Desert Sun Drilling Confirms Wide Area of Gold Mineralization at Morro do Vento.TORONTO Toronto (tərŏn`tō), city (1998 est pop. 2,400,000), provincial capital, S Ont., Canada, on Lake Ontario. Toronto is the largest city in Canada and since the 1970s has been one of the fastest-changing cities in North America, experiencing -- DESERT SUN MINING CORP. (TSX TSX Toronto Stock Exchange (TSE before April, 2002) TSX Transfer from Stack Pointer to Index TSX True Space Extension :DSM 1. DSM - Data Structure Manager. An object-oriented language by J.E. Rumbaugh and M.E. Loomis of GE, similar to C++. It is used in implementation of CAD/CAE software. DSM is written in DSM and C and produces C as output. ) has received additional drill results that further support the possibility of outlining a large mineral resource at the Morro Mor´ro n. 1. A round hill or point of land; hence, Please help Wikipedia by adding references. See the for details. This article has been tagged since September 2007. target area at the Jacobina Mines on the Bahia Bahia, state, Brazil Bahia (bäē`yə), state (1991 pop. 11,867,991), 216,612 sq mi (559,921 sq km), E Brazil, on the Atlantic Ocean. Salvador (also called Bahia) is the capital. Gold Belt in Brazil Brazil (brəzĭl`), Port. Brasil, officially Federative Republic of Brazil, republic (2005 est. pop. 186,113,000), 3,286,470 sq mi (8,511,965 sq km), E South America. . Morro do Vento is located about 1.5 km from the processing plant and existing mines, and approximately 9 km from the town of Jacobina. To date 80 holes totaling 13,700 m have been completed at Morro do Vento and results have been received for all of these holes. The target Intermediate reef package is consistently about 60-70m wide and extends along the full 2km strike length with extensive garimpos (free miners workings). Table 1 below summarizes new drilling results at Morro do Vento which are principally from holes in the central 900 metre metre In poetry, the rhythmic pattern of a poetic line. Various principles have been devised to organize poetic lines into rhythmic units. Quantitative verse, the metre of Classical Greek and Latin poetry, measures the length of time required to pronounce syllables, long core of the target zone (see Figure 1). Highlights include: - MVT-335 which intersected 1.01 grams gold per tonne tonne measure of weight or mass; 1 tonne=1000 kg. See also ton. (g Au/t) over a true width of 54.3m including a higher grade intersection intersection /in·ter·sec·tion/ (-sek´shun) a site at which one structure crosses another. intersection a site at which one structure crosses another. of 2.65 g Au/t over a true width of 8.6m; - MVT-353 which intersected 0.93 g Au/t over a true width of 80.5m including a higher grade intersection of 2.04 g Au/t over 11.0m true width; and - MVT-346 which returned 0.88 g Au/t over a true width of 65.9m including 2.93 g Au/t over a true width of 10.2m; - MVT-357 which intersected 0.81 g Au/t over a true width of 46.7m including 1.67 g Au/t over 10.4m true width Dr. Bill Pearson Pear·son , Lester Bowles 1897-1972. Canadian politician who served as prime minister (1963-1968). He won the 1957 Nobel Peace Prize for his role in the negotiation of a solution to the Suez crisis (1956). , P.Geo. stated: "These results continue to confirm the wide extent of gold mineralization Mineralization The process by which the body uses minerals to build bone structure. Mentioned in: Rickets mineralization, n the bioprecipitation of an inorganic substance. in the Morro do Vento zone. Detailed drilling has also provided much better definition of higher grade shoots within the broad lower grade zone. Work has begun on estimating a new mineral resource which will form the basis for a preliminary evaluation study by SRK SRK Shah Rukh Khan (Indian actor) SRK Shoryuken (fighting games) SRK Soave-Redlich-Kwong (thermodynamic model) SRK Syk-Related Tyrosine Kinase Consulting." Morro do Vento Preliminary Evaluation Study Commences Desert Sun has retained SRK Consulting to complete a preliminary evaluation study of the Morro do Vento target zone. This study will examine both open pittable and bulk underground mining possibilities with processing by conventional and heap leach leach v. leached, leach·ing, leach·es v.tr. 1. To remove soluble or other constituents from by the action of a percolating liquid. 2. methods. Mr. Ken Reipas, P.Eng P.Eng Professional Engineer . will be the project manager for SRK. The resource model is currently being updated and a mineral resource estimate incorporating all new drill data will be completed by John Reddick Reddick is the name of several places in the United States:
