Printer Friendly

Browse Conveyors topic

 

Articles

1-300 out of 600 article(s) nextnext page
Title Author Type Date Words
Procurement of T scrapers for Maintenance of Conveyors working. Mar 29, 2015 125
Elevators and conveyors. Mar 28, 2015 148
Renovation house of parliament of baden-wuerttemberg and new civic and media center, conveyors. Mar 28, 2015 186
Supply of steel wire rope for 26, 27a/b, 28a/b conveyors and 29a & 30a/b bunker electric hoists conveyors of chp/stage-iv(1x500 mw). Mar 28, 2015 139
Gear pump, model : azpw21022rqrxxmbs0593. Mar 28, 2015 537
Supply of Gear Box For Scrapper Conveyor. Mar 28, 2015 113
Supply of conveyor monitoring system for our downhill tunnel conveyor of biom bacheli complex. Mar 28, 2015 149
supply of impact,idler and return rollers for conveyors in chp area. Mar 28, 2015 134
Supply of conveyor belts at katpp rvunl jhalawar. Mar 28, 2015 131
Repairing minor structural steel work of feeder breaker and connected belt conveyor. Mar 28, 2015 155
Transportation and laying of belt conveyors. Mar 28, 2015 135
331500148 delivery mechanical fasteners for conveyor belts for kw sa branches in 2015. Mar 28, 2015 169
Supply of Top Bracket for 1400mm Width Belt Conveyor. Mar 27, 2015 126
Supply of top bracket for 1400mm width belt conveyor. Mar 27, 2015 129
Supply of 2000mm conveyor take up pulley to suit to 23156k bearing with out rubber lagging of size 800mm diax2200mm long. Mar 27, 2015 128
Barrel for side troughing idler of 2000mm conveyor. Mar 27, 2015 145
Elevators and conveyors. Mar 26, 2015 266
Supply and installation of 1 dishwasher with conveyor; vorreingungsbecken / soaking; disposal of a tape machine system with conveyor belts and 1 granules dishwasher. Mar 26, 2015 197
Supply and errection of conveyor sytem. Mar 26, 2015 107
Idlers for belt conveyor. Mar 26, 2015 119
Assistance for routine mechanical maintenance of various auxiliaries and Conveyor 6A and B to bunker house of CHP II, STPS, MPPGCL, Sarni . Mar 25, 2015 140
O.T.E.:wooden conveyor belt for x-201 in building no 602 nc plant as per attached drg no. ofi/96/nc/70 r1, sheet no. 1/2 & 2/2. (material will be accepted after 15 days trial in ac. Mar 25, 2015 256
Installation of 1000 mm belt conveyor with drive head in 43ln gallery. Mar 25, 2015 299
Work of operation of sump pump at c5c6 conveyor tail end below 30000. Mar 25, 2015 131
Supply of Hitting Plate Assembly Suitable for 1800mm Belt Width for CHP and ACHS Conveyors .(As per Specification and Drawing) Quantity & Te. Mar 25, 2015 121
Supply of Spares for 68 Lit per Min 350 Bar hydraulic power pack for submerged scraper chain conveyor. Mar 25, 2015 388
Supply of Hitting Plate Assembly Suitable for 1800mm Belt Width for CHP and ACHS Conveyors As per Specification and Drawing Quantity Technical Specification As per Annex,. Mar 25, 2015 135
Repairing Hot Vulcanising And Cold Jointing Of Conveyor Belts Installed. Mar 25, 2015 136
Rebuilding of existing Optibag sorting household waste. The delivery includes mounting including new branch, new conveyors and reconstruction of existing transport band. The delivery also includes sof. Mar 25, 2015 133
Supply of Endless pu conveyor belt. Mar 25, 2015 253
Endless pu conveyor belt. Mar 25, 2015 119
Scrapper conveyor feeder Renewal of wornout bottom, slope plate and its support channels, water. Mar 24, 2015 120
Stone picking from conveyors 40A 40B 41A 41B 42A/B and 52 segregation loading. Mar 24, 2015 123
Conveyors. Mar 24, 2015 123
Longitudinal cut patch repair of different belt conveyors or preparation of 100 mm to 1500mm conveyor belt from old serviceable belt by longitudinal vulcanizing at moonidih coal washery. Mar 23, 2015 161
Procurement of Flight Chain Conveyor. Mar 23, 2015 154
Repairing of inline magnetic separator of conveyor 5b. ref.Fs:43:cs:1420/78 (pr 200053654). Mar 23, 2015 139
Procurement of scrapper assembly for conveyor belt. Mar 23, 2015 128
