Printer Friendly

Browse Conveyors topic

 

Articles

1-300 out of 600 article(s) nextnext page
Title Author Type Date Words
Repair & Fabrication Jobs Of Various Chutes & Conveyors In Sinter Plant (part-6&7) For 2016-17. Jul 20, 2016 132
Cleaning And Removal Of Spillage Coal Along Conveyor No 5,6,7,8,9,10 And 11 And Loading The Same On Belt In Chp. Jul 20, 2016 142
Periodical Shortening Of Conveyor Structures,pvc Belting,haulage Tracks And Pipeline In Cm Panel In Seam C. Jul 20, 2016 138
Supply Of New Purlin Structures And Roof Sheets In The Conveyors Bcn 41 A And 41 B From Tail End Column No A To T9. Column Jul 20, 2016 129
Mtps-i - Chp-ii - Mech Ii Sub Division -carrying Out Fabrication And Cold Vulcanizing Of Joint & Patch Vulcanizing. Jul 20, 2016 154
Ttps Strengthening And Protecting The Structures Of Coal Jetty Ii Conveyor System From Approach Bridge Road To Jt 27 Span 1 2. Jul 20, 2016 143
Ttps Strengthening And Protecting The Structures Of Coal Jetty Ii Conveyor System From Conveyor 71 Span 18 - 20. Jul 20, 2016 136
Supply Of Various Seals And Circlips For Codco Belt Conveyor Rollers For Alp. Jul 20, 2016 132
Repairing And Jointing Of Longitudinally Cut Conveyor Belt Having 4 Plies, 1500 Mm Original Width,1250 Kn Per Meter Strength By Hot Steam Vulcanizing Process, Of Chp, Atps, Anpara. Jul 20, 2016 173
Procurement Of Rivet Hinged Type Belt Fasteners For Belt Conveyors. Jul 20, 2016 123
Parcel Conveyor Systems And Side Units (sorting Tables For Parcel Booking Centre, Baria House, Jacob Road, Jaipur. Jul 20, 2016 163
Rate Quotation For Supply Of Return Idler For Belt Conveyor And Throughing Idler With Bracket To Dcl. Jul 20, 2016 129
Transferring Of Lignite From Stock Yard To Internal Conveyor 12a/b In Lhs Of Tps-i Expn. Jul 20, 2016 149
Non Drive Take-up Pulley For Bcn For Conveyors. Jul 20, 2016 108
Supply And Installation Of 2 Nos. Of Telescopic Conveyors At Raiganj Lpg Plant. Jul 19, 2016 109
Modification/ Strengthening Of Structure And Conversion Of Fastener Joint To Hot Vulcanizing Joint For Et-8 & Conveyor Belt System. Jul 19, 2016 135
Rate Quotation For Supply Of Spares For Salt Belt Conveyor To Dcl. Jul 19, 2016 124
Detail Engineering, Manufacturing, Testing And Supply Of Conveyor Pulleys. Jul 19, 2016 148
Supply Of Heat Resistant Conveyor Belt Size 500 Mm Wide For Ash Handling Plant Of Unit No.3 At Sikka Tps. Jul 19, 2016 226
Supply Of Chip Conveyor And Chip Trolley. Jul 19, 2016 106
Arresting Water Leakage From Conveyor 31a/b. Jul 19, 2016 112
Supply Of Bearings For Conveyor Pulley Of Chp. Jul 19, 2016 112
Steel Cord Conveyor Belt 1800mm St 2250. Jul 19, 2016 113
Procurement Of Coupling Bush For Apron Plate Conveyor Main Gear Box Drive. Jul 19, 2016 112
Steel Cord Conveyor Belt 2000mm Wide St 3150 With Top Cover 14mm And Bottom Cover 10mm As Per The Specification Enclosed. Jul 19, 2016 127
Furnace Conveyor Chain With Pitch 4" Line 5 X 20,. Jul 19, 2016 123
Spares For Btl Make Gear Box, 55kw, 800mm And 90kw, 1000mm Belt Conveyor. Jul 19, 2016 124
Spares For Vishwa Make Gear Box, 55kw, 800mm And 90kw, 1000mm Belt Conveyor. Jul 19, 2016 124
Structural Steel Work For Minor Repairing Of Feeder Breaker And Connected Belt Conveyor. Jul 19, 2016 152
Replacement Of Worn-out Return Side Idler Fixing Clamp In Conveyor 8a1, 8b1, R1 & R2. Strengthening Of Motor Bed, Head Pulley Bed And Tail Pulley Bed For Arresting The Vibration In Reject Conveyor R1. Jul 19, 2016 143
Supply Of Various Types Of Idlers For Echs Wagon Loader And Echs Conveyors. Jul 19, 2016 112
Supply And Erection Of Sfd 1a Discharge Chute Of Conveyor 48a1 At Pch-ii. Jul 19, 2016 115
Replacement Of The Corroded Damaged Technological Structures. Jul 19, 2016 128
Replacement Of Damaged Corroded Counter Weight Technological Structures For Conveyor. Jul 19, 2016 110
Nctps 1 M Ii Echs Replacement Of Worn Out Damaged 1600 Mm Width Steel Cord Conveyor Belt In Conveyor Bcn 59 With New Reconditioned Belt. Jul 19, 2016 132
Supply And Erection Of Fixed Carrying Idler Stand For 1600mm Conveyor Belt. Jul 19, 2016 134
Fabrication, Supply, Erection And Commissioning Of Ss 304 Gr. Tunnel Hopper Grill For Conveyor 36a & 36b 2 Items. Jul 19, 2016 179
Supply Of Various Types Of Idlers For Echs Wagon Loader And Echs Conveyors. Jul 19, 2016 126
Nctps 1 M Ii Echs Replacement Of Worn Out Damaged 1600 Mm Width Steel Cord Conveyor Belt In Conveyor Bcn 59 With New Reconditioned Belt. Jul 19, 2016 405