n. 1. The science that deals with procedures used in extracting metals from their ores, purifying and alloying metals, and creating useful objects from metals. 2. testing to assess the heap leach potential will be carried out at CETEM, an independent metallurgical laboratory The Metallurgical Laboratory or "Met Lab" at the University of Chicago was part of the World War II–era Manhattan Project, created by the United States to develop an atomic bomb. in Rio de Janeiro Rio de Janeiro, city, Brazil Rio de Janeiro (rē`ō də zhänā`rō, Port. rē` thĭ zhənĕē`r , Brazil under the
supervision of Bruce Ferguson Air Marshal Bruce Reid Ferguson (DCNZM; OBE; AFC) is the Director of Government Communications Security Bureau. He took up the appointment when the previous director Dr. Warren Tucker, took up his new role as Director of Security Intelligence Service on November 1, 2006, Mr. , P.Eng., consulting metallurgist with
Kappes, Cassiday. As previously reported (see press release July 27,
2004), positive metallurgical tests were obtained for conventional
processing by SGS SGS Société Générale de SurveillanceSGS Symantec Gateway Security (appliance) SGS School of Graduate Studies SGS Subgrid Scale SGS Singapore Government Securities SGS Shell Global Solutions Lakefield of Lakefield, Ontario Lakefield (population 2400) is a village which is a part of the township of Smith-Ennismore-Lakefield, and Peterborough County, Ontario, although it was formerly a separate village. The Trent-Severn Waterway passes on the west. , Canada. It is expected that the study will be completed by the end of this year. Assaying for the program was carried out by Lakefield Geosol, an ISO (1) See ISO speed. (2) (International Organization for Standardization, Geneva, Switzerland, www.iso.ch) An organization that sets international standards, founded in 1946. The U.S. member body is ANSI. 9001, 2000 laboratory based in Brazil, using fire assay on 50 gram pulps. Check assaying is routinely carried out, by ALS Als (äls), Ger. Alsen, island, 121 sq mi (313 sq km), Sønderjylland co., S Denmark, in the Lille Bælt, separated from the mainland by the narrow Alensund. Chemex in Vancouver, on 10% of sample pulps and 5% of sample rejects. Independent standard reference samples are also inserted at regular intervals into each batch of analyses. Security is maintained at the core logging and sampling facility. Dr. Bill Pearson, P.Geo. is the Qualified Person as defined under National Instrument 43-101 responsible for the scientific and technical work on the program. Statements in this release that are not historical facts are "forward-looking statements forward-looking statement A projected financial statement based on management expectations. A forward-looking statement involves risks with regard to the accuracy of assumptions underlying the projections. " within the meaning of the U.S. Private Securities Litigation Reform Act The Private Securities Litigation Reform Act of 1995 (PSLRA) implemented several significant substantive changes affecting certain cases brought under the federal securities laws, including changes related to pleading, discovery, liability, class representation and awards fees and of 1995. Readers are cautioned that any such statements are not guarantees of future performance and that actual developments or results may vary materially from those in these "forward-looking statements". Desert Sun Mining is a Canadian Canadian (kənā`dēən), river, 906 mi (1,458 km) long, rising in NE New Mexico. and flowing E across N Texas and central Oklahoma into the Arkansas River in E Oklahoma. gold exploration and development company listed on the Toronto Stock Exchange Toronto Stock Exchange (TSE) Canada's largest stock exchange, trading approximately 1,200 company stocks and 33 options. and the American Stock Exchange American Stock Exchange (AMEX) Stock exchange in the U.S. Originally known as “the Curb,” it began as an outdoor marketplace in New York City c. 1850. It moved indoors to its present location in the Wall Street area in 1921. . (www.desertsunmining.com).