Hytrol Conveyor Integration Partner Curlin Report Dependable Local Service and Solid Products Winning Formula. Mar 22, 2015 384
Procurement of steel cord splicing material sets for 1500mm/1600 mm, 1800mm / 2000mm and 2400mm, solution. Mar 22, 2015 450
Notification 103 / 226 from 20.03.2015 "Perform repair: 1. Downhill conveyor chain is part of the conveyor systems, including inventory control device. 700720420 Tseh_41 axis F2 -D / 151-166. 2. pendu. Mar 22, 2015 107
AKP: a conveyor belt for radicalism? Mar 21, 2015 725
Forty Plus Year Partnership Between Hytrol Conveyor and RH Brown Serves West Coast Material Handling Customers. Mar 21, 2015 442
Design of vertical screw conveyor. Mar 21, 2015 114
Procurement of carrying side idlers for conveyor belt. Mar 21, 2015 129
Procurement of gear coupling for use in conveyors. Mar 21, 2015 144
Amc for services for trunk and overland conveyors working. Mar 21, 2015 123
Procurement of spares for trunk and overland conveyors working at alp. Mar 21, 2015 123
Upkeep Of Sinter Machine, Sinter Breaker, Sinter Cooler, Mixing & Nodulizing Drum, Double Roll Crushers And Sinter Screens And Repair/Replacement Of Chain Conveyors. Mar 21, 2015 183
Attending preventive maintenance works in Conveyor-17. Mar 21, 2015 113
Attending preventive breakdown maintenance works in all conveyors to SCH-II. Mar 21, 2015 118
Attending preventive breakdown maintenance works in various conveyors and equipments related to PCH-II. Mar 21, 2015 117
Procurement of L Type Modular Plastic Conveyor. Mar 20, 2015 108
Job contract for maintenance of conveyor belt and pulley lagging in chp stage ii , iii , and iv at ntpc vindhyachal. Mar 20, 2015 141
Encasing of steel columns of a-1 conveyor alp at stock pile area adriyala projects area. Mar 20, 2015 133
1)extension/ installation of belt conveyor, drive head and tail end in development panels of vi bottom seam at damini ug mine, period one year. Mar 20, 2015 134
3)extension/ installation of belt conveyor drive head and tail end track line in proposed development panel of v seam at damini ug mine, period one year. Mar 20, 2015 136
Closed gwangeup industrial water treatment plant construction materials (conveyor) purchase installation. Mar 20, 2015 104
Armoured-faced conveyors (afcs) for mining. Mar 20, 2015 320
Steel belt conveyor system 375 mm ct 20, m/c. no.- 09/1114/01 as per pdf. attached. Mar 20, 2015 212
Supply of automatic wiper cum dust collector for 1200 mm conveyor belt. Mar 20, 2015 136
Procurement of conveyor pulley non drive for nigahi chp. Mar 20, 2015 130
Supply Of Control System 1 Hp Capacity Reversible, Wheeled, 2 M Long Linear Chain Conveyor. Mar 19, 2015 209
Supply of 800 Mm Conveyor Belt(Heavy Duty). Mar 19, 2015 111
Supply of Pulley Lagging Material and Providing Expert Services for Rubber Lagging to Non-Drive Pulleys of Conveyors at Coal Handing Plant. Mar 19, 2015 142
Replacement of different sizes of damaged rubber liners and fixing of new liners in discharge chute of conveyor 8c and 18c of nigahi chp. Mar 19, 2015 151
Replacement of different sizes of damaged rubber liners and fixing of new liners in discharge chute of conveyor 8C 18C of Nigahi CHP. Mar 19, 2015 116
Supply of By pass chute assembly for Scrapper conveyor feeder 4A2. Mar 19, 2015 123
Upkeepment and clearing of spillage coal on various areas of Conveyor-48A1/B1. Mar 19, 2015 113
Attending preventive electrical maintenance wrks in Conveyor-48A/B, RBFD-1A/1B. Mar 19, 2015 120
Cleaning of spillage coal/shale below the belt conveyor along both side of conveyor belt. Mar 19, 2015 126
Structural improvement and expansion of the kjp - conveyors. Mar 18, 2015 167
Design manufacture and supply of drum entry conveyor. Mar 18, 2015 120
Replacement of wornout/damaged base structure of track of shuttle conveyor u-122. Mar 18, 2015 146
Dismantling, fabrication and erection of 3 nos. loop take-up trolley in conveyor c-5, 4.1 and 4.2 of reclaim section of chp, dudhichua project. Mar 18, 2015 152
