Defense Logistics: GAO's Observations on Maintenance Aspects of the Navy's Fleet Response Plan.


GAO-04-724R June 18, 2004

The terrorist attacks of September 11, 2001, and Operation Iraqi Freedom have prompted major changes in the employment of naval forces around the globe. These two events resulted in an ultimate surging to deploy seven carrier strike groups and the largest amphibious task force A Navy task organization formed to conduct amphibious operations. The amphibious task force, together with the landing force and other forces, constitutes the amphibious force. Also called ATF. See also amphibious force; amphibious operation; landing force.  assembled in decades. According to according to
prep.
1. As stated or indicated by; on the authority of: according to historians.

2. In keeping with: according to instructions.

3.
 the Navy, at the time of the September 11 attacks September 11 attacks

Series of airline hijackings and suicide bombings against U.S. targets perpetrated by 19 militants associated with the Islamic extremist group al-Qaeda.
 and in preparation for Operation Iraqi Freedom, only a small number of ships at peak readiness were forward deployed. However, most of the Navy's ships were not available for use because they were in early stages of their training cycles. This prompted the Navy, in March 2003, to develop a concept to enhance its deployment readiness strategy. The Navy's Fleet Response Plan, implemented in May 2003, evolved from a concept to institutionalize in·sti·tu·tion·a·lize
v.
To place a person in the care of an institution, especially one providing care for the disabled or mentally ill.



in
 an enhanced surge capability. Because of potential budget implications, Congress asked us to review the assumption that the Navy's implementation of its Fleet Response Plan would reduce the duration of aircraft carrier depot maintenance That maintenance performed on materiel requiring major overhaul or a complete rebuild of parts, assemblies, subassemblies, and end-items, including the manufacture of parts, modifications, testing, and reclamation as required.  intervals between deployment periods from approximately 18 months to 9 months. Specifically, our objectives were to identify the likely impacts and risks for the Navy's logistics requirements that could result from shortened maintenance cycles between deployments; the Navy's plan for fulfilling major repair and maintenance requirements; upgrading and modernizing weapons, communications, and engineering systems; and performing nuclear refueling in the shortened maintenance cycle; and how the Navy's budget supports its plan to shorten maintenance cycles.

The Navy's Fleet Response Plan does not shorten preexisting time frames for performing aircraft carrier maintenance. Furthermore, it does not alter existing major repair and maintenance requirements; methods of upgrading and modernizing weapons, communications, and engineering systems; or methods of performing nuclear refueling. At this time, the potential impact of the plan on the Navy's budget is uncertain. The implementation of the Navy's Fleet Response Plan does not alter existing repair and maintenance requirements; methods for upgrading and modernizing weapons, communications, and engineering systems; or methods for performing nuclear refueling. These aspects of Navy ship maintenance requirements will continue to be conducted in accordance with Chief of Naval Operations guidance for naval ships. However, Chief of Naval Operations and Naval Sea Systems Command The Naval Sea Systems Command (NAVSEA) is the largest of the U.S. Navy's five "systems commands," or materiel organizations. NAVSEA consists of four shipyards, eight "warfare centers" (two undersea and six surface), four major shipbuilding locations and the NAVSEA headquarters,  officials informed us that under the Fleet Response Plan, the Navy intends to provide needed depot maintenance--called continuous maintenance--more frequently during scheduled, shorter-duration pier dockings, instead of deferring this maintenance until the normal 6-month maintenance period arrives. Intensification of the preexisting continuous maintenance process constitutes the essential core of the Fleet Response Plan's maintenance component. Navy officials stated that additional carrier operational availability is being achieved through intensified continuous depot-level maintenance. There are no present indications that the implementation of the plan will affect the Navy's budget. Navy and Office of the Secretary Defense budget officials stated that the plan was relatively new and they were unaware of any specific budgetary implications at this time.
COPYRIGHT 2004 Stonehenge International
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2004 Gale, Cengage Learning. All rights reserved.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:General Accounting Office Reports & Testimony
Date:Aug 1, 2004
Words:482
Previous Article:Homeland Security: Performance of Information System to Monitor Foreign Students and Exchange Visitors Has Improved, but Issues Remain.
Next Article:Superlative Technologies, Inc.



Related Articles
Bookshelf Ideas.
Defense Inventory: Navy Logistics Strategy and Initiatives Need to Address Spare Parts Shortages.
Supporting special operations forces. (Inside logistics: exploring the heart of logistics).
Force Structure: Department of the Navy's Tactical Aviation Integration Plan Is Reasonable, but Some Factors Could Affect Implementation.
Department of Defense news release (March 18, 2005): GAO reports.
General Accounting Office (GAO) reports, studies, testimony.
Military Readiness: Navy's Fleet Response Plan Would Benefit from a Comprehensive Management Approach and Rigorous Testing.
Defense Acquisitions: Overcoming Challenges Key to Capitalizing on Mine Countermeasures Capabilities.
Military Readiness: Navy Is Making Progress Implementing Its Fleet Response Plan, but Has Not Fully Developed Goals, Measures, and Resource Needs.
DLA Cherry Point activates.

Terms of use | Copyright © 2012 Farlex, Inc. | Feedback | For webmasters | Submit articles