Printer Friendly

Browse Cooling systems topic

 

Articles

1-300 out of 500 article(s) nextnext page
Title Author Type Date Words
The Cryos Wine Chiller is the world's first and only instant wine chiller. Feb 2, 2016 540
The Cryos Wine Chiller is the World's First and Only Instant Wine Chiller. Feb 2, 2016 556
Chiller replacement. Jan 30, 2016 103
Restore the exhaust fan drive systems. Jan 30, 2016 469
Providing and fitting of Refrigeration Air Dryers with filtration system of Capacity 100 CFM. Jan 29, 2016 150
Cooling Tower And Closed Loop System Water Treatment And Maintenance. Jan 29, 2016 352
New Refrigeration Condenser and Evaporator System for Western Reception, Diagnostic and Correctional Center. Jan 29, 2016 150
TTPS Operation Circle - MPM II ACP Stage I, II & III Cleaning of filters, cooling coils, condensers, cooling towers and greasing. Jan 28, 2016 138
TTPS Operation Circle MPM II ACP Attending Emergency works in condenser, chiller pumps, CW Pumps, CW pipe lines, cleaning of AC plan. Jan 28, 2016 166
Service ventilation- heat exchangers and cooling systems. Jan 28, 2016 148
This project consists of minor piping demolition, pep filter recommissioning and pump addition associated with existing cooling tower. existing solar thermal collector racks to be pressure tested and. Jan 28, 2016 102
Chiller replacement. Jan 28, 2016 105
Reconstruction And Replacement Of Cooling Towers In Groups A) Hrt Center Rijeka B) Hrt Center Split. Jan 28, 2016 116
Replacement of damaged unserviceable chiller unit in AC plant at Dr BSA Hospital, Rohini, Delhi. Jan 28, 2016 126
Lubricating Oil Poe-46 For Kirloskar Chiller Model-Peh-100. Jan 27, 2016 155
Rmo 3x110 tr capacity air conditioning plant installed for bsf, bprd, dcpw, dfs at cgo complex, lodhi road, new delhi. sh- replacement of cooling towers and other accessories. Jan 27, 2016 126
Supply of cryogenic liquid level measurement system. Jan 27, 2016 166
Supply of flexible hose pipes with tube stub end connection to be used in the cooling system of accelerator conforming to technical specification no.Tsp/2015/hts/01 required at barc, trombay, mumbai,. Jan 27, 2016 149
Providing, supplying, Installing and commissioning of Chiller equipment to Institution of Excellence, University of Mysore, Vijnana Bhavana, Manasagangotri, Mysore-570 006. Jan 27, 2016 122
Supply of ct fan blades complete assembly for cooling tower st-2. Jan 27, 2016 115
The right to enter into an agreement for the replacement of industrial air conditioning, 3rd floor, building b (for the purchase, installation, engineering networks and equipment for air conditioning. Jan 27, 2016 189
The right to sign the contract for delivery of the lot number 8865/536 blr1-16 supply of air conditioning and split systems for building the belarusian nuclear power unit ?1. Jan 27, 2016 168
Chiller replacement & cooling towers. Jan 27, 2016 111
Provide professional repair and maintenance services, parts oil, refrigerant and labor to keep the cooling tower and chiller system in optimum operating condition. Jan 27, 2016 111
Renovation, modification and alteration incl. air conditioning system. Jan 25, 2016 151
Estimate no. 993/cnd/2014-15 providing air cooling system in bachat safalya hall bachat bhavan in district collector office premises at chandrapur, district chandrapur. Jan 25, 2016 147
Servicing of cooling towers. Jan 25, 2016 124
Removal And Disposal Of Coal /Ash/Muck And Debris From Cooling Tower. Jan 25, 2016 179
Replacement Of Cooling Towers And Other Accessories. Jan 25, 2016 120
Installation of FRP area lighting poles in place of GI poles in RUP South and North Block Cooling Tower at Gujarat Refinery. Jan 25, 2016 143
Electrical Installation including Air Conditioning and Fire Alarm System at proposed CTVS OT & Intensive Care Unit at top floor of DHB building under Kolkata Medical College &Hospital, KolkataS & ins. Jan 24, 2016 110
Provision of Cooling towers. Jan 23, 2016 331
Housing bearing radiator fan drive, e.R. drg. no - 11250227. Jan 23, 2016 341
Repair/Maint To Ahu, Cooling Tower, Ducting And Overhauling Of Compressor In Central Ac Plant Under Ge Gomantak Vasco. Jan 23, 2016 135
G.I angles and channels for support of cable trays for st-i cooling towers. Jan 23, 2016 125
Demolition, purchasing, installation, start-up and commissioning for the proposed work on the service water filtration, copper-silver ionization system and the pobs dry, free cooling chiller. the exis. Jan 23, 2016 119
UKSBSRE150616 Cryogenic System ESS WP3. Jan 22, 2016 213
R.M.O. 4 x 500 tr capacity a.C. plant of bhasha bhawan at national library complex, kolkata-700 027 sh: replacement of wornout / damaged 10 dia and 8 dia m.S. pipe, m.S. beam etc. for cooling tower no. Jan 22, 2016 147