Maintenance of belt conveyor 201,402 and 301 b at moonidih coal washery. Mar 18, 2015 141
Processing of Pre-production drilling/blast hole/collection of ROM samples from acceleration conveyor. Mar 18, 2015 107
Procurement of spares for scrapper conveyor and clinker grinder. Mar 18, 2015 130
Purchase of inside roller, inside roller shaft, bracket for inside roller shaft & attachment flange unit with studs for slag conveyor. Mar 18, 2015 130
Purchase of dust seal inner for troughing and return idlers of 2000/1800mm conveyors. Mar 18, 2015 123
Purchase of slag bath rollers & wheel shaft for slag conveyor (2.Items ). Mar 18, 2015 120
Transportation installation of 08 nos pony belt conveyors 800 mm size for 66 m. Length structure of each pony belt. Mar 18, 2015 323
Supply & erection of various sizes of seal plates for 1600 mm width belt conveyor system 7A & 7B- 2 items. Mar 18, 2015 127
Supply, erection of various sizes of seal plates for 1600 mm width belt conveyor system 7A 7B 2 items. Mar 18, 2015 130
Supply of jsw sa mining components for heavy-duty conveyors with maturity of 12 months from the date of the agreement. Mar 18, 2015 181
Rate contract for conveyor belt maintenance and insulation works in carbon area mechanical. Mar 17, 2015 141
Biennial Contract For Valcanizing And Pulley Lagging Of Conveyor System. Mar 17, 2015 109
1000-2000mm conveyors and sme vulcanising and allied works. Mar 17, 2015 133
Removal, fabrication, erection and commissioning of conveyor and head pulley structure of et- 1 conveyor in urea bagging plant. Mar 17, 2015 135
Dismantling, fabrication and erection of bottom structure of conveyor gantries of b and mh plant of rcf, trombay. Mar 17, 2015 135
Repairing of 1000mm top and bottom belt conveyor rollers with roller Kit and new shaft at Colliery site of Chrucha Mine RO. Mar 17, 2015 118
Repairing of 1000mm top belt conveyor rollers with bearing-420205 rollers kit and new shaft. Mar 17, 2015 119
Cleaning of spillage coal from conveyor belt at Govinda Siding under KGSA of Jamuna Kotma Area. Mar 17, 2015 122
Conveyor belting 1400mm width Nylon / Nylon,1250 KN/m strength 5 ply, GD, 5/3, moulded edge construction and FR G. Mar 17, 2015 127
Supply, erection, testing and commissioning of 3 Tonne capacity electrical hoist with panels and control cables at entrance of conveyor 6A/6. Mar 17, 2015 153
Supply Of 600mm Width Conveyor Belt. Mar 16, 2015 108
Supply of conveyor belt. Mar 16, 2015 156
Conveyor belting 1400mm width Nylon-Nylon. 1250 KN/m strength. 5 ply general duty. Mar 16, 2015 102
580 Years of Service Celebrated at Hytrol Conveyor Company Inc.. Mar 15, 2015 462
(1)cleaning & removal of day to day spillage coal/ muck etc. From main trunk belt conveyor tb-1, tb-2, tb-3 & tb-4 along r-3 dip gallery from 54 l (ug) to surface at rajendra ug mine, qty.14,300 cu.m. Mar 15, 2015 146
1)transportation, installation / extension & commissioning of belt conveyors. Mar 15, 2015 134
1)cleaning of muck below and beside u/g belt conveyor. Mar 15, 2015 134
3)transportation, installation / extension & commissioning of belt conveyors. Mar 15, 2015 134
Cement concrete flooring for protection of conveyor p1 q1 r1 of new chp at dipka expn project of dipka area. Mar 15, 2015 137
Continuous monitoring and attending interruptions in crushers and conveyor operations at PCH-II and SCH-II. Mar 15, 2015 115
Attending preventive electrical maintenance works in HT Breakers, LT modules in Conveyor-65-71. Mar 15, 2015 118
Attending preventive and breakdown maintenance of 15 Nos. electrical hoists in Conveyor-65 to 71 at CHs-VII. Mar 15, 2015 118
Maintenance and. repair of conveyor technology in bonn. Mar 14, 2015 161
Providing assistance for regular maintenance works of fire hydrant pipe lines, spray pipe lines along coal conveyor belts. Mar 14, 2015 170
Procurement of conveyor pulleys. Mar 14, 2015 129
