Printer Friendly
The Free Library
19,607,059 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

Consolidated Puma Minerals Corp.: Continued High Grade Results from East Chuarvi Drilling.


VANCOUVER, British Columbia British Columbia, province (2001 pop. 3,907,738), 366,255 sq mi (948,600 sq km), including 6,976 sq mi (18,068 sq km) of water surface, W Canada. Geography
 -- Consolidated Puma Minerals Corp. (TSXV:CPW (1) (Commercial Processing Workload) An IBM metric for system performance. CPW is designed for business applications that have a significant amount of input/output. ), a 55% owned affiliate of Bema Gold Bema Gold Corporation is a Vancouver, British Columbia based intermediate gold producer with operating mines and development projects in Russia, South Africa, Chile and Canada.  Corporation (TSX TSX Toronto Stock Exchange (TSE before April, 2002)
TSX Transfer from Stack Pointer to Index
TSX True Space Extension
:BGO BGO Bismuth Germanate
BGO Baguio City (Philippines)
BGO Blinding Glimpse of the Obvious
BGO Bergen, Norway - Flesland (Airport Code)
BGO Blue and Gold Officer (United States Naval Academy) 
)(AMEX AMEX

See: American Stock Exchange
:BGO)(AIM:BAU BAU Business As Usual
BAU Bangladesh Agricultural University
BAU Beirut Arab University (Lebanon)
BAU Behavioral Analysis Unit (FBI NCAVC)
BAU Al-Balqa' Applied University (Jordan) 
) is pleased to announce diamond drilling Diamond Drilling is a highly specialized industry used for mineral exploration around the world. Most commonly using wireline and core bits with diamond encrusted matrix. To drill holes to max depths of twelve thousand feet, for the recovery of core used in verifying mineral  results from the ongoing exploration program on the East Pansky Platinum Group The platinum group (alternatively, the platinum group metals or platinum metals) is a collective name sometimes used for six metallic elements clustered together in the periodic table.  Elements ("PGE PGE Pacific Gas and Electric Company
PGE Portland General Electric
PGE Prostaglandin E
PGE Platinum Group Elements
PGE Pacific Great Eastern (Railroad)
PGE Phenyl Glycidyl Ether
PGE Perfect Girl Evolution
") property. East Pansky is located in the Kola Peninsula Kola Peninsula (kō`lə, Rus. kô`lə), peninsula, c.50,000 sq mi (129,500 sq km), NW European Russia, in Murmansk region. Forming an eastern extension of the Scandinavian peninsula, it lies between the Barents Sea to the north and the  of northwestern Russia on the eastern border of the Federova Tundra tundra (tŭn`drə), treeless plains of N North America and N Eurasia, lying principally along the Arctic Circle, on the coasts and islands of the Arctic Ocean, and to the north of the coniferous forest belt.   project where Barrick Gold Barrick Gold Corporation TSX: ABX NYSE: ABX is the largest pure gold mining company in the world, with its headquarters in Toronto, Ontario, Canada; and four regional business units (RBU's) located in Australia, Africa, North America and South America.  Corporation is currently evaluating an advanced PGE exploration program.

Puma has drilled 73 holes for a total of 13,387 metres on the East Chuarvi target to date. Highlights of the recent drilling results are: P-413 with 5.5 metres grading 11.18 grams per tonne tonne

measure of weight or mass; 1 tonne=1000 kg. See also ton.
  (g/t) PGE + Gold ("Au"), P-417 with 7.1 metres at 4.52 g/t PGE+Au, and P-426 with 2.1 m at 17.88 g/t PGE+Au. The high grade mineralized min·er·al·ize  
v. min·er·al·ized, min·er·al·iz·ing, min·er·al·iz·es

v.tr.
1. To convert to a mineral substance; petrify.

2. To transform a metal into a mineral by oxidation.

3.
  horizon, which was the focus of a detailed drilling program during 2004, can be traced for at least 35 kilometres along strike and the majority of this horizon has yet to be drill tested. Continuity of mineralization Mineralization
The process by which the body uses minerals to build bone structure.