R.M.O. 4 x 500 tr capacity a.C. plant of bhasha bhawan at national library complex, kolkata-700 027 sh: replacement of wornout / damaged m.S. base, 10 dia butterfly valve etc. for cooling tower no. 2. Jan 22, 2016 143
providing repair to chiller plant of dr. vasantrao deshpande sabhagruha at nagpur. Jan 22, 2016 124
To provide rotary evaporator with chiller and vacuum pump in rajaram college, kolhapur. Jan 22, 2016 121
United States : North American Data Centers Save Over 1 Billion Gallons of Water Using Emerson Network Power Cooling System. Jan 22, 2016 435
Resurrecting Construction Activities and Demand for Energy-efficient Systems to Drive U.S Commercial Air Conditioning Systems Market: Transparency Market Research. Jan 21, 2016 1041
Resurrecting Construction Activities and Demand for Energy-efficient Systems to Drive U.S Commercial Air Conditioning Systems Market: Transparency Market Research. Jan 21, 2016 1047
Johnson Controls sets a new standard in chiller technology, expands successful magnetic-bearing chiller offering. Jan 21, 2016 857
Replacement Of Wornout / Damaged 10 Dia And 8 Dia M.S. Pipe, M.S. Beam For Cooling Tower No. 2. Jan 21, 2016 101
Certain essential repair to air ducts, cooling tower, vfd motors, ventilation system, kawatch and dakin fcus, air quality survey and provn of deficient facilities in central ac plant and manekshaw cen. Jan 21, 2016 167
Supply of recirculation chiller with inbuild pumping system. Jan 21, 2016 167
Supply replacement and testing the water pipeline of the cooling towers installed for chilling plan. Jan 21, 2016 131
Supply of various motorized gate valves for cooling system of the 6x115 mw generating units in view of scada compatibility in salal power station. Jan 21, 2016 142
Ball bearing (fan drive shaft bearing arrangement),dmw pt.No.:11400055. Jan 21, 2016 184
Replacement Of Compressor Motor Bearings, Servicing Of Y Strainer Of Condenser, Chiller Line, Audco Valve Of Boiler And Overhauling Of Chiller And Condenser Pump. Jan 20, 2016 105
Hclas15304 refurbishment of 01 (one) no. Cell of tps cooling tower and 02 (two) nos. Cells of process cooling tower at haldia refinery. Jan 20, 2016 145
Renewal of condensor and chiller pumpset of ac plant at mch vandanam alappuzha. Jan 20, 2016 121
Spares for chiller of m/s kirloskar mcquay make. Jan 20, 2016 114
Shifting of m.s. pipes of various sizes of ash handling plant of 2x250 mw extn. from a- power house to area between cooling tower of unit no. 8 & 9, 2x250mw extn. htps. Jan 20, 2016 133
Installation work of cooling equipment. Jan 20, 2016 220
Newly Redesigned Frigidaire Gallery Cool Connect(TM) Room Air Conditioner Gets Sleek Makeover. Jan 19, 2016 671
Provision of maintenance and repair equipment air conditioning. Jan 19, 2016 101
Maintenance equipment for quarterly prventivo split air conditioning various services as detailed herein, p.5401 / 15. Jan 19, 2016 112
Provision of equipment maintenance service air conditioning. Jan 19, 2016 113
Utb - extending the cooling system in the building u51 and u52. Jan 19, 2016 144
Supply, assembly and testing of radiator fan drive arrangement for wds6 locomotives. Jan 19, 2016 119
Water chiller. Jan 19, 2016 120
Off season repairing and maintenance of cooling towers for main air conditioning plant at hotel samrat. Jan 19, 2016 134
To supply & install a cooling system. Jan 19, 2016 173
Supply of Cooling tower water treatment chemical CWT-302 in 10 kg pack, CWT-402 in 10 kg pack, CWT-404 in 10 kg pack, CWT-201 in 30 kg pack. Jan 18, 2016 184
Set of flexible hoses for water cooling system, wds6r loco e r drg. no.Ccc-dl-761,alt-6,item 13 to 19 with spl.Terms and condition asper annexure-b attached. Jan 18, 2016 388
Providing laminar flow air conditioning system, electrical and civil works consequent upon renovation modification to the existing operation theatres in hal hospital, bangalore. Jan 18, 2016 132
Supply, testing , installation and commissioning of hand tools, instruments, shop outfit, equipment and machinery for the trade of mechanic refrigeration and air conditioning. Jan 18, 2016 144
Spply of 1.5 T Closed Cycle Water Chiller Unit. Jan 18, 2016 125
Repair maintenance of 750 tr carrier make chiller plant and bms software upgradation at dare including repairs to central ac plants and package dx type ac plants at gtre bangalore. Jan 18, 2016 153
Controller/compressor for chiller. Jan 18, 2016 117
Round the clock biocide treatment by dosing of chlorine-di-oxide with genarox system in cooling tower of 2x210mw, ptpp, parichha. Jan 18, 2016 118
Replace existing cooling tower with a forced draft tower, new tower is to be compatible with the existing design conditions, power and control requirements to be verified by the contractor at the time. Jan 18, 2016 105