Labyrith ring ( inner & outer ) for troughing idler and return idler of 2000 / 1800 / 1500 mm conveyor as per drg no gm/mh/87/83. Mar 14, 2015 133
Design, Manufacture and Erection of Refinement Machineries comprising feeder. Mar 14, 2015 170
Design, Manufacture and Erection of Coarse Segregation Machineries comprising feeder. Mar 14, 2015 170
Supply of fr grade conveyor belt of different sizes. Mar 14, 2015 139
Routine And Breakdown Maintenance Of Conveyor System Of Chp 3X210 Mw Atps Anpara. Mar 14, 2015 130
Attending breakdown/ preventive maintenance works in Conveyor-65 to 68. Mar 13, 2015 195
Attending preventive breakdown maintenance works in Conveyor-48A/B, RBFD-1A/1B etc.,. Mar 13, 2015 196
Repairing of 04 (four) nos. Conveyor drums. Mar 13, 2015 120
Supply Parts for Conveyor Type Metal Band. Mar 13, 2015 535
Repair and maintenance services of machinery. Mar 13, 2015 148
Hytrol Conveyor Releases Important Data in New Pharmaceutical Report. Mar 13, 2015 432
Supply of garbage sorting and processing machine using conveyor belt, shredder and screw conveyor. Mar 13, 2015 104
Supply of Conveyor Belt. Mar 13, 2015 116
2 items of conveyor spares. Mar 13, 2015 114
Procurement of scraper for slag conveyor. drawing no.:15/83. Mar 13, 2015 118
Shifting and laying of conveyor belts in ammonia-i plant compressor house for keeping raw materials of sujala plant. Mar 13, 2015 134
Upkeepment and attending preventive breakdown maintenance works of Conveyors and related equipments in Conveyor-69,70,71. Mar 13, 2015 211
Upkeepment of conveyors by cleaning the spillage coal on various areas. Mar 13, 2015 203
Up-keeping of different conveyors 13 a/b,14a/b and sump pump. Mar 12, 2015 164
Fabrication and supply of automatic conveyor cocoon drying machine. Mar 12, 2015 138
Procurement of Non Drive Pulleys with ceramic tiles direct bonded on conveyor pulleys without Rubber sheet / Pad. Mar 12, 2015 140
Fixing of new roof sheets of conveyor galleries. Mar 12, 2015 135
Fixing of rubberwiper in thetransfer chute of thec conveyors of tps ii expansion. Mar 12, 2015 138
Hot vulcanising of fabric conveyor belts throughout the plant. Mar 12, 2015 111
Manual picking up of stoones, shales and other foreign materials from running conveyors. Mar 12, 2015 125
TTPS- ECHP-I- Monitoring the running equipments in PC-2 Nos., Belt Feeder-9A & 9B, Conveyor-43,46, RC-1 etc., at PCH-I. Mar 12, 2015 118
Upkeepment of conveyors and related equipments in Conveyor-19,45,47 etc.,. Mar 12, 2015 118
Attending preventive breakdown maintenance works in Conveyor-48A/B ,RBFD-1A/1B etc.,. Mar 12, 2015 130
Fabrication, Supply and Erection of 35 Degree Troughing Idler Frame for 1400mm Belt Width Conveyor 16. Mar 12, 2015 113
Supply of nylon fabric conveyor belt. Mar 11, 2015 145
Supply of idler frames for 1600 mm wide conveyor belt in chp-i. Mar 11, 2015 122
Work of replacement of vibrating screen and various allied works for belt conveyors at chp-a,cstps. Mar 11, 2015 126
Procurement of fixed link for slag conveyor chain. Mar 11, 2015 117
Purchase of conveyors spares. Mar 11, 2015 113
Installation of two nos. Conveyor belt. Mar 11, 2015 133
Supply and Strengthening Stringer Channel and Seal Plates and Replacing the deformed / Wornout Seal Plates (Top) in Conveyor RBFD 1A & 1B. Mar 11, 2015 185
Repairing of Elecon Make Chain Conveyor Gear Box at Pimpalgaon Opencast Mine, Wani North Area. Mar 11, 2015 115
Repairing Of Elecon Make Chain Conveyor Gear Box. Mar 11, 2015 142
Washing of NMOC CHP structure to avoid corrosion due to deposition of coal, muck and slurry of NMOC CHP,C-1,Pickings,Sl-1,Sl-3,C-5,C-6,C-7,C-8,393,404. Mar 11, 2015 164
Provision of conveyor belts. Mar 11, 2015 144
The contract is for the supply to the mines of jsw sa components for conveyor pat-e260 with implementation by the 31.12.2015. Mar 11, 2015 166
Finance leases with the delivery of a brand new belt conveyors for mines coal company sa in 2015. Mar 11, 2015 226
Conveyor belts. Mar 11, 2015 200