Replacement Of Damaged Corroded Counter Weight Technological Structures For Conveyor. Jul 19, 2016 403
Replacement Of The Corroded Damaged Technological Structures Of Conveyor 7 Head End And Conveyor 10 Tail End Area. Jul 19, 2016 401
Ukraine : Northern gok commissions the first line of crushing and conveying system with a value of uah 1.9 billion. Jul 19, 2016 237
Construction Of A Center For Logistics And Technical Instandsetzung_fachplanung Technical Ausrstung_stark- And Low Power / Communication And Information Technology Equipment / Conveyors According Hoai. Jul 19, 2016 232
Cold Vulcanizing Conveyor Belt Joints Of U-80b, 101 ,107 , 114 And 118 At Mohuda Coal Washery. Jul 19, 2016 127
3x660 Mw North Karanpura Stpp, Jharkhand Through Bhele-procurement Portal: Conveyor Belt (rfq Ref:77/16/6117/kms). Jul 19, 2016 104
2 items of conveyor spares. Jul 17, 2016 105
Jointing ( cold valcanising process) of rubber conveyorbelting 1200 mm & conveyor pulley lagging of coal handling plant. Jul 17, 2016 129
Supply and installation of a conveyor dishwasher and hampers, and washing trays, on behalf of fedorest saca. Jul 16, 2016 146
Supply of Segregation Machine with Belt Conveyor to TMC Hungund. Jul 16, 2016 105
Cleaning Of Carbonaceous Materials Mixed With Shale- Debris And Stone Surrounding 32L Belt Conveyor At 51D-31L-32L-51D-33L-36L-52D-31L-33L-52D-33L-36L- 31L-50D-52D And 32L To 36L -50D-52D In R-Vi (Bonbahal) Seam Of Khottadih Colliery- Pandaveswar A. Jul 16, 2016 133
Installation and commissioning of 800mm wide 75 mtr. long new belt conveyor at 20 no. bankola seam of no. 2 pit at shyamsundarpur colliery under bankola area. Jul 16, 2016 129
Installation and commissioning of 800mm wide 75 mtr. Long new belt conveyor. Jul 16, 2016 176
Maintenance contract for conveyor belts in CHP. Jul 16, 2016 131
Procurement of spares for scrapper conveyor. Jul 16, 2016 110
Sleepers for 2000mm conveyor standard frames. Jul 16, 2016 106
Repairing /rewinding of 250kw,6.6 kv ht conveyor motor (s.No.13801000 of chp,khadia. Jul 16, 2016 116
Repair & fabrication jobs of various chutes conveyors in sinter plant part 6and. Jul 16, 2016 129
Improvement Of Illumination Along The S-4 Conveyor From Wq-7 Area To Flyover Ramp-B And From H-7 To M/S Vgcb Office Junction By Providing Light Fittings On Conveyor Gallery. Jul 16, 2016 157
Supply And Installation Of Conveyor Belts For The Airport Nice Cte D~azur. Jul 15, 2016 180
Installation and commissioning of 1200mm wide x 680 mtr. long gate belt conveyor at 25 l c.M district , panel -14 depillaring of shyamsundarpur colliery under bankola area. Jul 15, 2016 129
Dribble conveyor belt at ntpc barh. Jul 15, 2016 109
2 items of conveyor spares. Jul 15, 2016 105
Support rod small without roller required for distributor conveyor belt. Jul 15, 2016 170
Supply of New chp conveyor belt at kdocm for 1200mm belt at kamptee sub area. Jul 15, 2016 132
Supply and installation of propulsion systems with equipment. Jul 15, 2016 326
Mechanical three (3)-wheel street sweepers. Jul 15, 2016 148
Conveyor maintenance at bpcl coimbatore lpg plant. Jul 14, 2016 106
Procurement of spares of truck belt conveyor and pony belt conveyor for churi ug project, nk area. Jul 14, 2016 141
Procurement of Idler Rollers for 1400 mm wide conveyor belts. Jul 14, 2016 127
Work of Reconditioning of Screw Conveyor Assembly of Coal Mill BBD-4772 Unit 6 at BM-NPTPS Parli-Vaijnath. Jul 14, 2016 127
Removal of process reject from running conveyors in nchp and ochp. Jul 14, 2016 116
Cleaning Of Spilled Fallen Coal Below Belt Conveyor From A To C Belt To Lhd Panel In Seam C At Kurja Ug Mine. Jul 14, 2016 123
Cleaning Of Discharge Points Of Belt Conveyors. Jul 14, 2016 151
Raising and first year maintenance of OB plantation on the decks and slopes of dumping yard near B3/B4 conveyors in area of 15Ha , RG.III. Jul 14, 2016 102
Procurement of 3 way t scrapers for conveyors at ocp3 chp rg2 on proprietary basis. Jul 14, 2016 126
Suporter required for excavating conveyor belt of frm machine. make:- plasser or equivalent. Jul 14, 2016 159
cold vulcanizing joints of l and t chp conveyor belt at kdocm chp for 1200mm belt. Jul 14, 2016 118
Firefighters battle conveyor belt blaze at recycling plant; nearby residents warned to stay indoors and keep doors and windows closed. Jul 14, 2016 207
Supply of belt tracking system for 1600 mm wide conveyor system in chp-i at tps khaperkheda. Jul 13, 2016 131