Central plant chiller & cooling tower replacement. Jan 18, 2016 142
Central plant chiller & cooling tower replacement. Jan 18, 2016 139
Leo in a chiller thriller. Jan 17, 2016 256
Work Of Cleaning Of Suction Strainers Of Various Pumps, Gs Cooling Tower Nozzles & Material Handling Work In Ktps Stage-Ii. Jan 17, 2016 131
Purpose of furnishing a new air cooled chiller for the county administration building. the work includes furnishing a packaged air cooled chiller, pumps, glycol, glycol feeder, side stream filter, and. Jan 17, 2016 103
Repair, maintenance works of cooling system & auxiliary pumps and supplying manpower for miscellaneous operation & maintenance works of bera pumping station under pabna mechanical o & m division durin. Jan 17, 2016 115
AMC of water chiller plant. Jan 16, 2016 128
Operation Of Water Purification System For Drinking Water Alongwith Aqua Chiller At Trauma Centre. Jan 16, 2016 118
Off season repairing and maintenance of cooling towers. Jan 16, 2016 122
Over hauling, repairing, dismantling & installation of Split & Window type room Air conditioner at different places of State Government circuit House and I.B. Office under Circuit House Electrical Se. Jan 16, 2016 101
Upgrade and replacement of hvac systems for the 2-story classroom i administration building with a new variable refrigerant flow system, removal of existing chiller and boiler plant, air hand handlers. Jan 16, 2016 119
Supply and delivery of cooling tower chemicals. Jan 16, 2016 101
Provision of preventive maintenance agreement for team chiller (fcsm). Jan 16, 2016 102
Current operation and maintenance of installations and equipment for ventilation and air conditioning and heat distribution and booster sets are located on the premises of the chancellery of the sejm. Jan 16, 2016 250
Heating supplies / cooling systems. Jan 15, 2016 213
Annual Maintenance Contract for Daikin make room Air Conditioner installed at IOCL offices and other Building in Delhi and NCR. Jan 15, 2016 137
Supplying and installation of pet blowing machine air compressor refrigiated air drier and water chiller for the package drinking water plant (kulik fresh ) of raiganj municipality. Jan 15, 2016 143
Maintanance of panel & hyd. chiller. Jan 15, 2016 123
Repairing of cooling tower and chilled water pipe line insulation and other misc. work of the central a.C. plant, main building, high court at calcutta. Jan 15, 2016 151
The school district has already procured a new chiller and the contractor shall bid the installation of the boiler and chiller plant including all equipment materials, new ddc controls, piping, specia. Jan 15, 2016 138
Chiller replacement. Jan 15, 2016 122
SIX-GOAL CHILLER; Gunners had chance to show title resolve.. but old failings return. Jan 14, 2016 701
Annual Operation Contract for Air Conditioning and Chiller plants. Jan 14, 2016 111
Supply, testing , installation and commissioning of short fall hand tools, instruments, shop outfit, equipment and machinery for the trade mechanic refrigeration and air conditioning. Jan 14, 2016 153
Procurement of complete assembly of water cooled screw type AC Chiller 150TR for Central AC plant PHI SGTPS Birsinghpur along with its installation and commissioning in place of existing centrifugal c. Jan 14, 2016 157
Supply of spares for cooling towers. Jan 14, 2016 109
Repair/Maintenance Of Various Type Of Continuous Pickling, Soaping, Washing, Rinsing And Drying Unit,Lta Furnaces, Brighting & Passivation Unit,Water Chillers, Cooling Towers,Blowers & Lubrication Sys. Jan 14, 2016 284
Supply and fixing of straight turret Nozzles and reducer for cooling tower stage-II. Jan 14, 2016 125
civil works around cooling tower & other area work in 2x210 mw & 250 mw ptpp, parichha. Jan 14, 2016 116
Open tender for the right to sign the agreement to supply spare parts for routine maintenance cryogenic system magnetic resonance imaging ingenia 3.0t. Jan 14, 2016 170
Badgley Hall Chiller Installation. Jan 14, 2016 229
The project includes the replacement and relocation of the existing cooling tower. Jan 14, 2016 156
United Arab Emirates : One of the UAEs largest district cooling plants unveiled at Abu Dhabi Airports Midfield Terminal Building site. Jan 14, 2016 200
Staatsbad pyrmont; renovation and modernization of the queen louise bath; air conditioning systems. Jan 13, 2016 140
Construction Of Business Cum Training Centre Including Water Supply Drainage And Sanitary Installation And Internal Ei Fans Light Fixtures Street Light Fire Fighting Fire Alarm System Air Conditioning. Jan 13, 2016 129
Earth Work And Transporting For Levelling South Side Area Of Main Cooling Tower In Ammonia Plant. Jan 13, 2016 130
Supply of Spares For Cooling Tower Unit 7 To 10. Jan 13, 2016 124