Conveyors. Mar 11, 2015 145
Finance leases with the delivery of two new longwall conveyors. Mar 11, 2015 231
Global Conveyor Belt (PVG & PVC)Market & Australia Rubber Conveyor Belt Industry Reports. Mar 10, 2015 1304
Global Conveyor Belt (PVG & PVC)Market & Australia Rubber Conveyor Belt Industry Reports. Mar 10, 2015 1298
Exceeding Customer Expectations Situates PulseRoller Above Competition. Mar 10, 2015 980
Rip-repair of conveyor belt by hot vulcanizing process in chp. Mar 10, 2015 131
Supply of conveyor belt 1400/4, fr grade, nn 5/2 for chp. Mar 10, 2015 134
Supply of conveyor belt nn 1000/5, fr 5/2 for chp. Mar 10, 2015 133
Purchase of 3 items of conveyor spares. Mar 10, 2015 116
Nylon conveyor belt 1000mm 24 grade 3 ply x 5mm top x 1.5mm bottom. Mar 10, 2015 156
Supply of Supporting Roller Assembly for DRYCON CONVEYOR 40 Sets. Mar 10, 2015 132
Rubber lagging in(tb-2) trunk belt pony belt, drive drums at conveyor drive drums. Mar 10, 2015 111
Delivery of conveyor belts to khw sa in the period from the date of conclusion of the contract until 31.12.2015. Mar 10, 2015 166
Elevators and conveyors. Mar 10, 2015 152
Elevators and conveyors. Mar 10, 2015 121
Hytrol Conveyor and Bastian Solutions Capture India Material Handling Market. Mar 9, 2015 443
Elevators and conveyors. Mar 9, 2015 132
Conveyor hematopoietic stem cells and mononuclear cells to member institutions gcs uniha. Mar 9, 2015 167
Induction type bearing heater for 13a/b and 14a/b conveyors in mm/chp/stg.Iii/dr.Nttps. Mar 9, 2015 132
Supply of steel wire rope for 26, 27a/b, 28a/b conveyors and 29a & 30a/b bunker electric hoists conveyors of chp/stage-iv(1x500 mw). Mar 9, 2015 133
Procurement of Return Rollers for 1000 mm, 1200 mm & 1600 mm width belt conveyors at CHP-A , B & C at CSTPS , CHANDRAPUR. Mar 9, 2015 125
Procurement of Carrying Idlers for Belt conveyors at CHP-B & C at CSTPS, CHANDRAPUR. Mar 9, 2015 117
Fabrication and erection of coal transfer chutes and liner plates of various conveyors at chp. Mar 9, 2015 126
Supply of Spares For Scrapper Conveyor. Mar 9, 2015 111
Modified plate type chain assembly for slag conveyor. Mar 9, 2015 116
Procurement of various types of intermediate structures for belt conveyor. Mar 9, 2015 130
Attending Breakdown / preventive Maintenance works in scrapper conveyor system. Mar 9, 2015 120
Attending break down / preventive maintenance works in scrapper conveyor system and its accessories for the period of 180 days from 01.04.2015 during the year 2015 - 16. Mar 9, 2015 129
Routine cleaning, checking and monitoring the mechanical equipment of Conveyor-48A/B. Mar 9, 2015 111
Transfer of spare parts delivery: glinik 298/800 / bp glinik glinik 724 1024. Mar 9, 2015 255
Hytrol Conveyor and Bastian Solutions Drive Process Improvement at Monoprice. Mar 8, 2015 462
Supply of Spares For Vishwa Make 1X90/2X90 Kw Drive Head/1000Mm Belt Conveyor. Mar 8, 2015 142
Strengthening of supporting joist for conveyor belt. Mar 8, 2015 160
Design, engineering, manufacturing, supply, erection, testing & commissioning of new suspension magnet on conveyor-28 on turnkey jobs at coal handling plant, wtps. Mar 8, 2015 215
Cold rubber lagging on conveyor drum with 20mm thick non fire resistant rubber sheet. Mar 8, 2015 121
Repairing of 800 nos. Of 1000 mm. Bottom belt conveyor rollers. Mar 8, 2015 156
Attending preventive maintenance of pull chord switches in all conveyors. Mar 8, 2015 114
Fabrication, Supply and Erection of Coal retainer plates of size 2060x 1100 mm SS 304 Gr 3mm Thick for conveyor 19. Mar 8, 2015 118
Supply of liner plates suitable for conveyor 71 discharge chute. Mar 8, 2015 107
Establishment of Captive Coal Jetty with unloading facilities and Pipe Conveyor. Mar 7, 2015 130
Our brightest are leaving for England; Views of Wales. Mar 7, 2015 258
Fast Growing Mexican Materials Handling Market Served by Hytrol Conveyor and DILCO SA. Mar 7, 2015 429