Maintenance of 800mm belt conveyor along 9 le/78x to 103 x in katkona 3and 4 incline. Jul 13, 2016 131
Mechanical Maintenance Jobs Of All Conveyor Belts Of Stock House Bf-1 To 7. Jul 13, 2016 180
Supply of NON DRIVE PULLEYS FOR ECHS CONVEYORS. Jul 13, 2016 107
Supply of non drive pulleys for echs conveyors. Jul 13, 2016 123
NCTPS 1 M II Circle ECHS Dn Strengthening of short Supports and its foundations including renovation of cross supports and tie supports in the shore conveyor BCN 40A at coal. Jul 13, 2016 407
Distributor conveyor belt required for track machine. make:- plasser or equivalent. Jul 13, 2016 159
Nyeongun windows flood prevention projects gwangeup materials (crops narrow conveyor) purchase. Jul 12, 2016 106
Lift installation work. Jul 12, 2016 228
Installation & Commissioning Of 1200Mm Wide X 680 Mtr. Long Gate Belt Conveyor. Jul 12, 2016 128
Foundation work related to installation of conveyor belt along 5 dip from 6 pit shaft. Jul 12, 2016 154
Installation and commissioning of 1200mm wide x 680 mtr. Long gate belt conveyor. Jul 12, 2016 174
supply, installation, commissioning of 35 and 47.5 kg conveyor system and also 14.2 and 19 kg conveyor system. Jul 12, 2016 112
Maintenance Contract for Conveyor Belts. Jul 12, 2016 113
Supply of Spares For 90 Kw Drive Head For 1000Mm Conveyor Belt Hew Make. Jul 12, 2016 130
Dismanting, transportation and installation of 800mm belt conveyor. Jul 12, 2016 135
Maintenance of 1000mm belt conveyor. Jul 12, 2016 135
Maintenance of 1000mm belt conveyor along data dip between -1l to 12l i.E. at tb-1 belt in katkona 1 and 2 incline. Jul 12, 2016 137
Supply and erection of sealing plates for conveyors. Jul 12, 2016 116
Supply and erection of sealing plates for conveyors BCN 40 A/B. Jul 12, 2016 125
Cleaning of coal debris /mulma & other extraneous material below belt conveyor & surrounding of surface bunker at jharna ug of ghorawari colliery no. 1. Jul 12, 2016 124
GATORCOAT Outperforms Teflon for Solid Metal Conveyor Belts. Jul 12, 2016 517
Research and Markets - Global Chains and Sprockets Market for Material Handling Equipment 2016-2020 - Increased Miniaturization of Conveyors. Jul 12, 2016 533
Research and Markets - Global Chains and Sprockets Market for Material Handling Equipment 2016-2020 - Increased Miniaturization of Conveyors. Jul 12, 2016 573
Procurement of Spares of Conveyor Belt External Scrapers/ Cleaners for CHP at 2X600MW, SSTPP, MPPGCL, Dongalia, Distt: Khandwa M.P. Jul 11, 2016 133
Repair / replacement of street /security / perimeter lights and repair / maint of crane, conveyor belt and allied works. Jul 11, 2016 204
Procurement of belt rupture detectors for conveyor belts of chp. Jul 11, 2016 114
Arc for laying and jointing of conveyor belts for chp stage-ii. Jul 11, 2016 118
Maintenance of steel chord conveyor belt in chp stage-ii of ntpc mouda. Jul 11, 2016 119
Cleaning Of Malma Spillage Coal From Below And Side Of C 3 Incline Mouth ,C 4 1Ln And C 5 13Rise Belt Conveyor In 4A Seam At Jhiria U.G. Mine. Jul 11, 2016 146
Malma Cleaning,Removal Of Debris From Below And Sides Of 106Ln,54 Rise And 130 Ln Belt Conveyors In U.G. Galleries Of 4A Seam At Jhiria Ug Mine. Jul 11, 2016 144
Cleaning Of Spilled Fallen Coal Below Belt Conveyor In Seam C At Kapildhara Ug Mine. Jul 11, 2016 130
Gimpo international airport curve conveyor purchase installation. Jul 9, 2016 109
Replacement Of Shaft With Pinion And Its Both Side Bearings Of Belt Conveyor Gear Box Of Gkkcolliery. Jul 9, 2016 123
Rubber Lagging Of Different Conveyor Drums With 12Mm Sheet At Moonidih Coal Washery, Wwz, Bccl. Jul 9, 2016 120
Supplying chain conveyor (riveted type at salempur lpg plant. Jul 9, 2016 105
Cleaning Of Carbonaceous Materials Mixed With Shale- Debris And Stone Surrounding West Side Of 29Dip Belt Conveyor. Jul 9, 2016 146
Removal of silt of the drain along the conveyor-16/ stacker no-01 in CHP area at RTPS. Jul 9, 2016 123
supply of the following stores/ spares/ Equipment: Flat Endless (Green Colour) Conveyor Belt for Cutting Waste. Jul 9, 2016 113
Work of reject belt jointing & conveyor pulley lagging of coal mill reject handling system for Unit No.-1 to 4 at Khaperkheda. Jul 9, 2016 115
Work of repairing of Longitudinal through cut of 1400 MM & 1800MM wide conveyor belt by hot vulcanizing process in chp , koradi. Jul 9, 2016 133
Procurement of scrapper blades for chp conveyors. Jul 9, 2016 111
Towards replacement of damaged base structure and repairing of walkway of conveyor 2c at amlohri chp phase-i at amlohri project. Jul 9, 2016 140
