGURE 2 OMITTED]

Although implementation of QRM processes requires reconsideration of the entire NPI process, using concurrent and time-compressed processes increases machine utilization and reduces NPI time.

* Flexible manufacturing processes. Common lead-time reduction methods include the standardization standardization

In industry, the development and application of standards that make it possible to manufacture a large volume of interchangeable parts. Standardization may focus on engineering standards, such as properties of materials, fits and tolerances, and drafting
 of tools and processes to enable product portability and to provide additional schedule flexibility. When the definition is centered on the product itself (as opposed to preparing machine-specific programs), the movement of products from line to line or from facility to facility is easily accomplished. Common modular machine elements such as feeders, programming and similar operational aspects permit workcells to become product-oriented and staff to control the activity at the cell level (Figure 2).

* Accurate and detailed scheduling. The ability to evaluate production demands quickly and accurately against resource requirements--including material availability, system capabilities and human resources--needs to be constantly analyzed an·a·lyze  
tr.v. an·a·lyzed, an·a·lyz·ing, an·a·lyz·es
1. To examine methodically by separating into parts and studying their interrelations.

2. Chemistry To make a chemical analysis of.

3.
. This continual analysis improves accuracy and reduces deviations in the expected production plan. Less time spent reacting to missed production plans means more time for building product.

* Reducing setup time and use of group technology. Setup and changeover (programming) changeover - The time when a new system has been tested successfully and replaces the old system.  activities in a high-mix environment can be the predominant workload and a large contributor to lead time. Software tools that apply group technology in planning to reduce setup activities and to meet operational scenarios, including "what if" and "delta setups," can manage and reduce setup work-load. Coupled with well-conceived hardware and software to enable offline setup, and rapid tooling and setup changeover, it is possible to conduct concurrent activities.

The best setup changeover, of course, is no changeover, but minimizing setup time permits frequent model changes. By managing the setup activity, it becomes practical to build products on demand, to achieve small WIP WIP Work In Progress
WIP Work in Process
WIP World Internet Project
WIP Women in Prison (movie genre)
WIP World Institute of Pain
WIP Wash-In-Place
WIP Women in Publishing
WIP Work In Place
WIP Wireless Internet Protocol
 inventories. This practice is also known as Heijunka, or production leveling Production leveling is key to reducing the Mura waste and to the development of production efficiency in the Toyota Production System and Lean Manufacturing. Ideally production can easily be leveled where demand is constant but in the real world where actual customer demand appears . Frequent model changes reduce WIP, as well as embedding 1. (mathematics) embedding - One instance of some mathematical object contained with in another instance, e.g. a group which is a subgroup.
2. (theory) embedding - (domain theory) A complete partial order F in [X -> Y] is an embedding if
 the ability to support quicker responses into the system. QRM focuses on the customer's specific needs and not on production for production's sake.

* Process analysis to identify NVA NVA Northern Virginia
NVA Nueva (Spanish: new)
NVA North Vietnamese Army
NVA Nationale Volksarmee (East German Military) 
 activities. The QRM environment mandates making decisions with accurate and current information. Time delays associated with manually collecting, formatting and distributing reports may result in decisions that hurt lead time. Real-time information supports real-time reactions and adjustments.

It is important to comprehend the commitments of the production system, the progress that the system is making and the system's capability to engage new tasks to meet customer demands. Up-to-date information provided by the system to support other business systems may include: unit completions, lot status, material consumption and attrition Attrition

The reduction in staff and employees in a company through normal means, such as retirement and resignation. This is natural in any business and industry.

Notes:
, and replenishment replenishment

the addition of an appropriate quantity of properly prepared solution containing the correct concentration of chemicals to the developer solutions used in radiography.
 notifications.

* User-targeted tools and technology. Technology, including IT integration, is intended to inform and empower users, wherever they may be or whatever they do. The capability to tailor information to users' needs, as well as provide the information where and when the user needs it, can save time and improve user effectiveness. User-customized report content and presentation can enhance performance. Real-time alerts and alarms can enhance responsiveness. Visibility wherever the user may be, including the factory floor, enables quick response. What should happen next becomes obvious for all participants within the manufacturing organization. QRM enables organizations to quickly meet customer demands by requiring constant evaluation and response.

Yet agile systems that support QRM are only a part of the solution. Leadership and change within each company will determine the effectiveness of the QRM initiative. A company driven to embrace rapid planning and execution as core principles will gain a competitive advantage.

Dough Johnson is software product manager at Siemens Logistics and Assembly Systems (logistics-assembly.siemens.com); douglasjohnson@siemens.com. Vern Harrison is software product manager; vern.harrison@siemens.com.
COPYRIGHT 2004 UP Media Group, Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2004, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Title Annotation:Process Control
Author:Harrison, Vern
Publication:Circuits Assembly
Date:Dec 1, 2004
Words:1120
Previous Article:News and resources for PCB industry professionals.(PCB Update: Special Advertising Section)(Advertisement)
Next Article:Programming for mixed-vendor lines: intelligent, centralized machine part data management cuts human error.(Parts Management)



Related Articles
AOI and Real-Time SPC for High-Mix/Low-Volume Lines -- The combination of AOI and closed loop, real-time feedback offers significant benefits to...
Wind River Introduces Industry-first Solution for Developing Multicore Embedded Designs; Lockheed Martin Uses WIND POWER ICE on Joint Strike Fighter...
Microchip Technology expands product offerings with cost-effective 14-pin flash Picmicro microcontroller.(Microchip Technology PIC16F630 and...
Microchip Tech simplifies motor-control design.(PIC18F2439/2539/4439/4539 microcontrollers)
Component rework: a small world and getting smaller: the difficulty faced when reworking very small parts can be overcome with new techniques and...
The flaws and obsolescence of product forecasting; one EMS provider has defined a new model that competes against low-cost, offshore suppliers by...
Accelerated Technology's Nucleus EDGE Next Generation Development Environment Ushers In New Era of Eclipse Platform Use.
New Xilinx MicroBlaze soft processor increases clock frequency by 25 percent.
Inovys Extends Customers Yield Management Capability with the Introduction of FlopPlot(TM) WaferView(TM).
How offline programming speeds NPI: new tools debug and verify at placement, before releasing product to the floor.(Software Enhancements)

Terms of use | Copyright © 2009 Farlex, Inc. | Feedback | For webmasters | Submit articles