Procurement of carrying IDLERS for belt conveyors at CHP-A, CSTPS CHANDRAPUR. Mar 7, 2015 121
Supply of conveyor belt. Mar 7, 2015 153
Jointing of belt conveyor 1400 mm by cold vulcanizing process. Mar 7, 2015 147
Spares for Vishwa make 1x90 /2X90 KW Drive Head/1000mm Belt Conveyor. Mar 7, 2015 206
MTPS-I-CHP.I - Ventilation system in conveyor 1 to 4 and conveyor 6 tail end - cutting and removal. Mar 7, 2015 205
Attending preventive electrical maintenance of conveyor equipments, travelling hoppers and switch gear equipments in Coal Jetty-I. Mar 7, 2015 120
Clearing the spilalge coal on walkways of both sides, return side under belt through out conveyors, deck sheets etc. Mar 7, 2015 128
MAN FIGHTING FOR LIFE AFTER COAL YARD HORROR; Worker, 45, gets 'trapped on conveyor' Man critical after coal belt horror. Mar 6, 2015 157
Cole Prince, Hytrol Conveyor Manager of Product Technology Introduces New Spring Take-Up. Mar 5, 2015 288
Erection Of Fire Fighing System For Stage1 High Rise Conveyors And Stackyard. Mar 5, 2015 106
Attending preventive electrical maintenance of conveyor equipments in Coal Jetty-I. Mar 5, 2015 119
Supply and fixing of fiber reinforced corrugated sheet(FRC transparent) of size Length 3.00 M, width 1.00M and 5mm thick in Conveyor 67. Mar 5, 2015 195
Providing of Conveyors. Mar 5, 2015 182
Providing of Conveyors. Mar 5, 2015 130
March Employee Anniversaries Totaling 580 Years of Service Celebrated at Hytrol Conveyor. Mar 4, 2015 475
Repairing of one no. float conveyor mono drive drum pulley applicable to 1002 conveyor of Piparwar Project. Mar 4, 2015 113
Anti Sparking And Non Magnetic Plate Type Conveyor Belt Fastener. Mar 4, 2015 130
Replacement Of Gear Box Of Drive -2 Of Conveyor Belt C-17, Replacement Of Bearing Material Handling , Partially Repairing, Repairing Of Throat Plate & Ismb 250. Mar 4, 2015 155
Annual contract for work of providing rubber lagging for various pulleys of conveyor belts of chp-a, b, c & cmr at cstps,chandrapur. Mar 4, 2015 129
Picking of stone/boulder and foreign materials from running conveyors of CHP Stage-I & II (4X210MW+3X500) MW unit and wagon tippler of NTPC/KhSTPS; Vide CS: 1005/4824. Mar 4, 2015 109
Grease dispensing unit for mobile conveyors with pressure not less than 140 bar and single phase motor. Mar 4, 2015 126
Procurement of coupling bolt with nut and spacer for slag conveyor for 5 items. Mar 4, 2015 122
Roller For Indexing Mechanism Of Guide Roller Overhead Conveyors. Mar 4, 2015 117
Cleaning of loading point of belt conveyor in -78ln/25rise and 27rise/-75ln. Mar 4, 2015 138
Rubber legging of type; diamond groove and plain rubber of conveyor pulleys. Mar 4, 2015 129
Engineering services of technical equipment in the plant group 6 (conveyors) according to hoai A* 53ff regarding the rehabilitation of 5 schools. Mar 3, 2015 252
Transinstallation of Arrival Slat Conveyor Belt from Bangalore Airport to Vijaywada Airport. Mar 3, 2015 118
Supply of roller type conveyors for cans at various dairy units in ap. Mar 3, 2015 119
Fabrication and erection of conveyor structure for coal handling system at Sijua siding from old/damaged/scrap serviceable iron steel at Katras Area. Mar 3, 2015 105
Belt conveyor (without pvc belting) for nk area of ccl. Mar 3, 2015 137
Repairing of damaged wornout deck plate in btl conveyor,. Mar 3, 2015 126
Replacement of belt piece, repairing of belt conveyor. Mar 3, 2015 134
Repairing of damaged wornout deck plate in btl conveyor, repairing of cr-1 grizzly of interim chp. Mar 3, 2015 128
Pushing of raw coal through grills provided on the hopper cleaning of conveyor no.3a b 4a b chp ii at stps sarni. Mar 3, 2015 104
Procurement of gear box for conveyors 6a & 6b. Mar 3, 2015 116
Washing cleaning of blocked chutes of 3c, 4c and 5c conveyor at bina chp 150 days. Mar 3, 2015 125
Cold rubber lagging on conveyor drums with 20mm thick fire resistance rubber sheet. Mar 3, 2015 133
Renovation cross over platform in the conveyor. Mar 3, 2015 129