Repair/ Replacement Of Conveyor Belts, Pulley Lagging, Renewal Of Joints By Hot/Cold Vulcanizing. Jul 9, 2016 172
Supply of new purlin structures and Roof sheets in the conveyors BCN 52 from JNT 60 to near SCH II tower. Jul 9, 2016 138
Supply and Erection of MS Deck Sheets for Conveyor BCN 42 A 42 B As per drawing. Jul 9, 2016 134
Procurement of bearings for crushers,conveyors and spreaders of oc2 rg3. Jul 9, 2016 130
Procurement of gratings for silo r/feeders plotforms and tippper trolley conveyor walkways and gantries at chp ocm-1, rg.3. Jul 9, 2016 120
Procurement of vulkollanstrip 20x160x858-95sh for conveyors at oc-2, rg-3. Jul 9, 2016 128
Supply of skirt rubbers for conveyor system of 2x500mw,btps,anpara. Jul 9, 2016 103
United States : Carbonxt and United Conveyor Corporation announce contract with Midwest Utility. Jul 9, 2016 162
Upkeepment cleaning of 301 belt conveyor tail end area and belt cinveyor 301 up to 110mtrs alog the belt. Jul 8, 2016 128
Supply Of Spares For Conveyor System. Jul 8, 2016 111
Work of replacement of worn out mother plates of transfer chutes of conveyor system in chp-i, tps khaperkheda. Jul 8, 2016 133
Hydraulic cylinder 320 / 160 - 1000 mm with manifold block with valves for 2000 mm conveyor tripper machine 182 / 183 as per drawing no. gm/con/mii/30/16. Jul 8, 2016 128
Dismantling old strucutre, fabrication and erection of rbc -3b and rbc- 4b conveyor structure at suphala bagging plant. Jul 8, 2016 136
Cleaning Of Tail End Points Of Belt Conveyors Of C2 And C6 Belts In Underground. Jul 8, 2016 137
Cleaning Of Spilled Fallen Coal Below Trunk Gate Belt Conveyors Of Sdl Section In Seam A. Jul 8, 2016 137
Supply and Erection of MS Deck Sheets for Conveyor BCN 42 A 42 B As per drawing. Jul 8, 2016 104
Supply of new purlin structures and Roof sheets in the conveyors BCN-52 from JNT 60 to near SCH II tower. Jul 8, 2016 125
Supply Of Various Sizes Of Plummer Blocks For Conveyors And Reversible Belt Feeders As Per Is : 14347 : 1996 - 4 Items. Jul 8, 2016 132
Supply Of Various Sizes Of Plummer Blocks For Conveyors And Reversible Belt Feeders As Per Is : 14347 : 1996 - 4 Items. Jul 8, 2016 154
Towards electrical work of vvip guest house hospital towards repair maintenance of light fittings at rly siding repairin rewinding of electric motor of different rating towards rubber lagging of 60 of conveyors drums cleaning of spillage coal pieces parti. Jul 8, 2016 161
Restore drives conveyor belt system ash. Jul 8, 2016 351
Carbonxt and United Conveyor Corporation Announce Contract with Midwest Utility. Jul 7, 2016 568
Paju city facilities management corporation microscopic contaminants transport conveyor installation work. Jul 7, 2016 110
Removing upkeapment of materials of unit no. 11 and 12 21 and 22 of unit 902 belt conveyor at ps 9 building of mcw. Jul 7, 2016 133
Supply of riveted type chain for conveyor at pithampur lpg plant. Jul 7, 2016 107
Installation of new belt conveyor of length 400 meter, 1000mm width, 110kw drive at 12l 6d in rvi seam. Jul 7, 2016 131
Supply Of Soft Soap For Lubrication Of Chain Conveyors In Lpg Bottling Plants. Jul 7, 2016 162
Maintenance of conveyor belt in chp st iii. Jul 7, 2016 115
Backward horizontal shifting of conveyor c-33 at (+ 15 mtr. level with simultaneous shortening of conveyor cd at ground level in as. Jul 7, 2016 127
Take up pulleys for conveyors. Jul 7, 2016 105
MTPS-I CHP.I Carrying out fabrication and cold vulcanizing of joint & patch vulcanizing in 1400mm, 1600mm, 1800mm and 2000 mm. Jul 7, 2016 153
Procurement of conveyor drums for chp ocm1 rg3. Jul 7, 2016 124
Removal of material from unit ,belt conveyor deck gallery and ground floor of bunker at mcw. Jul 5, 2016 143
Fitting and fixing of support guard both side of unit 301 belt conveyor. Jul 5, 2016 136
Sand conveyor to drg no. tpl-0344 (11420170) alt-z. Jul 5, 2016 112
Cleaning of carbonaceous materials mixed with shale, debris and stone surrounding 32level belt conveyor. Jul 5, 2016 154
Fabricated two wheel bogie with bush for 2000 mm conveyor tripper. Jul 5, 2016 111
Towards dismantling, fabrication and erection of base structure of conveyor 3c1 and 3c2 at amlohri chp, phase-i at amlohri project. Jul 5, 2016 140
Spares for aphmel make 1200mm belt conveyor gear box. Jul 5, 2016 129
Heightening of gallery for installation of belt conveyor and making of loading point of 4 east panel (41 l eastof shiwani u.G. mine under bhatgaon area. Jul 5, 2016 155