Spares for voltas make chiller, model: acegwfxr1201ml. Jan 13, 2016 110
Operation and Comprehensive Maintenance of Central AC Plant Package units at DDUH Hari Nagar new Delhi SH Providing of 80 TR capacity cooling tower for plant no 1. Jan 13, 2016 148
TTPS Operation Circle CAD ACWPH - Unit II Cleaning of louvers and nozzles of Fan less cooling Tower for the period from 08.04.16. Jan 13, 2016 187
TTPS Operation Circle CAD ACWPH - Unit I Cleaning of louvers and nozzles of Fan less cooling Tower for the period from 08.04.16 to 3. Jan 13, 2016 127
TTPS Operation Circle CAD ACWPH - Unit III Cleaning of louvers and nozzles of Fan less cooling Tower for the period from 08.04.16. Jan 13, 2016 187
Chiller replacement. Jan 13, 2016 102
Chiller addition. Jan 13, 2016 102
Provision Of Grossmont College Main Chiller Addition. Jan 13, 2016 183
This project consists of the installation of a 20 ton water cooled chiller and associated fittings, valves and piping, and the installation of a circulation pump, expansion tank, air/dirt separator an. Jan 13, 2016 118
Global Automotive Radiator Industry. Jan 13, 2016 7212
New theatre in reutlingen - "the buoy" - heating and cooling systems verso approximation -. Jan 12, 2016 158
Maintenance And Servicing Of Fan Coil Units, Fresh Air Filters, Air Washers, Cooling Towers And Air Supply Grilles At RLG And PRAFPUL Building, BARC, Mumbai-400085. Jan 12, 2016 135
Renovation of constitution club, swimming pool and development of banquet area at rafi marg new delhi sh: replacement of air conditioning system with vrv/vrf system for 2nd floor. Jan 12, 2016 129
Repair of damaged concrete work in induced draft cooling tower (idct) for ntpc sipat stage-i units. Jan 12, 2016 138
Overhauling contract for natural draft cooling towers stage-ii (2x490mw). Jan 12, 2016 115
Supply and Installation of Valves and MS Pipe in AC Plant and Cooling Tower at Delhi Sachivalaya. Jan 12, 2016 142
Operation and Maintenance of Thermal Energy Storage Air Conditioner Tank System Chiller Plant at SWaRA Bhawan, Bhopal. Third Call. Jan 12, 2016 124
Operation and Maintenance of Thermal Energy Storage Air Conditioner Tank System Chiller Plant at Vishveshwarya Bhawan, Bhopal. Third Call. Jan 12, 2016 127
German Green Cooling Initiative. Jan 12, 2016 336
Abu Dhabi unveils biggest district cooling plants. Jan 12, 2016 196
Cleaning Of Cooling Towers And Sumps Of Pipe Bending Machines And Compressor House. Jan 11, 2016 137
Overhauling Of Associated / Allied System Of The Engines Like Cooling System, Hydraulic System, Electronic Governing & Engine Related Electrical System Of 09 Nos Of 1400Hp Demu/Dpc & 03 Nos Of 700Hpde. Jan 11, 2016 171
P/f interlocking tiles under the cooling tower, national phytotron facility at iari, new delhi-12. Jan 11, 2016 139
Renovation to the ei work incl airconditioning and fire detection system at mtp ot ground floor of eden building kmch kolkata under mches i pw dte air conditioning system. Jan 11, 2016 154
Maintenance and servicing of fan coil units, fresh air Filters, air washers, cooling towers and air supply grilles at RLG & PRAFPUL Building, BARC, Trombay, Mumbai - 400 085. Jan 10, 2016 166
Providing of El & fans including air conditioning and fire fighting system. Jan 9, 2016 104
dismantling of existing air conditioning plants and other allied equipments installed at the terrace of existing library auditorium of GMC Jammu. Jan 9, 2016 143
Supply Installation Testing and Commissioning of AHU Condensing Unit and allied jobs at Eye OT of GMCH Jammu. Jan 9, 2016 138
Renovation, Modificationand Alteration Incl. Air Conditioning System Of Biochemistry Depart. To Accomodate & Extend The Library Space At 2Nd Floor Of Academy Building Within Nrs Campus-Supply Laying O. Jan 9, 2016 113
Civil repair & maintenance work at cooling tower & clarifier area in plant premises. Jan 9, 2016 113
Supply of Nail Chiller(Mild Steel). Jan 9, 2016 186
Airport Heating, Ventilation, Air Conditioning (HVAC) System Maintenance Service Contract. Jan 9, 2016 103
Global Automotive Radiators Strategic Business Report 2015-2020 - Launch of Novel Coatings for Radiators to Benefit the Market. Jan 8, 2016 512
Global Automotive Radiators Strategic Business Report 2015-2020 - Launch of Novel Coatings for Radiators to Benefit the Market. Jan 8, 2016 518
Preventive maintenance of cooling towers at nfl bathinda. Jan 8, 2016 136
Repairs & protection to natural draft cooling towers unit 3, 4 & 5 at tps gandhinagar. Jan 8, 2016 192
Supply Of Spray Nozzles For Cooling Tower. Jan 8, 2016 107
Purchase of pco 3 k smart controller for chiller. Jan 8, 2016 109
Procurement of lt motor for hvac frp cooling tower. Jan 8, 2016 109
Fan drive 11kw motor. Jan 8, 2016 105
