EMS Forum releases RoHS compliant component guidelines: guidelines for suppliers transitioning to RoHS compliant components (Rev. 1.1).Background * This document is intended to provide guidelines to suppliers transitioning to lead-free/RoHS [Restriction of Hazardous Substances in Electrical and Electronic Equipment] compliance. * RoHS compliance includes materials compliance as well as the process and reliability requirements for lead-free soldering. Logistics * As per JESD JESD Jobs and Employment Services Department 46-B, all changes from existing parts to lead-free/RoHS compliance should be documented by a PCN 1. PCN - Program Composition Notation. 2. (communications) PCN - Personal Communication Network. [product change notification] issued by the manufacturer. Any component changes related to lead-free/RoHS compliance should be considered major changes. * Any product discontinuances of existing parts should be published to the customers as per the standard JESD48-A. * All manufacturers who provide notification that they will be producing lead-free/RoHS-compliant products should provide a product roadmap to their customers indicating the planned changes and implementation timetable. Availability and life cycle information for both current and lead-free/RoHS-compliant products should be specified. * Sample devices and qualification data should be available to customers prior to the release of the PCN or introduction of the new product. Compatibility & Testing * A qualification package for lead-free components should be provided that includes the following tests: 1. Handling, packing, shipping and use (per IPC (1) (InterProcess Communication) The exchange of data between one program and another either within the same computer or over a network. It implies a protocol that guarantees a response to a request. J-STD-033A) 2. Solderability testing (per IPC/EIA J-STD-002, current revision) a) Both no-clean and aqueous clean solder paste and wave solder flux should be included. 3. Solder joint reliability testing (per IPC-A-9701) 4. Mechanical shock and vibration (per AEC-Q100-Rev E/Mil-Std 883) 5. High temperature storage (per AEC-Q100-Rev E/JESD22-A103-A) 6. Tin whisker growth (Reference document: NEMI NEMI National Electronics Manufacturing Initiative NEMI National Environmental Methods Index Tin Whiskers Growth Tests, Rev. 4.5, until applicable industry standards become available) 7. Moisture sensitivity level Moisture Sensitivity Level relates to the packaging and handling precautions for some semiconductors. The MSL is an electronic standard for the time period in which a moisture sensitive device can be exposed to ambient room conditions (approximately 30°C/60%RH). (MSL See multiple single-level. ) testing a) Component MSL should not exceed the current levels. Wherever possible, testing should include old vs. new part comparisons. MSL testing should follow IPC/JEDEC J-STD-020 (current revision), with the exception that six heat cycles for area array packages and four heat cycles for other components should be included in preconditioning. (The six-heat cycle requirement reflects the maximum heat cycle an area array package can be expected to be exposed to, including: two reflows, wave soldering, component removal, reballing and reattachment reattachment, n in dentistry the reattachment of the gingival epithelium to the surface of the tooth. reattachment The reanastomosis of a thing detached. See Penile reattachment. ). * The qualification data should include: 1. Solder alloy(s) used 2. Termination metallurgy and thickness 3. Forward compatibility (ability to solder the components using lead-free solders and the appropriate higher temperature profiles) and backward compatibility (ability to solder the components using existing tin-lead solder and profiles), with the exception of area array packages with lead-free balls, which may not be backward compatible. (The incompatibilities of bismuth-containing termination with tin-lead solder, and bismuth- or lead-containing termination with lead-free solder for through-hole components for wave soldering, are also of particular concern.) 4. First-level interconnect compatibility a) It is the supplier's responsibility to ensure that the first-level interconnect (i.e. within the component package) is compatible with the second-level (i.e. board level) soldering processes (as defined by IPC/JEDEC J-STD-020, current revision). Part Identification * All components should have the outer packaging boxes and inner package material (tray, tube, reel) marked with some form of traceable information indicating that the components are lead-free/RoHS compliant. This marking should also appear on the component package where there is room for such a marking. * All lead-free/RoHS-compliant components should have new supplier P/Ns [part numbers] assigned. Suffix or prefix additions to existing P/N (Part/Number) Common shorthand for part number. structures are acceptable. * Device datasheets should clearly indicate the termination solder composition, maximum component temperature rating, recommended and absolute reflow (1) The process of heating and melting the solder that has been screen printed onto a printed circuit board in order to bond chips and other components to the board. Surface mount chips (SMT) use the reflow method. Contrast with wave soldering. See also reflowable text. profile limits, and the moisture sensitivity rating. If this information is not present on the datasheet, there should be a clear reference as to where it can be located. * We encourage industry associations and consortia to come up with globally accepted labels or marking for easy identification of lead-free/RoHS-compliant products. At this time, we endorse JEDEC The division of the Electronic Industries Alliance (EIA) that deals with semiconductor standards (officially, the JEDEC Solid State Technology Association of EIA). JEDEC was formed in 1958 when the Joint Electron Tube Engineering Council (JETEC) split into two Joint Electron Device JESD97: Marking, Symbols, and Labels for Identification of Lead (Pb) Free Assemblies, Components, and Devices (May 2004). Compliance * A master "Certificate of RoHS Compliance" should be generated and submitted, prior to any RoHS-compliant component shipment, to document verification methodology and results. * A "Certificate of RoHS Compliance" with lot-specific data should be submitted with every lot of shipment of RoHS-compliant components. * The certification should follow the guidelines of the "Material Composition Declaration Guide" by EIA (Electronic Industries Alliance, Arlington, VA, www.eia.org) A membership organization founded in 1924 as the Radio Manufacturing Association. It sets standards for consumer products and electronic components. , EICTA EICTA European Information & Communications Technology Industry Association EICTA European Information Communications and Consumer Electronics Industry Technology Association and JGPSSI, when finalized and released. "Level A" materials and substances (Annex A) are required for this certification; others are optional. EMSF EMSF Emergency Medical Services Fund EMSF External Maintenance and Servicing Facility Steering Committee Celestica: Matthew Kelly, Thilo Sack Flextronics: Dongkai Shangguan, Sammy Yi Jabil: Quyen Chu, Tom Cipielewski Plexus: Denis Jean, Kirk Van Dreel Sanmina-SCI: Frank Grano, Eamon O'Keeffe RELATED ARTICLE The EMS Forum on Lead-Free PCB PCB: see polychlorinated biphenyl. PCB in full polychlorinated biphenyl Any of a class of highly stable organic compounds prepared by the reaction of chlorine with biphenyl, a two-ring compound. Assembly provided Circuits Assembly with its recent publication: Guidelines for Suppliers Transitioning to RoHS Compliant Components (Rev. 1.1). To help the electronics industry prepare for the volume production of lead-free printed circuit board (PCB) assembly, the forum is comprised of five electronics manufacturing services Electronic manufacturing services (EMS) is term used for companies that design, test, manufacture, distribute and provide return/repair services for electronic component and assemblies for original equipment manufacturers (OEMs). (EMS) providers: Celestica, Flextronics, Jabil, Plexus Plexus - A modular World-Wide Web server written in Perl by Tony Sanders <sanders@earth.com>. Comes with interfaces to allow many other information services to be served via the Web. Version 3.0m 1994-07-22. and Sanmina-SCI. The mission of the EMSF is to discuss and address the issues that will affect the EMS industry as a whole as the transition is made to lead-free PCB assembly. The group will work with other industry consortia and standards organizations. For more information, contact Dr. Dongkai Shangguan, EMSF coordinator and director--advanced process technology, Flextronics, email: Dongkai.Shangguan@Flextronics.com. [ILLUSTRATION OMITTED] |
|
||||||||||||||

Printer friendly
Cite/link
Email
Feedback
Reader Opinion