Supply of Fixed carrying idler stand for 1400mm conveyor belt. Mar 3, 2015 128
Manual picking of Non Ferrous escaped foreign materials and stones from conveyors. Mar 3, 2015 140
Cleaning of spillage coal on the Jetty floors, walkways, hopper walkways etc., in Conveyor-13. Mar 3, 2015 125
Upkeepment of conveyors and related equipments attending preventive maintenance works in Conveyor-43,46,RC-1,,BFD-9A&9B etc.,. Mar 3, 2015 119
Upkeepment of conveyors and attending breakdown and preventive maintenacnew orks in Conveyors-13,13A etc,. Mar 3, 2015 122
Maintenance of track rails of Conveyor-49 & 54. Mar 3, 2015 117
Fabrication and erection of new height limit post, both side before the conveyor 7A/7B, 8A1/8B1 and providing fencing. Mar 3, 2015 138
Ktps (o&m)-chp-cpb- collection and disposal of scattered coal at 4th stage conveyors. Mar 3, 2015 147
Procurement of idler repair kit for 800 and 1000mm belt conveyor. Mar 3, 2015 115
The contract is for the supply to the mines of jsw sa components and spare parts for conveyors with maturity of 12 months from the date of the agreement. Mar 3, 2015 168
Supply of steel wire rope for 26, 27a/b, 28a/b conveyors and 29a & 30a/b bunker electric hoists conveyors of chp/stage-iv(1x500 mw). Mar 3, 2015 136
Fire hits conveyor belt at King Khaled Airport. Mar 3, 2015 271
Procurement of Hubs for Roller Screen and Carrying Roller Stands for 1200 mm wide conveyor belts. Mar 2, 2015 149
Amc/day to day repairing works of feeder breakers and belt conveyor of 07 nos chp installed at lingaraj ocp for period of one year , as and when required at lingaraj area. Mar 2, 2015 148
Cleaning of spillage coal around feeder breaker belt conveyor line, tail end belt drive, bunker and hopper platform etc. of circuit no.1,2,3 and 4 of chp of balram ocp, hingula area by engaging 10 man. Mar 2, 2015 170
Conveyor spares - 4 items. Mar 2, 2015 113
Outer dust seal for the impact idlers of 2000/1800mm conveyors as per drg. no. cme/mines/63/78. Mar 2, 2015 128
Four items of conveyor spares. Mar 2, 2015 114
Annual Work Of Picking And Disposal Of Iron Pieces From Coal Carried On Conveyor 4A/4B And 9A/9B In Coal Handling Plant Btps Obra. Mar 2, 2015 144
Renovation of gathering belt no. 2 belt conveyor take up circuit structure, take up drum and bend pulley of preparation plant at bhojudih coal washery. Mar 1, 2015 156
Cleaning of spillage coal around feeder breaker belt conveyor line. Mar 1, 2015 157
Annual contract for work of removal, modification and refitting of conveyor roller frames of various Conveyors. Mar 1, 2015 128
Material handling system. Mar 1, 2015 121
Hytrol Conveyor Maintenance Manager Explains Lean Most Important Process in Quality Digest Series. Feb 28, 2015 441
Hitachi offers investments in Egypt. Feb 28, 2015 341
Design detail engineering manufacture testing at manufacturers works inspection by third party and supply and erection of conveyor. Feb 28, 2015 175
Procurement of pulleys for scrapper conveyor. Feb 28, 2015 127
Complete mechanical and electrical maintenance and housekeeping of bf 3 conveyors 46 nos. Feb 28, 2015 117
Fabrication of 1200mm top conveyor rollers,qty.- 3000 nos. Feb 28, 2015 160
Removal of carbon dust scale deposition in lighting equipments in Station A and B internal conveyor system. Feb 28, 2015 124
Supply and fixing of fiber reinforced corrugated sheet(FRC transparent) of size 3.00 MX1.00Mx5mm thick in Conveyor 70 tail end side. Feb 28, 2015 136
TTPS Mech.II AHP Dismantling existing wornout BAH scrapper conveyor feeder travel rails in unit V. Feb 28, 2015 124
Installation of drive head complete as replacement of tb3 belt conveyor drive head. Feb 28, 2015 132
Making of 5(five) nos. cold vulcanizing jointing 1000mm conveyor belt at chp of shobhapur mine. Feb 28, 2015 146
Up keeping of belt conveyors take up unit along with supporting members of conveyor cc4 conveyor belt of preparation plant at bhojudih coal washery. Feb 27, 2015 155