MTPS - CHP.I - Assistance for carrying out cold vulcanizing of belt joint in various width Conveyors / Belt Feeders / Dribble conveyors. Jul 5, 2016 149
MTPS-I - CHP-II - M-II Sub Division - Breakdown work/ preventive maintenance Assistance for carrying out cold vulcanizing belt joint. Jul 5, 2016 162
NCTPS- 1 M.II ECHS Reconditioning of non-drive pulley for steel cord belt conveyor released from conveyor 41B. Jul 5, 2016 117
Supply and Erection of Coal Retainer Plates of Size 2370 X 1100mm (SS 304 Gr. 3mm Thick) for Conveyor 66 from Head End in Coal Jetty-II. Jul 5, 2016 191
Renovation of crossover platform in the conveyor BCN 40AB near shore unloader 1 at Coal berth area. Jul 5, 2016 121
TTPS Remedial measures to RCC / PSC structures of coal jetty I conveyor system from JT- 3E building towards West long span 14 - 18. Jul 5, 2016 143
Dismantling and Erection of tail pulley frame short supports and MS Deck sheets for conveyors 4A 4B 5A and 5B. Jul 5, 2016 119
Erection of safety guards with holding hooks in the shore conveyors BCN 40A and 40B at CB 1 and CB 2. Jul 5, 2016 133
Disposal of Obsolete Non Moving and Scrap materials Conveyor Belts. Jul 5, 2016 193
Bomag electrostatic system eliminates milling dust. Jul 5, 2016 249
Cold vulcanizing of p n belt joint, rubber lagging of conveyor drum an patch repair. Jul 4, 2016 154
Supply of belt-tracking system for 1600 MM wide conveyor system in CHP-I at Khaperkheda TPS. Jul 4, 2016 115
Work of replacement of worn out mother plates of transfer chutes of conveyor system in CHP-I. Jul 4, 2016 116
20 items of conveyor spares. Jul 4, 2016 105
Supply of spares for rampur make belt conveyor drive head 1x55kw. Jul 4, 2016 136
Regular Cleaning Of B-3 To B-4 Belt Conveyor And Associated Feeder Breaker And Secondary Crusher For 365 Days, At Dipka Expansion Project. Jul 4, 2016 148
Cleaning Of Loading Points Of Belt Conveyors In Panel No 4J 1 Depillaring District -62Ln Dev.Of 4A At Jhiria Ug Mine. Jul 4, 2016 143
Conversion Of 1000Mm Belt Conveyor Structure Of C-2 Belt Into 1200Mm Belt Conveyor Structure At Chp, Raj Ocm, Hasdeo Area. Jul 4, 2016 157
Cleaning Of Spilled Fallen Coal Below Belt Conveyor From 1Dip E Bunker To Cm Panel In Seam C At Kurja Ug Mine. Jul 4, 2016 143
Fabrication, Supply and Erection of 20 Degree and 35 Degree Impact Idler Frames in various Conveyors of PCH-I. Jul 4, 2016 120
Conveyor Maintenance-Replacement of the existing damaged ACC sheet, FRP sheet by Lexan Polycarbonate sheet and ACC Ridge. Jul 4, 2016 129
Renovation of corroded damaged MS Supporting structures and MS Deck sheets stinger channels and sealing plates of conveyor. Jul 4, 2016 135
Renewal of existing corroded damaged fire fighting pipe lines in conveyor gallery from SCH II to JNT 52 of BCN 43 AB. Jul 4, 2016 126
Renovation of existing severally Corroded Damaged of MS structures and M.S Deck sheets of Trunk Conveyor BCN 59. Jul 4, 2016 131
TTPS Strengthening and protecting the Structures of Coal jetty II Conveyor system from approach bridge to CHS 7 & 8, JT 1AE. Jul 4, 2016 138
TTPS Strengthening and protecting the Structures of Coal jetty II Conveyor system from Junction Tower 26, CHS 9 building. Jul 4, 2016 136
TTPS Strengthening and protecting the Structures of Coal jetty II Conveyor system from Junction Tower 21,23,24. Jul 4, 2016 135
TTPS Strengthening and protecting the Structures of Coal jetty II Conveyor system from Conveyor 68 approach bridge & JT 25. Jul 4, 2016 139
Fabrication, Supply and Erection of Roof Elements Structures for Conveyor 69 Head End (Northern Side). Jul 4, 2016 185
Replacement of the existing damaged ACC sheet FRP sheet and ACC Ridge with new one in conveyor 4A 4B and 5A 5B roof side galleries. Jul 4, 2016 153
Fabrication, Supply and Erection of Roof Elements Structures for Conveyor 69 Head End (Northern Side). Jul 4, 2016 120
Collection Of Iron And Steel Materials, Gear Box, Motor, Conveyor Pulley Etc. Jul 3, 2016 164
Replacement of bed pulley, belt piece, damaged joint, bearing, gear box of conveyor c-18/19 and skirt plate of plough feeder no. 17/2 at rajmahal chp. Jul 3, 2016 146
Supply of various size conveyor rollers for chp at wtps. Jul 3, 2016 167
Supply of F.R. Grade Conveyor Belts for various Power Stations. Jul 3, 2016 114
Provision of Queue Conveyors. Jul 3, 2016 103
United States : Development of ULTAGE Spherical Roller Bearing with Compact Seal for Mining Transport Conveyors. Jul 2, 2016 324