Mentioned in: Rickets

mineralization,
n the bioprecipitation of an inorganic substance.
 is confirmed across 1,400 metres at East Chuarvi with a high grade core of 600 metres in strike length and to a depth of at least 250 metres. The system remains open along strike and down dip.
Selected results from the recent program are as follows:

--------------------------------------------------------------------
                   From      To  Length     Au     Pt     Pd  PGE+Au
Hole #               (m)     (m)     (m)  (g/t)  (g/t)  (g/t)   (g/t)
--------------------------------------------------------------------
P-402            216.80  218.10    1.30   0.07   0.87   2.07    3.01
P-407             71.30   74.30    3.00   0.19   1.21    1.3    2.71
                 253.50  254.00    0.50   0.15   1.62   5.69    7.46
P-413             89.60   90.00    0.40    0.3   3.13   7.75   11.18
                 122.20  122.90    0.70   0.31   1.82   4.17    6.30
                 124.50  125.20    0.70   0.13   1.39   6.46    7.98
                 129.20  134.70    5.50   0.47   3.38   7.33   11.18
P-414             63.30   63.75    0.45   0.22    1.9    5.4    7.52
                  65.70   68.60    2.90   0.12    1.4   3.11    4.63
                  71.30   71.80    0.50   0.15   1.64    3.8    5.59
                  79.50   80.10    0.60   0.19    1.3   3.91    5.40
                  83.60   84.10    0.50   0.21   2.04   3.71    5.96
P-415             48.10   49.40    1.30   0.27   2.81   6.54    9.62
                  51.00   52.40    1.40    0.2   1.88   4.09    6.17
P-416             42.30   45.50    3.20    0.1   0.81    1.7    2.61
P-417            125.80  127.80    2.00   0.04    0.3   0.71    1.05
                 133.30  140.40    7.10   0.24    1.3   2.98    4.52
                 142.00  142.50    0.50   0.61   3.58   9.09   13.28
P-418            126.20  127.40    1.20   0.18   1.16   2.45    3.79
P-419            158.90  160.50    1.60    0.4   2.06   5.12    7.58
P-420            129.60  130.10    0.50   0.01    1.4   2.75    4.16
P-422             20.90   24.70    3.80   0.24   2.23   4.12    6.59
P-423             15.00   16.40    1.40   0.28   2.83   6.14    9.25
                  40.80   43.00    2.20   0.08    0.7   1.52    2.30
P-424            118.00  119.00    1.00   0.38   2.44   5.16    7.98
P-425             12.00   16.50    4.50   0.08    0.9   2.21    3.19
 incl             12.00   13.30    1.30    0.2      2   5.43    7.63
P-426               8.0    10.1     2.1   0.39   5.97  11.52   17.88
                   35.9    40.1     4.2  0.114   0.89   2.17    3.17
--------------------------------------------------------------------



Assays are pending from an additional 21 holes at the East Chuarvi target where drilling is ongoing and remains focused on expanding the known mineralized zone along strike and at depth. A further 5,000 to 7,000 metres of diamond drilling is planned in 2005 as well as geological mapping and sampling of the new Kuksha license to the southeast.

It was recently discovered, during re-checking of lab data, that part of the results from hole P-393 were incorrectly reported. The high grade intercept intercept

in mathematical terms the points at which a curve cuts the two axes of a graph.
 of 20.88 g/t PGE+Au over 0.6 m in drill hole P-393 (reported in news release dated November 22, 2004) was an error due to a mix up of samples at the lab. Following are the results of P-393 including the corrected sample:
------------------------------------------------------------------
                 From      To  Length     Au     Pt     Pd  PGE+Au
Hole #             (m)     (m)     (m)  (g/t)  (g/t)  (g/t)   (g/t)
------------------------------------------------------------------
P-393          164.90  165.40    0.50   0.33   2.51   6.32    9.16
               147.20  155.00    7.80   0.12   1.01   1.91    3.04
               169.40   170.0    0.60  0.010  0.025  0.010   0.045(i)
------------------------------------------------------------------
(i) Corrected Sample



The QA/QC QA/QC Quality Assurance/Quality Control  program is set up to prevent lab problems, but samples mixed up are difficult to detect with such a program. This hole is part of a multitude of infill in·fill  
n.
1. The use of vacant land and property within a built-up area for further construction or development, especially as part of a neighborhood preservation or limited growth program.

2.
 holes drilled in the zone. This ore sample was not material to the program. The other 2 intersections within hole P-393 are still correct.

On behalf of CONSOLIDATED PUMA MINERALS CORP.

Roger Richer, President and Director

Consolidated Puma Minerals Corp. trades on the TSX Venture Exchange TSX Venture Exchange

Originally called the Canadian Venture Exchange (CDNX), this was a result of the merger of the Vancouver and Alberta stock exchanges. The goal of TSX Venture Exchange is to provide venture companies with effective access to capital while protecting investors.
 under the symbol CPW.

The common shares and warrants described herein and any securities which may be issued thereunder have not been and will not be registered under the U.S. Securities Act of 1933 as amended and may not be offered or sold in the U.S. or to a U.S. person in the absence of such registration or an exemption therefrom there·from  
adv.
From that place, time, or thing.