Round The Clock Bicide Treatement By Dosing Of Chlorine Di Oxide With Generax System In Cooling Tower Of 2X210 Mw Ptpp Parichha. Jan 8, 2016 148
Chiller rebuild - fci three rivers. Jan 8, 2016 105
Installation Of Chiller Unit In Bldg. No. 191/Unit-Iv As Per Specification. Jan 8, 2016 107
Supply, Assembly and testing of Radiator fan drive arrangement for conversion of YDM4 to WDS6 locomotives. Jan 7, 2016 116
Comprehensive Maintenance Of Electrical Sub Stations, Air Conditioning Plant And Scada System At Afs Sulur. Jan 7, 2016 148
Repair of damaged concrete work in induced draft cooling tower (idct). Jan 7, 2016 109
Spares for cooling towers at barh stpp. Jan 7, 2016 110
Routine and preventive maintenance (mechanical) of cw/sacw/acw pumps & cooling towers of unit no. 08 & 09,2x250mw, htps,. Jan 7, 2016 117
Shifting of m.s. pipes of various sizes of ash handling plant of 2x250 mw extn. from a- power house to area between cooling tower of unit no. 8 & 9, 2x250mw extn. htps. Jan 7, 2016 133
Service, Install York 125 Ton Chiller, Per Specifications. Jan 7, 2016 163
New battery thermal management system (BTM), a thermoelectric cooling system for batteries used in hybrid and electrified vehicles. Jan 7, 2016 181
SGS Informs on EU Updates Affecting Energy Labeling Requirements for Refrigerated Storage Equipment. Jan 6, 2016 534
Siilaisen health center renovation and expansion, phase 2, central kitchen, blast chiller rooms. Jan 6, 2016 209
Renovation Of Constitution Club, Swimming Pool And Development Of Banquet Area Rafi Marg New Delhi Sh: Replacement Of Air Conditioning System With Vrv/Vrf System For 2Nd Floor. Jan 6, 2016 116
Repairing And Overhauling Of Compressor Kirloskar Chiller Model Kwr 75 Of 75 Tr Capacity. Jan 6, 2016 164
Gasket, armored assly for water cooling system to c.Rly. drg. no. ci/wca-6 alt.-2 with part drgs. i tpl - 0317 alt. d or latest pt. 11105940 ii tpl - 318 alt. d or latest pt. 11325719. Jan 6, 2016 126
Comprehensive maintenance of electrical sub stations, air conditioning plant and scada system at afs sulur. Jan 6, 2016 131
Non comprehensive amc for advance x-ray diffractometer and chiller. Jan 6, 2016 122
Camc of xrf pw 2424 magix dy0772 along with chiller and computer. Jan 6, 2016 128
Controller/compressor for chiller. Jan 6, 2016 117
Supply Of Complete Cooling Tower Fan Assembly. Jan 6, 2016 128
Repair of cooling tower cells in hp nitric acid plant at rcf trombay. Jan 6, 2016 132
Supply Erection And Commissioning 20klph Milk Chiller Plant (Phe) For Milk Chilling. Jan 6, 2016 128
Certain essential repair to air ducts, cooling tower, vfd motors, ventilation system, kawatch and dakin fcus, air quality survey and provn of deficient facilities in central ac plant and manekshaw cen. Jan 5, 2016 167
Supply of spares for cooling tower stage-2and3. Jan 5, 2016 111
Lubricating oil poe-46 for kirloskar chiller model-peh-100. Jan 5, 2016 117
Supply of Chiller (circulation thermostat). Jan 5, 2016 118
Installation of Water Chiller at Mahabir nagar W.No.21. Jan 4, 2016 118
Rmo 2 x 550 tr and 1 x 350 tr centrifugal air conditioning plant at supreme court of india, new delhi. sh repairing of cooling tower. Jan 4, 2016 131
Cooling tower (idct) as per technical specification no. pe-ts-409-165-n001 for 1x350mw kpcl yalahanka ccpp. Jan 2, 2016 123
Rmo dg set and ac plant at nml ansari nagar new delhi sh dismantling fabricating and replacement of steel structure frame for cooling tower make up tanks. Jan 2, 2016 128
Rmo dg set and ac plant at nml ansari nagar new delhi sh modification of existing chiller water pipe line for header of central ac plant. Jan 2, 2016 127
Comprehensive maintenance of screw chiller 3 x 120 tr at pegasus, repair and maintenance of vrf ac plant and provision of certain sanctioned works under age e/m no.Iii at naval base, kochi. Jan 2, 2016 159
guniting for structural repair of gre and fccu cooling tower at gujarat refinery. Jan 2, 2016 133
Mechanical maintenance of scraper conveyor, clinker grinder, esp, boiler ducts, ash disposal pump house, ash water pump house, ash brick plant, dm plant, oil handling plant, cooling tower of spp at na. Jan 2, 2016 149
Procurement of 30 hxc chiller machine control system spares. Jan 2, 2016 114
Procurement of temperature sensor for screw chiller system. Jan 2, 2016 113
Routine/preventive/breakdown maintenance of sample conditioning system and its chiller system of unit no. 1&2, 2x110 mw, ptpp, parichha. Jan 2, 2016 129
Restore the exhaust fan drive systems. Jan 2, 2016 467
Replacement of a 125 ton water cooled chiller. Jan 2, 2016 121
Doha Metro Rail project- District Cooling. Jan 2, 2016 181
Supply and installation of water cooling system for air conditioning in the building of eusko jaurlaritza / basque government. reference number: km / 2016/021. Dec 31, 2015 518