(me/16/1001)smart vision camera for communicating with an industrial plc to carry out workpiece inspection on a single axis conveyor system. Jul 2, 2016 133
Conveyor belts. Jul 2, 2016 168
Installation of new belt conveyor of length 400 meter- 1000mm width- 110kw drive at 12l-6d in r-vi seam. Jul 2, 2016 165
Supply of f.R. grade conveyor belts for various power stations of gsecl for year 2015-16. Jul 2, 2016 202
Contract for providing of services for conveyor belt jointing & patching by cold jointing & hot vulcanizing process & Pulley lagging in CHPD at CSTPS, Chandrapur. Jul 2, 2016 143
Work of overhauling, shifting, replacement & alignment of gear boxes of various conveyors at CHP,2x210MW, BTPS, Deepnagar. Jul 2, 2016 131
Conveyor spares - 2 items. Jul 2, 2016 104
2000mm conveyor transfer feeder with extension hopper, spillage guard , lifting hooks and decking plates. Jul 2, 2016 114
4 items of conveyor spares. Jul 2, 2016 105
Three items of conveyor spares. Jul 2, 2016 105
(1 stress frames for 2000mm conveyor system (2 stringer channel for standard shiftable frames. Jul 2, 2016 114
Dismantling, fabrication, erection and commissioning of conveyor system of et- 8 and et-11 conveyor in urea bagging plant. Jul 2, 2016 135
Procurement of conveyor belts. Jul 2, 2016 142
Supply of new purlin structures and Roof sheets for the conveyors BCN 46A B. Jul 2, 2016 113
MTPS-II - Supply of Band elements for DRYCON conveyor in bottom ash handling system - 2 Items. * Technical specification and drawings fur. Jul 2, 2016 132
Supply of new purlin structures and Roof sheets for the conveyors BCN 46A B. Jul 2, 2016 131
MTPS-II-Supply of band elements for DRYCON conveyor in bottom ash handling system - 2 Items. Jul 2, 2016 302
Ray nixon power plant bc 4a reclaim conveyor belt replacement. Jul 2, 2016 153
Cleaning of carbonaceous materials mixed with shale, debris and stone surrounding west side of 29dip belt conveyor in rvi bonbahal seam of khottadih colliery, pandaveswar area. Jul 1, 2016 159
Cleaning of carbonaceous materials mixed with shale, debris and stone surrounding west side of 29dip belt conveyor in rvi bonbahal seam of khottadih colliery, pandaveswar area. Jul 1, 2016 158
Foundation work related to installation of conveyor belt along 5 dip from 6 pit shaft level. Jul 1, 2016 175
Round the clock maintenance of conveyor system in chp for belt joint work. Jul 1, 2016 118
Procurement of fabrication and supply of submerged scraper conveyor flight. Jul 1, 2016 110
Spares For New Allenberry Make Gear Box 800 And 1000 For Pony Conveyors. Jul 1, 2016 148
Malma Cleaning Removal Of Fallen Spillage Coal Debries Below The Belt Conveyor Tb-1 From Surface To 15 L In U.G. 0 L South From 1 Dip To -18 Dip -9 Rise Belt From 0 L To -25 L In Upp Seam At Mahamaya U.G. Jul 1, 2016 171
Three Years Empanelment Rc For Mechanical Maintenance Of Belt Conveyors. Jul 1, 2016 187
Proposal for the work of vulcanizing joints of conveyor belts of preparation plant at bhojudih coal washery. Jun 30, 2016 144
Proposal for the work of vulcanizing joints of conveyor belts of rom section at bhojudih coal washery. Jun 30, 2016 144
Proposal for the work of lagging of different conveyor drums by cold vulcanizing process of rom section at bhojudih coal washery. Jun 30, 2016 148
Design, Supply, Renovation. Commissioning And Testing Of Existing Rls Along With Associated Conveyor System With Extended Warranty Of Three Years After Initial Guaranteed/Warranty Of One Year With Spares And Consumables And Maintenance Contract. Jun 30, 2016 163
Supply Of Chip Conveyor 2 Items At Beml, Kgf Complex. Jun 30, 2016 114
Manufacture, supply erection, testing and commissioning of Metal Detectors required for conveyor 12A/B at CHP-1. Jun 30, 2016 118
Hot And Cold Vulcanizing And Pulley Lagging Of Conveyor Belts At Rmhs And Stock House Area Of Blast Furnace Unit Kiocl Limited Panambur Mangaluru. Jun 30, 2016 136
Enquiry for oil filling/checking all various conveyors of gear boxes, fluid coupling, pulley related various auxiliaries of chp ii at stps sarni. Jun 30, 2016 105
Amc/day to day repairing works of feeder breakers and belt conveyors of 06 nos chp installed at lingaraj ocp for a period of one year , as and when required at lingaraj area. Jun 30, 2016 139
Cleaning Of Spilled Fallen Coal Below Gate Belt Conveyors Of Lhd Section In Seam C At Kapildhara Ug Mine Of Hasdeo Area. Jun 30, 2016 154