Table 1: Significant Drilling Results, Morro do Vento
-------------------------------------------------------------------
Hole No.(i) From (m) To (m) Gold Interval True Depth
(g/t) (m) Width Below
(m) Surface
(i)(i)(m)
-------------------------------------------------------------------
MORRO DO VENTO (DETAILED DRILLING AREA)
MVT 335 N8753634 E334709 El 970
dip -82degrees 35.23 122.85 1.01 87.62 54.3 78
incl. 35.23 38.63 2.17 3.40 2.1 40
incl. 50.72 60.86 1.58 10.14 6.3 55
incl. 83.43 97.27 2.65 13.84 8.6 92
incl. 115.22 122.85 2.17 7.63 4.7 118
MVT 341 N 8753489 E 334750 El 989
dip -71degrees 353.76 359.80 2.65 6.04 6.0 230
incl. 356.54 359.80 4.01 3.26 3.3 244
MVT 346 N 8753585 E 334742 El 966
dip -88degrees 74.60 173.03 0.88 98.43 65.9 130
incl. 74.60 77.89 4.12 3.29 2.2 80
incl. 114.62 129.80 2.93 15.18 10.2 125
incl. 168.01 173.03 2.05 5.02 3.4 175
MVT 349 N8753687 E334680 El 980
dip -40degrees 3.00 83.14 0.61 80.14 78.5 38
incl. 37.93 46.32 2.10 8.39 8.2 38
incl. 81.19 83.14 3.00 1.95 1.9 70
MVT 350 N8753935 E334663 El 990
dip -40degrees 50.14 56.00 0.65 5.86 5.9 35
incl. 81.00 82.83 2.19 1.83 1.8 45
MVT351 N8753937 E334663 El 991
dip -62degrees 33.29 111.00 0.63 77.71 67.6 73
incl. 55.18 73.63 1.08 18.45 16.1 64
incl. 100.47 111.00 1.52 10.53 9.2 102
MVT 352 N 8753509 E 334.750 El 987
dip -89degrees 102.20 105.39 1.62 3.19 1.6 100
-------------------------------------------------------------------
(i) all holes are NQ diamond drill core size and have been drilled
+ or - perpendicular to the north-south strike of the zones.
(i)(i) depth calculated based on midpoint of intersection
Table 1: Significant Drilling Results, Morro do Vento (con't)
-------------------------------------------------------------------
Hole No.(i) From (m) To (m) Gold Interval True Depth
(g/t) (m) Width Below
(m) Surface
(i)(i)(m)
-------------------------------------------------------------------
MORRO DO VENTO (DETAILED DRILLING AREA)
MVT353 N8753889 E334669 El 992
dip -86degrees 63.50 246.43 0.93 182.93 80.5 100
incl. 81.00 89.12 2.06 8.12 3.6 57
incl. 128.11 153.00 2.04 24.89 11.0 94
incl. 219.55 246.43 1.97 26.88 11.8 138
MVT 354 N8753939 E334666 El 993
dip -72degrees 46.70 237.00 0.50 190.30 68.5 104
incl. 86.17 94.91 1.75 8.74 3.1 70
incl. 148.40 177.66 1.07 29.26 10.5 118
incl. 220.21 237.00 1.01 16.79 6.0 165
MVT 355 N8754082 E 334622 El 1004
dip -72degrees 16.86 205.24 0.69 188.38 67.8 95
incl. 147.26 156.43 1.83 9.17 3.3 125
incl. 193.92 205.24 4.36 11.32 4.1 164
MVT 356 N8754142 E334615 El 997
dip -87 degrees 13.65 96.95 0.71 83.30 56.6 54
incl. 13.65 20.50 0.99 6.85 4.7 18
incl. 50.50 52.96 1.46 2.46 1.7 50
incl. 84.51 96.95 3.23 12.44 8.5 88
MVT 357 N8753968 E334647 El 997
dip -70degrees 42.55 222.34 0.81 179.79 46.7 105
incl. 116.37 156.30 1.67 39.93 10.4 106
incl. 201.70 208.46 2.51 6.76 1.8 158
MVT 358 N8753 995 E334689 El 978
dip -75 degrees 72.62 232.87 0.60 160.25 67.3 118
MVT 359 N 8754138 E334674 El 967
dip -73 degrees 66.84 217.90 0.53 151.06 46.8 110
incl. 66.84 75.29 1.46 8.45 2.6 57
incl. 91.44 96.30 1.74 4.86 1.5 75
incl. 160.03 174.10 2.57 14.07 4.4 132
incl. 165.58 174.10 3.88 8.52 2.6 132
-------------------------------------------------------------------
(i) all holes are NQ diamond drill core size and have been drilled
perpendicular to the north-south strike of the zones.
