Cusac Gold Announces Exploration at Table Mountain and Taurus Projects Increases Gold Potential.VANCOUVER, British Columbia--(BUSINESS WIRE)--Sept. 29, 1999-- William H. Bird, President of Cusac Gold Mines Ltd., (TSE See Tokyo Stock Exchange. TSE 1. See Tokyo Stock Exchange (TSE). 2. See Toronto Stock Exchange (TSE). :CQC CQC China Quality Certification Center CQC Caiga Quien Caiga (Argentinean TV show) CQC Close Quarters Combat (gaming league) CQC Close Quarters Combat (hand to hand) .) (OTC OTC See: Over-the-counter. OTC See over-the-counter market (OTC). BB:CUSIF) announces the results of 1999 exploration on the company's 272-square-kilometre property in northern British Columbia British Columbia, province (2001 pop. 3,907,738), 366,255 sq mi (948,600 sq km), including 6,976 sq mi (18,068 sq km) of water surface, W Canada. Geography . Exploration at Cusac's Taurus Project surface gold deposit was carried out east of the 88 Hill zone, which contains a drill-indicated resource of over 12.3 million grams of gold, in an attempt to define high-grade structures that could increase the overall gold potential of the project. Surface trenches uncovered two structures, which extended for 50 metres and contained quartz quartz, one of the commonest of all rock-forming minerals and one of the most important constituents of the earth's crust. Chemically, it is silicon dioxide, SiO2. veins and veinlets. Seventy-six samples were collected across the structures and assayed at Acme (company, jargon) ACME - /ak'mee/ 1. A Company that Makes Everything. The canonical imaginary business. Possibly also derived from the word "acme" meaning "highest point". 2. A program for MS-DOS. Analytical analytical, analytic pertaining to or emanating from analysis. analytical control control of confounding by analysis of the results of a trial or test. Laboratories Ltd. in Vancouver, BC. Sixty-eight samples ranged in value from 0.01 to 7.09 grams of gold per tonne tonne measure of weight or mass; 1 tonne=1000 kg. See also ton. . Eight of the samples returned much higher grades of from 10.72 to 71.12 grams of gold per tonne. If the high-grade values are cut to a level equal to that of the upper end of the general sample population range (7.09 grams of gold per tonne), the overall average of sample values is 2.48 grams of gold per tonne. This is more than twice the 1.08-gram-per-tonne average of the 88 Hill zone resource and three times the 0.80-gram-per-tonne average of the 50 million-gram gold mineral inventory of the entire Taurus Project. The summer's work at the Taurus Project also included the deconstruction deconstruction, in linguistics, philosophy, and literary theory, the exposure and undermining of the metaphysical assumptions involved in systematic attempts to ground knowledge, especially in academic disciplines such as structuralism and semiotics. of the old Taurus mill and the clean-up of the mill site. As part of the agreement for Cusac's acquisition of up to a 70-percent interest in those Taurus Project claims owned by International Taurus Resources Inc., Cusac made a commitment to manage the mill deconstruction and clean-up. With the completion of this commitment, Cusac will be deemed to have contributed $50,000 toward the first $300,000 of exploration work required to maintain its position in the Taurus Project joint venture. At Table Mountain, shipments produced from the exploration and surface mining of the recently discovered East Bear vein have totaled approximately 21,700 grams of gold. The discovery and mining of the East Bear marks the first time that gold, similar in style to that of the traditional high-grade veins of the Table Mountain mines, has been produced from a vein east of the main Erickson Creek fault zone. The discovery significantly increases the potential for finding new high-grade veins on the property. The East Bear ore was processed at Cusac's Table Mountain mill and the concentrates were shipped to Engelhard Canada Ltd. and Cominco Ltd. Work continues on the rest of the property to maintain mining and milling capabilities for future production. Cusac Gold Mines Ltd. is also evaluating additional projects to expand its portfolio of mining and exploration properties. The management believes that a wider range of projects will add shareholder value and increase the company's ability to finance its activities. William H. Bird, President |
|
||||||||||||||||

Printer friendly
Cite/link
Email
Feedback
Reader Opinion