Printer Friendly
The Free Library
19,607,059 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

Comalco announces Short-listed Bidders for Gladstone Co-Generation Power Station.


LONDON--(BUSINESS WIRE)--December 22, 1998--Rio Tinto Tin´to

n. 1. A red Madeira wine, wanting the high aroma of the white sorts, and, when old, resembling tawny port.
 plc (NYSE NYSE

See: New York Stock Exchange
: RTP (1) (Rapid Transport Protocol) The protocol used in IBM's High Performance Routing (HPR) system.

(2) (Realtime Transport Protocol) An IP protocol that supports real time transmission of voice and video.
) today announced that Comalco has determined a short list of five bidders for a gas fired co-generation power station at Gladstone, Queensland For other uses, see Gladstone (disambiguation).

Gladstone is an industrial port city located on the coast of Queensland, Australia. The city's population stands at 29,288 (2006 estimate), of whom 3.
, Australia. The five selected parties are:

--   CS Energy Limited
--   Edison Mission Energy Holdings Pty Ltd
--   NRG Asia-Pacific Limited
--   Sithe Energies Australia Pty Ltd
--   Stanwell Corporation Limited


The co-generation power station will form an integral part of Comalco's Gladstone alumina refinery project. Each party will be bidding for the right to build, own and operate the co-generation power station to provide steam and electricity to the proposed alumina refinery using Papua New Guinea Papua New Guinea (păp`ə, –y  gas. Comalco has the right to retain part ownership in the power station.

Mr Terry Palmer Terry Palmer (born 26 April 1972 in Dublin) was an Irish soccer player during the 1990s and 2000s.

He made his University College Dublin A.F.C. debut on the 27th of January 1991 and played for the club for seven seasons before transferring to Shamrock Rovers in 1998.
, Comalco's Chief Executive said, "There are two crucial matters to be finalised in relation to Gladstone before the bidding process can proceed with the five selected parties. Firstly, the inclusion of Hides Gas into the gas reserves available for the Papua New Guinea gas project. Secondly, an agreement on gas price with the Papua New Guinea project developers."

Mr Palmer emphasised that the short-listing of power station bidders for Gladstone did not mean that a final site had been selected for the refinery project. He said, "The alumina refinery will be located at either Gladstone, Queensland or Sarawak, Malaysia. This bidding process relates only to the Queensland option.

"I hope that the various outstanding matters in relation to both Gladstone and Sarawak can be resolved quickly so that a decision on a preferred site can be made. Then we can proceed with final feasibility to determine whether the refinery makes sound economic sense. Only then can the final investment decisions be made."
COPYRIGHT 1998 Business Wire
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 1998, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Publication:Business Wire
Geographic Code:8AUQU
Date:Dec 22, 1998
Words:282
Previous Article:Internet Commerce Race Is a Two-Tiered Playing Field.
Next Article:Juina Mining Completes Funding and Prepares for Production.



Related Articles
Hydro dims the future of private generation by cancelling projects.
Hydro pulls the plug on much-needed jobs.
Ether plant proposal pits Sudbury against Ont. Hydro, province.
Private generation projects dealt a severe blow by Hydro.
APPLICATIONS APPROVED UNDER BANK MERGER ACT.
OMAN - The Sohar Fertiliser Project.
Wendell Gladstone: Roberts & Tilton.
MHI Receives Successive GTCC Orders From Korea Western Power and Korea District Heating.
Airline Finance News - Europe.
Company Watch - Alitalia.

Terms of use | Copyright © 2012 Farlex, Inc. | Feedback | For webmasters | Submit articles