Water cooling system - 1.000 no. Dec 31, 2015 101
Installation, Overhauling, Testing And Commissioning Of Chiller Units Of Air Conditioning And Ventilation System. Dec 31, 2015 147
Provision of effluent treatment plant for treating of waste water from engine test house and recycling of treated water to eth cooling tower at efa. Dec 31, 2015 119
Dismantling Fabricating And Replacement Of Steel Structure Frame For Cooling Tower Make Up Tanks. Dec 30, 2015 103
Replacement Of Jocky Pump Pipe Line Along With Accessories And Repairing Of Cooling Tower. Dec 30, 2015 101
Purchase of rotavapor with vacuum pump and chiller. Dec 30, 2015 126
Design Engineering Supply Erection Testing And Commissioning Of 02 Nos Of 350Tr Capacity Water Cooled Chiller Type Hvac System For Admin Building Of Iocl Paradip Refinery. Dec 30, 2015 147
Replacement Of Fire Fighting And Acw Cooling Tower Mserw Pipe Line. Dec 30, 2015 101
Provision of central air conditioning and air cooling system for a multi storied otm accn building at jaipur. Dec 30, 2015 170
Sea water cooled marine screw drive chiller. Dec 29, 2015 103
Modification Of Existing Chiller Water Pipe Line For Header Of Central Ac Plant. Dec 29, 2015 102
Design, fabrication, performance testing with dummy process heat load, packing, safe door delivery, installation at site, testing and commissioning of packaged two stage cascaded refrigeration chiller. Dec 29, 2015 157
Repairing of cooling tower and chilled water pipe line insulation and other misc. work of the central a.C. plant, main building, high court at calcutta. Dec 29, 2015 144
Operation of 2x34 TR Air Cold Scroll Chiller Blue star Make at CSSD. Dec 29, 2015 140
Electrical Installation, Air Conditioning and Audio Video system of light weight steel construction of Biochemistry Department on the roof top of Baker Building within NRS campus --- Supply of pedesta. Dec 29, 2015 119
Providing comprehensive maintenance to air conditioning with vrv system for the ap legislative council in the premises of public gardens, hyderabad for the year 2015-16(i.E 4 months from 1.12.15. to 3. Dec 29, 2015 156
MTPS I - Civil Circle CM Dn II - Cleaning and removal of algae from PSC fill bars in Cell No: 1, 3&4 at Cooling Tower Unit- III. Dec 29, 2015 123
Air cooler desert specification: cooling system main motor with blade, suitable for cooking area of 150sq.Feet, 0.25hp water pump and all other accessories required for a cooking system 3 way speed co. Dec 29, 2015 163
Chiller replacement. the project is "turnkey", the work includes: disconnecting electrical service, disconnect chilled water piping and removing existing air cooled chiller; installing new chiller, co. Dec 29, 2015 108
Supply and Maintenance of Air Conditioning, Ventilation and Exhaust System Filters to Royal Perth Hospital. Dec 28, 2015 116
Moei and fans dg set s stn c light 3x200 trac plant at nssta greater noida sh repairing to 200tr screw chiller mcquay. Dec 28, 2015 123
Moei and fans ic. changeover feeder pillar, security alarm system at rcr complex, new delhi. sh:- supply of heating element with thermostat for solar water heating system. Dec 28, 2015 128
C/o of annex building for idbi bank at cbd belapur navi mumbai sh strengthening of columns for support of cooling tower. Dec 28, 2015 119
Supply,Installation, Testing and commissioning of Air Cooling system in Training School Hostel at Shastri Park Depot. Dec 28, 2015 105
Amc for compressors of bl18 and test house, dg sets of cpp and cooling towers for a period of two years. Dec 28, 2015 127
Comprehensive annual maintenance contract of ac package units ac trolleys and chiller units of different capacities located inside factory tti and administrative building. Dec 28, 2015 124
Renovation of ei work incl air conditioning and fire detection system at mtp ot ground floor of eden building at mch kolkata ei work. Dec 28, 2015 153
Providing Addition to Alteration withstandby arrangment to 40 Ton Chiller Unit for operation theater at saint george Hospital Cst Mumbai System at Mumbai. Dec 28, 2015 164
Amc kirloskar make chiller. Dec 28, 2015 117
Repairing rewinding of Sealed Semi Sealed compressors of packaged ACs units chiller units dryer units window and split ACs and water coolers and fan motors of window split ACs water coolers at STPS pl. Dec 28, 2015 101
Flow control valve water distribution Galvanized iron casing for cooling tower-II as per drawing enclosed. Dec 28, 2015 146
Maintenance work and technical management systems of energies installations, fluids and air conditioning. Dec 27, 2015 181
Notice inviting e-tender for lining of contract for cooling tower top deck target nozzles cleaning for ct performance improvement in urea plant at rcf, thal. Dec 27, 2015 147
