Printer Friendly
The Free Library
19,607,053 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

Cross Lake Minerals: Second Phase of 1998 Drilling to Resume on Sheraton-Timmins Project.


VANCOUVER, British Columbia--(BUSINESS WIRE)--April 22, 1998-- CROSS LAKE MIN Min (mĭn).

1 Chief river of Fujian prov., SE China, c.350 mi (560 km) long, rising in Wuyi shan and flowing SE to the South China Sea near Fuzhou; it receives several tributaries near Nanping.
.(VSE See DOS/VSE.

VSE - Virtual Storage Extended
:CRN CRN Computer Reseller News
CRN Crown
CRN Council for Responsible Nutrition
CRN Crane
CRN Community Recycling Network
CRN Course Reference Number
CRN Center for Responsible Nanotechnology
CRN Cornish (SIL code, UK) 
.) CROSS LAKE MINERALS LTD LTD 1 Laron-type dwarfism 2 Leukotriene D 3 Long-term depression, see there 4. Long-term disability . (the "Company") advises that, having completed a compilation and in- depth review of geophysical, geological and drilling data, the Company has scheduled the second phase of 1998 drilling on its 100 percent owned Sheraton-Timmins Project to commence on May 1, 1998. The program will initially test conductive down hole pulse electromagnetic (EM) targets.

The Company has utilized several different methods of geophysics to better define the mineralized min·er·al·ize  
v. min·er·al·ized, min·er·al·iz·ing, min·er·al·iz·es

v.tr.
1. To convert to a mineral substance; petrify.

2. To transform a metal into a mineral by oxidation.

3.
 systems. Pulse EM surveys identified the conductive (possible copper mineralization Mineralization
The process by which the body uses minerals to build bone structure.

Mentioned in: Rickets

mineralization,
n the bioprecipitation of an inorganic substance.
) targets to be tested in the upcoming drill program. Mise-a-la-Masse surveys have indicated that the mineralized zone extends to the northeast and appears to confirm the continuity of mineralization within the copper zone. Surface induced polarization (IP) and magnetic surveys were carried out which identified more new targets and extended the Cross Lake zone further to the southwest and northeast. Old government airborne INPUT EM data was re- interpreted which, in addition to confirming the Cross Lake zone anomaly, identified several untested EM and magnetic anomalies which provide attractive drill targets. An airborne EM and magnetic survey was also completed over the southern, previously unflown, portion of the property in Timmins Township. A report on this survey is pending.

The hiatus in drilling has allowed the Company's technical team the opportunity to carry out geophysical work, compile data from previous drill programs, and analyse results in order to further understand the VMS (1) (Virtual Memory System) A multiuser, multitasking, virtual memory operating system for the VAX series from Digital. VMS applications run on any VAX from the MicroVAX to the largest unit. See OpenVMS.  system and plan subsequent drill programs.

ON BEHALF OF THE BOARD OF DIRECTORS CROSS LAKE MINERALS LTD. Henry G. Ewanchuk, Chairman and C.E.O.

CONTACT: Cross Lake Minerals Ltd.

Erik Andersen, 604/688-5448

or

Cross Lake Minerals Ltd.

Michele Jones, 604/688-5448

Web site: http://www.crosslakeminerals.com
COPYRIGHT 1998 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 1998, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Date:Apr 22, 1998
Words:295
Previous Article:Milltronics Ltd. Announces First Quarter 1998 Financial Results.
Next Article:ADFlex Announces First-Quarter 1998 Results.
Topics:



Related Articles
Mining industry pools exploration ideas.
Exploration heats up in Timmins area: Projections for economic recovery, increased investment in exploration indicative of prosperous times,...
Discover Abitibi project back on track: Geophysical airborne survey results expected by year's end. (Timmins: Special Report).
Service sector confidence rising as project moves forward. (Timmins: Special Report).
Timmins mining camp a "fortress".
Hydro project has power to create 250 jobs.
Prospecting outside the box.
Results prompt Lake Shore to spend $7M on drilling.
Top junior mining companies.
5 Lake Shore Gold project advances underground.

Terms of use | Copyright © 2012 Farlex, Inc. | Feedback | For webmasters | Submit articles