Preventive maintenance of side skirt plates of r2e conveyor belt at bhojudih coal washery. Feb 27, 2015 143
Preventive maintenance of feed chute of rc5e conveyor belt at bhojudih coal washery. Feb 27, 2015 144
Complete repairing and overhauling of gear box u 1700 and its structure base of horizontal belt conveyor at bhojudih coal washery. Feb 27, 2015 150
Preventive maintenance and repair of take up unit of conveyor cc 3 of preparation plant at bhojudih coal washery. Feb 27, 2015 148
Complete maintenance and repair of over head structure of conveyor inclined belt of preparation plant at bhojudih coal washery. Feb 27, 2015 150
Up keeping of conveyor cc3 drive unit structure at bhojudih coal washery. Feb 27, 2015 141
Strengthening and repair of tail drum unit structure of conveyor r3e and inclined belt conveyor and some part of their deck plate at bhojudih coal washery. Feb 27, 2015 157
Dismantling, fabrication, repairing and re erection of chute from feeder no. 1 and 2 conveyor a and c to rom 2 at bhojudih coal washery. Feb 27, 2015 156
Fabrication and replacement of mother and liner plates of different coal conveyor chutes of conveyor belt. Feb 27, 2015 216
Replacement of different sizes of damaged rubber liners and fixing of new liners in discharge chute of conveyor 8c and 18c of nigahi chp. Feb 27, 2015 152
Assistance In Operation (Mgr/Pr) Of Loading System Of Section-Iii And Elevating And Tripper Conveyor Of Section-Ii Ts-Ii) Through Outsourcing At Chp. Feb 27, 2015 152
Carrying out cold vulcanizing of 1400mm & 1800mm width conveyor belt etc. Feb 27, 2015 142
Supply of Spares for Gear Box KZN 500 Flender make (Siemens) or equivalent for Conveyor 48A/B Drives. Feb 27, 2015 192
Fabrication, Supply and Erection of Rubber Lagged Troughing Idlers for 1400mm Width Conveyor Belt. Feb 27, 2015 175
Hytrol Conveyor New E24i Video Explains Motor Driven Roller Conveyor. Feb 27, 2015 332
Procurement of various types of carrying idler sets and return rollers for belt conveyor system. Feb 27, 2015 130
Procurement of various types of intermediate structures for belt conveyor on rate contract for a period of 2 years. Feb 27, 2015 124
Preventive maintenance and repair of conveyor gathering belt no 1 R2E and CC4 belts structure,. Feb 26, 2015 171
Maintenance, repair and overhauling of 2 nos. u 1200 gear box conveyor gathering belt no. 1 and 2 along with structure base at bhojudih coal washery. Feb 26, 2015 157
Repairing and maintenance of drive unit structure of belt rc2 and rc4e belt conveyor at bhojudih coal washery. Feb 26, 2015 149
Strengthening of overhead structure of conveyor r2e of preparation plant at bhojudih coal washery. Feb 26, 2015 143
Lagging of different conveyor drums by cold vulcanizing process of rom section at bhojudih coal washery. Feb 26, 2015 147
Preventive maintenance and repair of drive unit structure of conveyor cc1 and cc2 at bhojudih coal washery. Feb 26, 2015 148
Preventive maintenance and repair of conveyor gathering belt no 1 r2e and cc4 belts structure, deck plate carrying and return rollers at bhojudih coal washery. Feb 26, 2015 156
Supply of Linear chain conveyor. Feb 26, 2015 192
Supply of nylon fabric oil resistant conveyor belt. Feb 26, 2015 144
Procurement of Impact Idlers for 1800 mm Belt conveyor & Flat Return Rollers for 1200 m Con. system for CHP-II, 500 MW Unit, Khaperkheda. Feb 26, 2015 139
Procurement of Carrying Idler Frames for 1200 mm wide Belt Conveyor for CHP II, T.P.S. Khaperkheda. Feb 26, 2015 141
Construction of rcc retaining wall for b4 conveyor re-routing in mine-ii. Feb 26, 2015 142
Statutory testing of lifting machines and tackles, lifts, safety belts and conveyors. Feb 26, 2015 155
Screw Conveyor For Cleaning And Peening Machine. Feb 26, 2015 117
Replacement of screw segment for screw conveyors in pap. Feb 26, 2015 121

Terms of use | Copyright © 2015 Farlex, Inc. | Feedback | For webmasters