Ordinary and extraordinary maintenance for thermal systems and air conditioning. Dec 27, 2015 221
Heating and refrigeration equipment for the new center for synthetic life sciences (zsl). Dec 26, 2015 143
Strengthening Of Columns For Support Of Cooling Tower. Dec 26, 2015 111
Certain essential repair to air ducts, cooling tower, vfd motors, ventilation system system, kawatch and dakin fcus, air quality survey and provn of deficient facilities in central ac plant and maneks. Dec 26, 2015 167
Off season works of servicing and repairing of main cooling towers and other related works at the hotel ashok new delhi. Dec 26, 2015 146
Inspection charges for modification of control system of screw chiller (hvac) at service building. Dec 26, 2015 119
Chiller replacement. Dec 26, 2015 130
Service maintenance of equipment maintenance and thermal heating and air conditioning of military units located in the geographical area of ??responsibility of the 4th suige west from 1.1.2016, or if. Dec 26, 2015 183
Universittsmedizin rostock, new central medical functions, install ventilation and cooling systems, 15e0294k. Dec 24, 2015 110
Heating supplies / cooling systems. Dec 24, 2015 211
Comprehensive bi-ennial maintenance of precision air conditioning (pac) system of dcs in stage - 1 units. Dec 24, 2015 128
Installation work of cooling equipment. Dec 24, 2015 209
Air-cooled Helical Rotary Water Chiller. Dec 24, 2015 131
BSB Chiller Replacement. Dec 24, 2015 156
Const pm svcs - archives bldg chiller modifications. Dec 24, 2015 130
Utility equipment chiller 10 tr. Dec 23, 2015 106
Repairing To 200Tr Screw Chiller Mcquay. Dec 23, 2015 118
Supply, testing , installation and commissioning of hand tools, instruments, shop outfit, equipment and machinery for the tcrade mechanic refrigeration and air onditioning. Dec 23, 2015 150
Water Cooled Screw Chiller of capacity 140 TR Controlled with Micro Computer based Control Panel for Central Air Conditioning Plant. Dec 23, 2015 133
Current operation and maintenance of installations and equipment for ventilation and air conditioning and heat distribution and booster sets are located on the premises of the chancellery of the sejm. Dec 23, 2015 248
Conditioning of cold water basin/hot water channel and replacement of damaged distribution pipe & nozzles of one cooling tower of 2x210mw ptpp parichha. Dec 22, 2015 123
Open tender for the right to sign the agreement to perform extensive repairs of the technical equipment air conditioning and ventilation of industrial buildings ask-1 at the following address: ul. aca. Dec 22, 2015 171
Maintenance of kitchen equipment and refrigeration chu amiens. Dec 22, 2015 155
Utility equipment cooling tower 40 tr. Dec 22, 2015 108
Air cooled 2 tr water chiller unit. Dec 22, 2015 112
Water purifier with chiller cum water dispenser similar to model/make : kent ro water purifier with specifications 1 purification by ro uf uf tds 2 higher purification capacity of 25 ltrs/hr with twin. Dec 22, 2015 203
Re-Winding to vertical turbine pump No.3 of Ainapur Lift Irrigation Scheme 1st stage of Cromton Greaves make complete overhauling of motor including cooling system is to be carried out including all c. Dec 22, 2015 108
Cleaning of cooling tower pond No.4A & 4B during AOH shutdown of unit No.4, stage II, NTPS. Dec 22, 2015 127
Supply of ACB (Asbestos Cement Board) drift eliminators and concrete spacers of cooling tower during Unit#4 AOH. Dec 22, 2015 131
Procurement of cooling tower riser header MSERW pipe. Dec 22, 2015 121
Fill pack for cooling tower. Dec 22, 2015 116
Water Cooled Screw Chiller of capacity 140 TR Controlled with Micro Computer based Control Panel for Central Air Conditionin. Dec 22, 2015 120
HVAC Equipment Market , Air Conditioning , Ventilation ; End-use Application: Residential, Commercial, Industrial - Global Industry Analysis, Size, Share, Growth, Trends and Forecast 2015 - 2023. Dec 21, 2015 747
Water chiller unit for bolt heating device. Dec 21, 2015 145
Supply of Air cooled 2 tr water chiller unit. Dec 21, 2015 165
supply, erection and commissioning of 30 klph milk pre-chiller at ernakulam dairy. Dec 21, 2015 143
Main hydraulic pump radiator fan drive to rexroth part no.A2fo 63/61l-vab 05-s or cil part no. 4071329 or equivalent for 1400 hp demu/dpc. Dec 21, 2015 166
Energy efficient 15 w 110v, dc led downliers fittted with 18 x18 die cast alu. and over voltage protection integrated high efficiency long life active cooling system,make-asian/ssk, bajaj or similar. Dec 21, 2015 160
Matched gear set for after cooler fan drive consisting of one number drive gear as per dlw part no. 10.14.0955,dlw drg.No.35b-79002-1 alt-d and one number idler gear as per dlw pt no. 10.14.0943 dlw d. Dec 21, 2015 174
