Printer Friendly
The Free Library
19,573,962 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

Consolidated Thompson Announces Results Of 43-101 Review Of The Bloom Lake Iron Ore Property, Quebec & Commencement Of 2005 Work Program.


TORONTO -- (CCNNMatthews - July 7, 2005) - Consolidated Thompson-Lundmark Gold Mines Limited (TSX TSX Toronto Stock Exchange (TSE before April, 2002)
TSX Transfer from Stack Pointer to Index
TSX True Space Extension
 VENTURE:CLM CLM - Career Limiting Move ) ("CLM" or "the Company")) is pleased to announce results of the recently completed 43-101 review of the Bloom Lake Iron Ore Property carried out by international consulting firm Noun 1. consulting firm - a firm of experts providing professional advice to an organization for a fee
consulting company

business firm, firm, house - the members of a business organization that owns or operates one or more establishments; "he worked for a
 Watts, Griffis and McOuat Limited, Consulting Geologists and Engineers (WGM WGM Whispering Gallery Mode (microresonators)
WGM Women's Grandmaster
WGM Work Group Manager
WGM World Gone Mad (Austin, Texas drum and bugle corps)
WGm West Germanic (linguistics) 
), of Toronto. The Bloom Lake property is located in northeastern Quebec in the southwest portion of the Labrador Trough, only 10 km from the Mont-Wright iron mining operation of Quebec Cartier Mining Company. Watts, Griffis and McOuat Limited ("WGM") was retained by CLM to carry out an independent technical study of the property, in particular to confirm that a 1998 "mineral resource" estimate which was prepared on the Bloom Lake deposit by WGM for Quebec Cartier Mines was prepared in accordance with National Instrument 43-101 ("NI 43-101") guidelines and standards and to reclassify Verb 1. reclassify - classify anew, change the previous classification; "The zoologists had to reclassify the mollusks after they found new species"
class, classify, sort out, assort, sort, separate - arrange or order by classes or categories; "How would you
 the resulting Mineral Resource estimate according to according to
prep.
1. As stated or indicated by; on the authority of: according to historians.

2. In keeping with: according to instructions.

3.
 NI 43-101 classification criteria. The report was authored by Richard W. Risto, P.Geo., Senior Associate Geologist, H.E. ("Buzz") Neal, P.Eng., Senior Associate Geologist, and Michael W. Kociumbas, P.Geo., Vice-President and Senior Geologist, all qualified persons under NI-43-101. The study is available online on SEDAR SEDAR System for Electronic Document Analysis and Retrieval
SEDAR Southeast Data, Assessment, and Review
.

Based on the results of the 1998 field exploration and bench-scale metallurgical testing programs and the interpretation of their results, and the review and reclassification Reclassification

The process of changing the class of mutual funds once certain requirements have been met. These requirements are generally placed on load mutual funds. Reclassification is not considered to be a taxable event.
 of the Bloom Lake Mineral Resource estimate, WGM stated that: "WGM is satisfied that the 1998 estimate was prepared in a manner that respects these requirements and has reclassified the 1998 figures to meet the classification requirements now in place."

The block model Mineral Resource, tabulated by cutoff grade tranches, is summarized in the following table:
Total in situ Mineral Resources at a Cutoff Grade of 15% Total Fe
--------------------------------------------------------------------

Resource      Volume    Tonnage    Average
Category       bcm(i)    tonnes     Grades
              x 1,000   x 1,000  Total Fe%  Magnetite%   CaO%   MgO%
--------------------------------------------------------------------
Measured      141,350   488,465      29.91       10.54   2.32   2.18
Indicated      43,372   149,232      29.29       10.55   2.37   2.15
Meas. + Ind.  184,722   637,697      29.76       10.54   2.33   2.17
Inferred       10,322    35,697      30.97        8.47   0.84   0.82



(i) Bulk cubic metre Noun 1. cubic metre - a metric unit of volume or capacity equal to 1000 liters
cubic meter, kiloliter, kilolitre

metric capacity unit - a capacity unit defined in metric terms
 - A historic unit of measure in the iron ore industry

The Inferred Resource is in addition to the Measured and Indicated Resource.

Based on WGM's knowledge of the geology and mineralogy mineralogy

Scientific study of minerals, including their physical properties, chemical composition, internal crystal structure, occurrence and distribution in nature, and origins or conditions of formation.
 of the deposit, the limited metallurgical testwork carried out and the economics of the iron deposits of the area, a 15% Fe cutoff grade was used for the Mineral Resource estimate. The Measured and Indicated block model Mineral Resource estimated for the Bloom Lake deposit on the CLM property using a 15% Fe cutoff and an inverse distance squared ("IVD (Interactive VideoDisc) See interactive video. 2") grade interpolation interpolation

In mathematics, estimation of a value between two known data points. A simple example is calculating the mean (see mean, median, and mode) of two population counts made 10 years apart to estimate the population in the fifth year.
 technique, totalled 638 million tonnes grading 29.76% Total Fe and 10.54% Magnetite magnetite (măg`nətīt), lustrous black, magnetic mineral, Fe3O4. It occurs in crystals of the cubic system, in masses, and as a loose sand. . Measured , indicated, and inferred resources were all calculated and classified using NI 43-101 guidelines and CIM (1) (Computer-Integrated Manufacturing) Integrating office/accounting functions with automated factory systems. Point of sale, billing, machine tool scheduling and supply ordering are part of CIM.  Standards. A 15% Fe cutoff was used and was based on that employed at operating mines in the Labrador Trough exploiting deposits similar to Bloom Lake. Measured Resources are defined as OIF OIF Operation Iraqi Freedom
OIF Organisation Internationale de la Francophonie (French: International Organization of Francophonie)
OIF Office for Intellectual Freedom (American Library Association) 
 mineralization Mineralization
The process by which the body uses minerals to build bone structure.