(i)(i) depth calculated based on midpoint of intersection
Table 1: Significant Drilling Results, Morro do Vento (con't)
-------------------------------------------------------------------
Hole No.(i) From (m) To (m) Gold Interval True Depth
(g/t) (m) Width Below
(m) Surface
(i)(i)(m)
-------------------------------------------------------------------
MORRO DO VENTO (DETAILED DRILLING AREA)
MVT 360 N 8754299 E 334.665 El 944
dip -50degrees 45.94 47.06 1.31 1.12 1.0 51
Faulted
MVT 361 N8754257 E 334664 El 951
dip -73degrees 3.65 91.22 0.51 87.57 69.2 50
incl. 3.65 6.77 1.04 3.12 2.5 5
incl. 15.63 21.57 1.29 5.94 4.7 19
incl. 85.29 91.22 2.76 5.93 4.7 94
MVT 362 N 8754054 E334631 El 1000
dip -43degrees 13.89 17.12 1.30 3.23 3.2 12
incl. 33.51 35.86 0.56 2.35 2.3 26
incl. 63.27 70.79 0.59 7.52 7.4 47
MVT363 N 8754120 E334735 El 923
dip
-48degrees35' 44.76 114.79 0.76 70.03 67.9 97
incl. 44.76 48.00 1.39 3.24 3.1 60
incl. 87.31 94.49 2.74 7.18 7.0 110
incl. 110.57 114.79 3.46 4.22 4.1 137
MVT364 N 8754137 E334673 El 968
dip -80degrees 34.06 132.39 0.57 98.33 69.8 93
incl. 34.06 40.65 1.89 6.59 4.7 45
incl. 49.81 52.71 2.93 2.90 2.1 58
incl. 95.95 100.48 1.83 4.53 3.2 106
incl. 128.85 132.39 2.52 3.54 2.5 140
MVT 365 N 8754100 E334638 El 997
dip -87degrees 26.15 141.16 0.42 115.01 67.9 83
incl. 36.34 40.20 1.04 3.86 2.3 39
incl. 87.79 93.06 2.02 5.27 3.1 90
incl. 135.97 141.16 2.99 5.19 3.1 135
MVT 366 N 8754330 E334700 El 932
dip -81degrees 84.76 92.05 3.24 7.29 5.0 95
incl. 82.41 92.05 2.52 9.64 6.7 92
-------------------------------------------------------------------
(i) all holes are NQ diamond drill core size and have been drilled
perpendicular to the north-south strike of the zones.
(i)(i) depth calculated based on midpoint of intersection
Table 1: Significant Drilling Results, Morro do Vento (con't)
-------------------------------------------------------------------
Hole No.(i) From (m) To (m) Gold Interval True Depth
(g/t) (m) Width Below
(m) Surface
(i)(i)(m)
-------------------------------------------------------------------
MVT367 N 8754010 E 334675 El 988
dip -77degrees 36.16 135.76 0.58 99.60 73.7 95
incl. 50.90 54.38 1.87 3.48 2.6 60
incl. 83.57 90.73 2.38 7.16 5.3 96
incl. 129.39 135.76 1.70 6.37 4.7 140
MVT368 N 8754240 E 334663 El 955
dip -76degrees 6.45 95.27 0.43 88.82 68.4 53
incl. 18.30 25.10 0.64 6.80 5.2 24
incl. 59.26 63.44 0.79 4.18 3.2 65
incl. 89.24 95.27 2.84 6.03 4.6 98
MVT 369 N 8754409 E 334677 El 938
dip -43degrees 27.03 29.34 3.37 2.31 2.3 27
incl. 24.66 29.34 1.93 4.68 4.6 27
MVT370 N 8754385 E334711 El 923
dip -83degrees 76.96 83.03 0.90 6.07 3.3 75
MORRO DO VENTO (NORTHERN END OF TARGET AREA)
MVT 326 N 8754690 E334900 El 672
dip +8degrees No significant values
MVT 327 N 8754818 E 334859 El 671
dip +23degrees 51.09 52.03 4.82 0.94 0.4 25
incl. 51.09 58.85 1.02 7.76 3.5 27
MVT 328 N 8754768 E 334879 El 662
dip +18degrees 45.55 47.65 1.63 2.1 1.1 33
-------------------------------------------------------------------
(i) all holes are NQ diamond drill core size and have been drilled
+ or - perpendicular to the north-south strike of the zones.
(i)(i) depth calculated based on midpoint of intersection
If you would like to see a map of the detailed drilling area please click on the link below: http://www2.cdn-news.com/database/fax/2000/dsm0929.gif Desert Sun Mining Corp. (TSX:DSM) |
|
||||||||||||||||

thĭ zhənĕē`r
Printer friendly
Cite/link
Email
Feedback
Reader Opinion