Hall chiller replacement. Dec 21, 2015 148
Construction manager at risk for renovations to high school including asbestos abatement coordination with district vendor, boiler and chiller replacement, electrical and plumbing system updates. addi. Dec 21, 2015 117
Data Center Cooling Market in Latin America 2015-2019 - Market Segmentation By Cooling Systems & Technology. Dec 21, 2015 619
Data Center Cooling Market in Latin America 2015-2019 - Market Segmentation By Cooling Systems & Technology. Dec 21, 2015 625
MY PLUNGE IN FREEZING SEA FOR NEW ROYAL; Angela's New Year's day charity chiller. Dec 20, 2015 409
The project consists of the replacement of hvac controls system; replacement of select mechanical equipment and cooling tower; and corrective work to fire sprinkler system. Dec 20, 2015 120
Refrigeration, Air Conditioning and Process Cooling Equipment Maintenance Services and R22 Replacement. Dec 19, 2015 150
This Contract Is For The Installation Of An Autonomous Cooling System, Powered By An Inverter To The Premises Of The National Museum Of Asian Arts Guimet, 6, Place Jena, 75116 Paris, As Well As Supply. Dec 19, 2015 317
Purchase of a new 180 ton carrier screw chiller, removal of existing chiller,. Dec 19, 2015 145
Cleaning And Painting Of Cooling Towers. Dec 18, 2015 124
New air cooled chiller will be placed to west of existing boiler room, to serve classrooms in 1964 building. existing unit ventilators in classrooms will be replaced with new unit ventilators. cafeter. Dec 18, 2015 117
Global Cooling Towers Market 2015-2019 With Baltimore Aircoil Company, Delta Coolong Towers, GEA Heat Exchanger, Hamon & Spig Dominating. Dec 17, 2015 664
Global Cooling Towers Market 2015-2019 With Baltimore Aircoil Company, Delta Coolong Towers, GEA Heat Exchanger, Hamon & Spig Dominating. Dec 17, 2015 670
Supply And Fixing Of Acs, Chiller And Microwave Oven In Admin Building. Dec 17, 2015 127
Cleaning And Repainting Of Chiller Hot Water Pipe Lines Of Various Ahus. Dec 17, 2015 112
Rmo ac plant at vigyan bhawan, new delhi sh cleaning and repainting of chiller hot water pipe lines of various ahus. Dec 17, 2015 121
Rmo 2 x 550 tr and 1 x 350 tr centrifugal air conditioning plant at supreme court of india, new delhi. sh repairing of cooling tower. Dec 17, 2015 130
Supply of Blow Molding Machine, High pressure and Low pressure air compressors, Chiller Air Cooled, Chiller Tower, Refrigerant type Air Dryer for High & Low pressure compressors and Aluminum alloy Mol. Dec 17, 2015 127
Repair and renovation of e. i. at 7th floor for accommodation of phe deptt. - sitc of precision air conditioning system for server room. Dec 17, 2015 154
Oil seal for after cooler fan drive to dlw drg.No. tpe-10-0002, alt f sl.No.06 and to dlw part no.10171228 for alco diesel locomotives. Dec 17, 2015 118
Propeller shaft assembly,1600 series for radiator fan drive of b.G.Locos.Shaft in circlip design with flange and fastners,as per dlw drg. no.Tpl-1040,style ii,p.L.No.11-05-0238,alt-u hindustan hardy s. Dec 17, 2015 144
Provide a complete turn-key overhaul for chiller #1 to replace worn materials, restore compressor performance, replace purge pump and provide better reliability and additional service life. Dec 17, 2015 113
Annual maintenance contract for 14 nos of ahu 03 nos of cooling towers and 09 nos of fcu for the period feb 2016 to jan 2017 at ddk mumbai. Dec 16, 2015 155
Camc of xrf pw 2424 magix dy0772 along with chiller and computer. Dec 16, 2015 131
One set consisting 3 items 1 gasket fan drive to drg. no. 15 c-76738 to pl 10170972 qty.16 nos. 2 gasket air elbow to after cooler drg. no. 15c-764402 to pl 10171162 qty.60 nos. 3 gasket air elbow to. Dec 16, 2015 162
Provision of effluent treatment plant for treatment of waste water from engine test house (eth) and recycling of treated water to eth cooling tower at efa. Dec 16, 2015 206
Motor fan drive to denison model no.Vm 4c 055 in 00a 102 suitable for 700 hp demus make denison. Dec 16, 2015 124
Perfomance assessment (study) and suggestion for improvements in cooling towers of all 4 units(4x 210 MW) of MTPS-I. Dec 16, 2015 130
Cooling tower replacement services for u.s. embassy tokyo apartment compound. Dec 16, 2015 115
Maintenance of facilities and heating equipment - ventilation - air conditioning of the midi-pyrnes observatory. Dec 15, 2015 139
Providing Electrical Installation, Air Conditioning, Afd System, Service Connection, Dg Associated Work. Dec 15, 2015 116
Controller/compressor for chiller. Dec 15, 2015 117
India,United States : PAHARPUR COOLING TOWERS to take over dry cooling business of SPX Cooling. Dec 15, 2015 115
Provision of air cooling system at gcf jabalpur. Dec 14, 2015 136

Terms of use | Copyright © 2016 Farlex, Inc. | Feedback | For webmasters