Mentioned in: Rickets

mineralization,
n the bioprecipitation of an inorganic substance.
 no greater than 75 m from drillhole intersections within the interpreted geological boundaries. Indicated Resources are defined as OIF mineralization between 75 m and 150 m from drillhole intersections. This mineralization is the deeper OIF and represents larger drillhole spacings and less confidence in the geological interpretation. Inferred Resources are defined as OIF mineralization between 150 m and 400 m from drillhole intersections. This mineralization only occurs on the fringes On The Fringe is a popular Pakistani television show on Indus Music. It is hosted and scripted by the eccentric television host and music critic, Fasi Zaka and directed by Zeeshan Pervez.  of the deposit and represents a very minor amount (about 5%) of the OIF.

The following Specific Gravities (SGs) were used:

OIF: Variable Density Model (IVD2)

QR: 2.77; SIF: 3.37; AMP: 3.19; QRIF: 2.94; MS: 2.80

The report also recommended a significant 2005 program designed to establish the optimum bench-scale metallurgical flowsheet for resource material from the deposit and to study, in a preliminary manner, the various parameters, which would determine the economic viability of an eventual mining and processing operation at Bloom Lake.

Watts, Griffis and McOuat Limited, Consulting Geologists and Engineers have been engaged to carry out and manage the 2005 work program and study of the Bloom Lake iron deposit.

The program, which began on June 20, 2005, will consist of the following elements:

- Collecting 10 representative mini-bulk samples of approximately 500 kg each from different portions of the deposit;

- Carrying out a series of grinding and metallurgical bench tests on these samples at SGS Lakefield Research;

- Based on these test results establishing the optimum flowsheet for the Bloom Lake deposit material;

- Carrying out preliminary Capital Expenditure and Operating Expenditure studies;

- Carrying out preliminary marketing and transportation studies;

- Carrying out a preliminary open pit optimization study in a series of runs using Whittle(TM) software; and

- Combining the results of the studies mentioned above and preparing a preliminary cash flow study and sensitivity analysis of an open pit mining and processing operation at Bloom Lake.

It is expected that the program will be completed in early October.

"We are very pleased to have confirmed the resource size and quality of the Bloom Lake Deposit and to have a firm with the experience and reputation of WGM undertaking the ongoing work program. The Bloom Lake property represents a significant resource of Iron Ore located in an area with substantial existing mining and transportation infrastructure. Iron Ore prices have also risen significantly over the last year due to rising global demand, greatly improving the economics in the global iron ore industry and of the Labrador area as well as the attractiveness of the Bloom Lake deposits." stated Stan Bharti, President and Chief Executive Officer of Consolidated Thompson-Lundmark Gold Mines Ltd.

Doug Currie, MAusIMM, consultant to the Company, is the Qualified Person for this release under NI-43-101.

Consolidated Thompson-Lundmark Gold Mines Ltd. is an exploration and development company. The Company has approximately 10 million shares outstanding and trades on the TSX Venture exchange TSX Venture Exchange

Originally called the Canadian Venture Exchange (CDNX), this was a result of the merger of the Vancouver and Alberta stock exchanges. The goal of TSX Venture Exchange is to provide venture companies with effective access to capital while protecting investors.
 under the symbol (CLM).

The Company is advancing the Bloom Lake Iron Ore Property, located in Duplessis County, Quebec, on the south end of the Labrador Trough, approximately 400 km north of Sept-Iles. The Bloom Lake deposit hosts an NI 43-101-compliant Measured plus Indicated Mineral Resource of 637,697,000 tonnes grading 29.76% total Fe.

On June 1, 2005 the Company announced the completion of a private placement financing for gross proceeds of $1,048,199.68 as well as a number of significant board and management changes which have strengthened the Company's ability to advance The Bloom Lake Deposit and other opportunities in the Iron Ore area.

THE TSX VENTURE EXCHANGE DOES NOT ACCEPT RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

THE TSX VENTURE EXCHANGE HAS NOT REVIEWED AND DOES NOT ACCEPT RESPONSIBILITY FOR THE ACCURACY OF THIS NEWS RELEASE.

Consolidated Thompson-Lundmark Gold Mines Limited (TSX VENTURE:CLM)
COPYRIGHT 2005 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2005, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Geographic Code:1CANA
Date:Jul 7, 2005
Words:1156
Previous Article:The Talbots, Inc. to Present at CIBC World Markets Fifth Annual Consumer Growth Conference.
Next Article:Air Liquide America L.P. Announces Price Increases.



Related Articles
Exploration by junior firms reduced despite interest generated by mapping.
Augyva Acquires a Major Iron Ores Deposit in James Bay Area.
Consolidated Thompson Announces Private Placement and New Management Team and Reactivates Work on its Bloom Lake Iron Ore Deposit in Quebec.
Consolidated Thompson Signs Provisional Agreement with Prosperity TCMA Mining Limited to Finance Bloom Lake & Purchase its Iron Ore Production for...
Consolidated Thompson Receives Positive Scoping Study On Its Bloom Lake Iron Deposit & Initiates Full Bankable Feasibility.
Consolidated Thompson to Attend the Vancouver Resource Investment Conference, January 22-23, 2006.
Consolidated Thompson Appoints Richard Quesnel as Chief Executive Officer and Director.
Consolidated Thompson Exhibiting At PDAC 2006.

Terms of use | Copyright © 2012 Farlex, Inc. | Feedback | For webmasters | Submit articles