Periodical Shortening Of Conveyor Structures,Pvc Belting,Haulage Tracks And Pipelines In Sdl Panel In Seam A At Kapildhara Ug Mine Of Hasdeo Area. Jun 30, 2016 156
Removal of soil/ash/coal dust/scrap/ berry trees/garbage/wild. Jun 30, 2016 146
Go YO! for pick and mix feast; YO! SUSHI 141 GRAINGER STREET NEWCASTLE 0191 338 5052 YOSUSHI.COM OPENING TIMES 11AM-10PM BY ANGLEA UPEX. Restaurant review Jun 29, 2016 776
Design fabrication installation and commissioning of mobile motorized belt conveyor. Jun 29, 2016 110
Proposal for the work of preventive maintenance and repair of tail drum unit structure of conveyor rc 6e at bhojudih coal washery. Jun 29, 2016 147
Proposal for the work of dismantling, fabrication, repairing and re-erection of chute from feeder no.1 and 2 to conveyor a and from c to rom-2 at bhojudih coal washery. Jun 29, 2016 157
Proposal for the work of preventive maintenance and repair or overhauling of gear box u-1400 and its structure base of cc-4e belt conveyor at bhojudih coal washery. Jun 29, 2016 154
Proposal for the work of preventive maintenance and repair of tail drum unit structure of conveyor. Jun 29, 2016 154
Supply of fire resistant grade rubber conveyor belting, nylon/nylon. Jun 29, 2016 131
10 items of conveyor spares. Jun 29, 2016 105
Tender documents for procurement of steel cord conveyor belts for bacheli kirandul complexes of nmdc limited. Jun 29, 2016 129
Procurement of nylon conveyor belts for kirandul and donimalai projects of nmdc limited through e-tender and reverse auction. Jun 29, 2016 131
Installation Of 01 No Trunk Belt Extension Of 01 No Gate Belt And 02 Nos Drive Head Including 05 Nos Pony Belt Conveyor. Jun 29, 2016 176
Procurement of conveyor drive duplex chain for feeder breakers at ocp3 chp rg2. Jun 29, 2016 125
Delivery of the technological line pre-shredding cables. Jun 29, 2016 224
Parts of conveyors. Jun 29, 2016 164
Design Fabrication Installation And Commissioning Of Mobile Motorized Belt Conveyor. Jun 28, 2016 110
Procurement of bag shifting conveyors for supply depot asc, mhow. Jun 28, 2016 131
Gear coupling for conveyor system of chp. Jun 28, 2016 110
Conveyor pulleys, spares for vgf. Jun 28, 2016 108
Making hot vulcanising joints 1000 to 2400mm steel cord/fabric belts in conveyors of mine-1 and its allied works. Jun 28, 2016 156
Replacement of old damaged 1400 mm n/n belting of conveyor 3c by new 1400mm. Jun 28, 2016 140
Fabrication of bottom belt conveyor rollers. Jun 28, 2016 143
Fabrication of bottom belt conveyor rollers to be used in ug mines of bishrampur area. Jun 28, 2016 127
Ensuring Smooth Running Of Sinter Plant, By Assisting Operational People, Working In Shifts, In Freeing (De-Jamming) Of All The Chutes And Conveyors Of Every Section Of Sintering Plant 3, Which Develop A Tendency Of Getting Jammed Frequently, With Sticky,. Jun 28, 2016 232
Removal Of Reels From Raumaster Conveyor. Jun 28, 2016 126
MTPS-I-CHP-II- Carrying out cold vulcanizing of 1400mm & 1800mm width conveyor belt and patch vulcanizing of various conveyor belt. Jun 28, 2016 143
Design supply Erection Testing and Commissioning of 2 nos. Electrically operated hoist of capacity 20MT for lifting the counter weight of single stream conveyor BCN 52. Jun 28, 2016 143
Contract For Fabrication And Fixing Of Scraper Chutes On Silo A And B Conveyors At Chp Ocm-1 Rg.3. Jun 28, 2016 144
Longitudinal jointing of conveyor belts. Jun 28, 2016 103
Renewal Of Automation And Computer System Control Overhead Conveyors Of The Laundry Of The Centre Hospitalier De Niort. Jun 27, 2016 125
Amc/day to day repairing works of feeder breakers and belt conveyors of 06 nos chp installed at lingaraj ocp for a period of one year , as and when required at lingaraj area. Jun 27, 2016 166
Automatic wiper cum dust collector for 1200mm belt conveyor. Jun 27, 2016 129
Spares for vishwa make 1x55kw belt conveyor. Jun 27, 2016 122
Spares for vishwa make 1x37kw belt conveyor. Jun 27, 2016 122
Supply of spares for vishwa make 1000 mm belt conveyor. Jun 27, 2016 125
Erection and commissioning of conveyors, rc feeders and plough feeders at goleti chp bpa, bellampalli area. Jun 26, 2016 146
Red cross clinic lindenberg - technical equipment elt and conveyors. Jun 25, 2016 520
New installation and commissioning of 800mm wide 125 mtr. long viswa make pony belt conveyor at 47 l/ 23 d in 2 no. pit at shyamsundarpur colliery under bankola area. Jun 25, 2016 148
