Printer Friendly
The Free Library
19,607,059 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

Confirmation drilling upgrades reserves at Sentinel Deposit, Lisbon Valley; Lisbon Valley reserves now total 39,369,000 tons grading 0.49% copper.


VANCOUVER, British Columbia--(BUSINESS WIRE)--Jan. 16, 1995--SUMMO MINERALS CORPORATION is pleased to announce results from eight 1994 RVC RVC Royal Veterinary College (London, UK)
RVC Rock Valley College (Illinois)
RVC Regional Value Content
RVC Rockville Centre, New York
RVC Reverse Voice Channel (Cellular Term) 
 confirmation holes drilled in a "Z" pattern across the Sentinel deposit at Lisbon Valley have been received. Lisbon Valley is an advanced stage soluble soluble /sol·u·ble/ (sol´u-b'l) susceptible of being dissolved.

sol·u·ble
adj.
Capable of being dissolved, especially easily dissolved.
 copper project located in southeastern Utah.

The results from the eight holes indicate the presence of 27% more copper than indicated by historical drilling on the deposit and upon which the previously announced Sentinel ore reserve was based. Most of the old holes were rotary Rotary can refer to:
  • Rotary engine, a type of internal combustion engine from the early 20th century
  • Rotary Woofer, a type of loudspeaker capable of very low frequency sound
  • Rotary International, a service organization
  • Rotary milking shed
 holes drilled in the early 1970's when sampling methods, precision, and accuracy were not as closely monitored as they are today. These results allow us to increase the copper contained in the previous Sentinel ore reserve estimate by 25%, based upon a 15% increase in tons and a 10% increase in grade.

-0-

LISBON VALLEY PROJECT
SENTINEL DEPOSIT - CONFIRMATION DRILLING


     1970 Drilling          Hole     1994 Drilling
Thickness     % Cu          No.    Thickness  %Cu    Copper
____________________________________________________________
 30 feet      0.32          94S1    75 feet   0.30   +135%
110 feet      0.31          94S2   110 feet   0.31     -
 50 feet      0.29          94S3    80 feet   0.29    +60%
 50 feet      0.31          94S4    40 feet   0.43    +11%
 50 feet      0.24          94S5    40 feet   0.42    +40%
 70 feet      0.36          94S6    85 feet   0.29    -02%
 70 feet      0.29          94S7    90 feet   0.33    +46%
 70 feet      0.26          94S8    55 feet   0.36    +09%
____________________________________________________________
AVERAGE
 62 feet      0.30                  72 feet   0.33    +27%
____________________________________________________________






Summo Minerals Corporation now carries a new internally calculated reserve at the Sentinel deposit of 7,213,000 tons grading 0.34% Cu. These are minable reserves, engineered with pit designs, recommended pit slopes and haulage ramps. Strip ratio for this reserve is 0.31/1. The Sentinel orebody has a documented heap leach leach  
v. leached, leach·ing, leach·es

v.tr.
1. To remove soluble or other constituents from by the action of a percolating liquid.

2.
 recovery of 93% at -3 inch crush within 30 days leach time. Acid consumption on this orebody is very low, averaging 20 lbs. acid/ton ore (2.5 lbs. acid/lb. Cu).

Total reserves for the Lisbon Valley Project now stand at 39,369,000 tons grading 0.49% Cu at a strip ratio of 2.07/1 (See News Release #94-06, dated December 15, 1994). In addition, drilling of nearly seventy holes during 1994 designed to expand the reserves at the Sentinel, Centennial, and GTO GTO Gran Turismo Omologato (Ferrari & Pontiac models)
GTO Go To
GTO Guanajuato (México)
GTO Great Teacher Onizuka (Japanese series)
GTO Geosynchronous Transfer Orbit
 deposits has been completed and assay data are anticipated to be released in the first quarter of 1995.

The new reserve figures will be incorporated into the feasibility study The analysis of a problem to determine if it can be solved effectively. The operational (will it work?), economical (costs and benefits) and technical (can it be built?) aspects are part of the study. Results of the study determine whether the solution should be implemented.  currently underway on the entire Lisbon Valley project to quantify Quantify - A performance analysis tool from Pure Software.  the economics of placing the property into production as an acid heap leach copper mine with a projected annual capacity of +30 million pounds of copper.

-0-

The Vancouver Stock Exchange Vancouver Stock Exchange (VSE)

A securities and options exchange in Vancouver, British Columbia, (Canada), specializing in venture capital companies.


Vancouver Stock Exchange

See Canadian Venture Exchange (CDNX).
 has not reviewed and does not accept responsibility for the adequacy or accuracy of this press release.

CONTACT: Summo Minerals Corp., Vancouver

Matt Mason Matt Mason is a poet based in Omaha, Nebraska. He has published eight chapbooks and one full-length work of poetry as well as two anthologies. Mason has written about relationship, religion and the Bible, and themes of Midwest and Great Plains life. , 604/687-7545
COPYRIGHT 1995 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 1995, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Date:Nov 16, 1995
Words:484
Previous Article:Pinpoint Retail Solutions announces record sales for third quarter.
Next Article:Quebecor Printing Inc. takes control of Hunterprint.
Topics:



Related Articles
Noranda pushing on despite lack of investor interest.
FREEPORT-McMoRan COPPER & GOLD ANNOUNCES UPDATE OF EXPLORATION ACTIVITIES.
Centurion Mines announces large increase in ore reserves at its OK copper deposit near Milford, Utah.
SUMMO MINERALS -- NEWS UPDATE -- DRILLING COMMENCES AT CASHIN COPPER PROPERTY, COLORADO; FIELDWORK COMMENCES AT CHAMPION COPPER PROPERTY, NEW MEXICO;...
SUMMO MINERALS - POSITIVE FEASIBILITY STUDY DELIVERED FOR LISBON VALLEY COPPER PROJECT.
Summo Minerals Corp. - Lisbon Valley Copper Project 1995 Drilling Results Extend Reserves Progress On Draft EIS Document.
Summo Minerals announces 1995 year end financial results.
Summo Minerals - Lisbon Valley Copper Project Draft Environmental Impact Statement Published Project Development Recommended.
Consolidated Nevada Goldfields Corporation announces fiscal 1997 first quarter results and details Mexican acquisition.
TVX Gold Inc. - Further Update on Skouries Project.

Terms of use | Copyright © 2012 Farlex, Inc. | Feedback | For webmasters | Submit articles