Adv. 1. therefrom - from that circumstance or source; "atomic formulas and all compounds thence constructible"- W.V.
. Some of the statements contained in this release are forward-looking statements forward-looking statement

A projected financial statement based on management expectations. A forward-looking statement involves risks with regard to the accuracy of assumptions underlying the projections.
, such as estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Since forward-looking statements address future events and conditions, by their very nature, they involve inherent risks and uncertainties. Actual results in each case could differ materially from those currently anticipated in such statements.

The QA/QC procedure involves 1 standard, 1 blank, 1 splitter duplicate and 1 field duplicate every batch of 24 samples and to date all QA/QC evaluations have performed within acceptable limits.

Drill core assays for this project have been performed by Assayers Laboratory, Canada and Mekhanobr Laboratory in St Petersburg, Russia. Tom Garagan is acting as the Qualified Person on the project.
--------------------------------------------------------------------
            LOCATION     LOCATION  LOCATION
HOLE               X            Y         Z   LENGTH   AZIMUTH   DIP
--------------------------------------------------------------------
P-402      630611.60   7479968.00    252.23   250.00        28   -60
--------------------------------------------------------------------
P-403      630453.10   7480092.00    259.52   266.10        28   -60
--------------------------------------------------------------------
P-404      630651.80   7480375.00    263.94   225.00        28   -60
--------------------------------------------------------------------
P-405      630288.10   7480208.00    263.78   270.40        28   -60
--------------------------------------------------------------------
P-407      630027.60   7480364.00    258.27   285.30        28   -60
--------------------------------------------------------------------
P-413      630583.40   7480128.00    260.37   170.00        28   -60
--------------------------------------------------------------------
P-414      630647.90   7480139.00    259.69   120.00        28   -60
--------------------------------------------------------------------
P-415      630830.20   7479969.00    246.57   159.20        28   -60
--------------------------------------------------------------------
P-416      630562.20   7480195.00    263.61   121.00        28   -60
--------------------------------------------------------------------
P-417      630623.40   7480093.00    257.71   177.30        28   -60
--------------------------------------------------------------------
P-418      630539.60   7480151.00    261.65   149.40        28   -60
--------------------------------------------------------------------
P-419      630741.00   7480001.00    250.59   191.90        28   -60
--------------------------------------------------------------------
P-420      630663.60   7480066.00    255.57   156.00        28   -60
--------------------------------------------------------------------
P-421      630484.30   7480153.00    262.14   199.00        28   -60
--------------------------------------------------------------------
P-422      630701.90   7480142.00    258.75    79.50        28   -60
--------------------------------------------------------------------
P-423      630783.70   7480081.00    253.43    79.70        28   -60
--------------------------------------------------------------------
P-424      630414.70   7480234.00    266.52   242.30        28   -60
--------------------------------------------------------------------
P-425      630665.80   7480175.00    260.93    79.90        28   -60
--------------------------------------------------------------------



The TSX Venture Exchange neither approves nor disapproves the information contained in this News Release.

Consolidated Puma Minerals Corp. (TSX VENTURE:CPW)
COPYRIGHT 2005 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2005, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Date:Feb 1, 2005
Words:1382
Previous Article:Tensilica Presents at DesignCon 2005 Conference; Tensilica Chosen to Discuss Business Impact of Electronic System-Level Design.
Next Article:Fairchild Semiconductor's RF Power Amplifier Chosen by Pantech & Curitel for Cell Phone Applications.



Related Articles
PUMA MINERALS - ADDITIONAL DRILL RESULTS USPALLATA PROJECT, ARGENTINA.
El Salado Drilling Resumes - Uspallata Project, Argentina.
Puma Announce Latest Drilling and Summer Mapping/Sampling Results on East Pansky PGE Property.
Puma Announces Latest Drilling Results on East Pansky PGE Property.
Puma Releases Drill Results from East Pansky PGE Property.
Puma Announces Drill Results on East Pansky PGE Property.
Consolidated Puma Minerals Corp.: High Grade Results from East Chuarvi Drilling.
Consolidated Puma Minerals Corp.: Latest High Grade Results from East Chuarvi Drilling.
Consolidated Puma Minerals Corp.: 2006 Exploration Drill Program Commences at East Pansky PGE Property.
Consolidated Puma Minerals Corp.: Initial 2006 Exploration Drill Program Results from East Pansky PGE Property.

Terms of use | Copyright © 2012 Farlex, Inc. | Feedback | For webmasters | Submit articles