Installation and commissioning of 1000mm wide 630 mtr. long belt conveyor at 16 l tendum at shyamsundarpur colliery under bankola area. Jun 25, 2016 141
Installation and commissioning of 1200mm wide x 756 mtr. long gate belt conveyor at c.M district at panel-15 (20 l) at shyamsundarpur colliery under bankola area. Jun 25, 2016 152
Installation and commissioning of 1200mm wide x 792 mtr. long gate belt conveyor at panel- 16 of c.M district at 16 l/32 rise at shyamsundarpur colliery under bankola area. Jun 25, 2016 156
Installation & Commissioning Of 1200Mm Wide X 180 Mtr. Long Belt Conveyor From 24 L To 19 L / 32 Rise Of C.M District At Shyamsundarpur Colliery Under Bankola Area. Jun 25, 2016 136
Installation & Commissioning Of 1200Mm Wide X 756 Mtr. Long Gate Belt Conveyor At C.M District At Panel-15 (20 L) At Shyamsundarpur Colliery Under Bankola Area. Jun 25, 2016 134
Installation & Commissioning Of 1200Mm Wide X 792 Mtr. Long Gate Belt Conveyor At Panel- 16 Of C.M District At 16 L/32 Rise At Shyamsundarpur Colliery Under Bankola Area. Jun 25, 2016 138
Installation & Commissioning Of 800Mm Wide X 172 Mtr. Long Tendum Belt Conveyor At 4 L West / 18 Dip To 4 L West / Near 25 Dip Of Millennium Incline Of Shankarpur Colliery Under Bankola Area. Jun 25, 2016 141
Installation and commissioning of 1200mm wide x 200 mtr. belt conveyor at 16 l lhd section belt at shyamsundarpur colliery under bankola area. Jun 25, 2016 141
Installation and commissioning of 800mm wide x 250mtr. long belt conveyor at 4r tendum-11 l at lhd district of shyamsundarpur colliery under bankola area. Jun 25, 2016 144
Installation and commissioning of 1200mm wide 180 mtr. long belt conveyor from 24 l to 19 l 32 rise of c.M district at shyamsundarpur colliery under bankola area. Jun 25, 2016 149
Installation and commissioning of 800mm wide x 172 mtr. long tendum belt conveyor at 4 l west / 18 dip to 4 l west / near 25 dip of millennium incline of shankarpur colliery under bankola area. Jun 25, 2016 160
Installation and commissioning of 1200mm wide and 130 mtr. length belt conveyor at 32l belt of shyamsundarpur colliery under bankola area. Jun 25, 2016 139
Installation and commissioning of 1000mm wide belt conveyor, 220 mtr. length at 3 l , 13 r at shyamsundarpur colliery under bankola area. Jun 25, 2016 147
Installation and commissioning of 1000mm wide belt conveyor 220 mtr. length at 4th r tendem of shyamsundarpur colliery under bankola area. Jun 25, 2016 146
Installation and commissioning of 1200mm wide x 756 mtr. Long gate belt conveyor at c.m district at panel-15 (20 l) at shyamsundarpur colliery under bankola area. Jun 25, 2016 165
Installation and commissioning of 1200mm wide x 792 mtr. Long gate belt conveyor. Jun 25, 2016 168
Installation and commissioning of 800mm wide x 250mtr. Long belt conveyor at 4r tendum-11 l at lhd district of shyamsundarpur colliery under bankola area. Jun 25, 2016 161
Installation and commissioning of 1000mm wide x 630 mtr. Long belt conveyor at 16 l tendum at shyamsundarpur colliery under bankola area. Jun 25, 2016 159
Installation and commissioning of 1200mm wide x 180 mtr. Long belt conveyor. Jun 25, 2016 174
Installation and commissioning of 1200mm wide x 200 mtr. Belt conveyor at 16 l lhd section belt at shyamsundarpur colliery under bankola area. Jun 25, 2016 167
6 items of conveyor spares. Jun 25, 2016 105
Fabricated deck plates for conveyors 2, 4a & 4b as per drawing dgm/lhs/tps-ii/008/2014. Jun 25, 2016 116
Complete installation and extension alternate gallery of 26d, 28d, 30d, 32d, 34d, 36d, 38d and 40d pony belt conveyor over 58lw belt conveyor in 58lw development district of gayatri ug mine. Jun 25, 2016 162
MTPS-I CHP.I Replacement of existing 418 KW HT motor in conveyor 7B, 260 KW HT motor in conveyor 8B1. Jun 25, 2016 141
Supply Of Lt Squirrel Cage Induction Motors For Conveyors For The Project Of Augmentation Of Fuel And Flux Crushing Facilities (Package No. 064) Of Bhilai Steel Plant (Sail) As Per Specification Of Ni. Jun 25, 2016 164
Installation and commissioning of 1000mm wide new conveyor structure at tb-1 belt conveyor millennium incline (approx length- 425 mtr.) of shankarpur colliery under bankola area. Jun 24, 2016 145
Installation of 800mm wide 40 mtr. long belt conveyor at along 11rise 15 to 16 level at no. 2 pit of shyamsundarpur colliery under bankola area. Jun 24, 2016 144

Terms of use | Copyright © 2016 Farlex, Inc. | Feedback | For webmasters